Loading...
HomeMy WebLinkAboutSOIL DENSTIY TESTS - Teton River Flats Community Housing - 4PlexFile Name: Density's for building B1 6b732a02d06109d4-1611858053950 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson Project Name: Teton River Flats Instrument ID 78653 Daily Standardization: Client: Headwaters Construction Date: 01/28/2021 MS: 661 DS: 2595 Time Start: 09:51 AM Time End: 11:34 AM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 SE corner of building B1 Top of second lift 8 147.5 140.8 4.7 141.1 Material Type Pit Run 99.79 2 North side of building approximately equal distance east and west. Top of second lift 8 147.1 141.1 4.3 141.1 Material Type Pit Run 100.00 3 South west corner of building Top of second lift 8 141.4 135.6 4.3 141.1 Material Type Pit Run 96.10 4 North east corner of building approximately 10 feet from north side. Top of 2nd lift 8 144.9 137.9 5.1 141.1 Material Type Pit Run 97.73 Remarks: Tested By: Keith Drake Signature: Date: 01/28/2021 Reviewed By: Tyson Falls Signature: Date: 01/28/2021 File Name: 20075D01272021DFA 44e7cbc468d5b63e-1611775858559 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Headwaters Project Name: Teton River Flats Instrument ID 3491 Daily Standardization: Client: Headwaters Construction Date: 01/27/2021 MS: 742 DS: 2643 Time Start: 12:00 PM Time End: 05:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Northeast corner of building 3' below finish grade 6 140.2 133.4 5.1 141.1 Material Type Pit Run 94.54 2 Northwest corner of building 3' below finish grade 6 139.8 133.6 4.7 141.1 Material Type Pit Run 94.68 3 Center of building 3' below finish grade 6 144.3 137.4 5.0 141.1 Material Type Pit Run 97.38 Remarks: The contractor was not ready at 12 when I arrived. I waited for them to compact the first lift. After the first lift passed, I waited for them to compact the second. The second lift didn't pass due to frozen soil. The contractor placed a heating element for it to unthaw overnight. Tested By: D. Aust Signature: Date: 01/27/2021 Reviewed By: Tyson Falls Signature: Date: 01/28/2021 File Name: 20075D02082021CRC 7ca1bb41ba298523-1612796987405 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson paving and excavation Project Name: Teton River Flats Instrument ID 76561 Daily Standardization: Client: Headwaters Date: 02/08/2021 MS: 789 DS: 2801 Time Start: 08:15 AM Time End: 10:15 AM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Subbase for concrete sidewalk slab: in- between buildings A-1 and A-3. Approximately St 00+30 Top of subbase, on grade for concrete placement 4 135.4 130.6 3.7 136.0 Material Type 3/4" Base 96.03 2 Subbase for concrete sidewalk slab: in- between buildings A-1 and A-3. Approximately St 00+30 Top of subbase, on grade for concrete placement 4 134.9 130.4 3.5 136.0 Material Type 3/4" Base 95.88 Remarks: Tested By: C.Carlson Signature: Date: 02/08/2021 Reviewed By: S.Thompson Signature: Date: 02/11/2021 File Name: 20075D02232021NS E506018D-F53A-49BD-8D19-03E3356355E7 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson excavation Project Name: Teton River Flats Instrument ID 78652 Daily Standardization: Client: Headwater's Construction Date: 02/23/2021 MS: 688 DS: 2463 Time Start: 08:15 AM Time End: 09:15 AM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Breezeway between eastern buildings Top of 3/4 BS 140.9 133.1 5.8 136.0 Material Type Native Soil 97.87 Remarks: Tested By: N.Steiner Signature: Date: 02/23/2021 Reviewed By: S.Thompson Signature: Date: 02/23/2021 File Name: 20075 7ca1bb41ba298523-1612991137421 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson Project Name: Teton River Flats Instrument ID 76561 Daily Standardization: Client: Headwater's Construction Date: 02/10/2021 MS: 2802 DS: 786 Time Start: 01:45 PM Time End: 03:45 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 NE corner of building A-5 Top of subbase, on grade for concrete placement 6 137.1 132.0 3.9 136.0 Material Type 3/4" Base 97.06 2 SW corner of building A-5 Top on subbase, on grade for concrete placement 6 134.1 129.3 3.8 136.0 Material Type 3/4" Base 95.07 3 NW corner of building A-5 Top on subbase, on grade for concrete placement 6 138.6 133.7 3.7 136.0 Material Type 3/4" Base 98.31 4 SE corner of building A-5 Top of subbase, on grade for concrete placement 6 138.5 132.4 4.7 136.0 Material Type 3/4" Base 97.35 Remarks: Tested By: C.Carlson Signature: Date: Reviewed By: S.Thompson Signature: Date: File Name: 20075 7ca1bb41ba298523-1612991137421 2 02/10/2021 02/11/2021 File Name: 20075D03222021BB 0F8EE0DE-61FD-41EF-99E4-D814B9C6CB7D 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson Project Name: Teton River Flats Instrument ID 76562 Daily Standardization: Client: Headwater's Construction Date: 03/22/2021 MS: 683 DS: 2905 Time Start: 12:00 PM Time End: 03:30 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Interior of building A4 approximately 15’ South and 40’ West from Northeast corner of building Approximately 2’ below finish floor 12 145.5 137.3 5.9 141.1 Material Type Pit Run 97.31 2 Interior of building A4 approximately 30’ South and 12’ West fro the Northeast corner of building Approximately 2’ below finish floor 12 149.5 141.6 5.6 141.1 Material Type Pit Run 100.35 Remarks: Rain snow mix was falling Tested By: Ben E. Ball Signature: Date: 03/22/2021 Reviewed By: S.Thompson Signature: Date: 03/23/2021 File Name: 20075D03102021NS C6DC6BE9-55FC-40D0-82F6-A13195687C92 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson excavation Project Name: Teton River Flats Instrument ID 76561 Daily Standardization: Client: Headwater's Construction Date: 03/10/2021 MS: 775 DS: 2794 Time Start: 01:45 PM Time End: 03:15 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Northwest corner of building B2 Sub grade footer 6 141.6 137.4 3.0 141.1 Material Type Pit Run 97.38 2 Southeast corner of building B2 Sub grade footer 6 143.8 135.0 6.6 141.1 Material Type Pit Run 95.68 3 North east corner of building B2 Sub grade footer 6 138.7 134.5 3.1 141.1 Material Type Pit Run 95.32 4 Southwest corner of building B2 Sub grade footer 6 142.4 138.5 2.8 141.1 Material Type Pit Run 98.16 Remarks: Tested By: N. Steiner Signature: Date: 03/10/2021 Reviewed By: S.Thompson Signature: Date: 03/12/2021 File Name: 20075D032321NS 2F49D762-4CF1-4F60-B504-55BB642EDA73 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson excavation Project Name: Teton River Flats Instrument ID 78652 Daily Standardization: Client: Headwater's Construction Date: 03/23/2021 MS: 695 DS: 2453 Time Start: 11:30 AM Time End: 01:30 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 North west corner of building B2 1 foot below top of footing 6 142.9 137.4 4.0 141.1 Material Type Pit Run 97.38 2 Middle of building pad I foot below top of footings 6 142.8 135.4 5.5 141.1 Material Type Pit Run 95.96 3 South east corner of building 1 foot below footings 6 144.3 137.7 4.9 141.1 Material Type Pit Run 97.59 Remarks: Tested By: N. Steiner Signature: Date: 03/23/2021 Reviewed By: S.Thompson Signature: Date: 03/23/2021 File Name: 20075D03162021DFA e875ea11521d0ef1-1615928842307 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Thompson Excavation Project Name: Teton River Flats Instrument ID 76561 Daily Standardization: Client: Headwater's Construction Date: 03/16/2021 MS: 755 DS: 2835 Time Start: 02:30 PM Time End: 04:30 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Building B3 Bottom of footing 6 139.0 134.3 3.6 141.1 Material Type Pit Run 95.18 2 Building B3 southwest corner Bottom of footing 6 145.2 138.3 5.0 141.1 Material Type Pit Run 98.02 3 Building B3 west side Bottom of footing 6 141.5 135.3 4.6 141.1 Material Type Pit Run 95.89 4 Building B3, Northeast corner of building Bottom of footing 6 150.3 143.8 4.5 141.1 Material Type Pit Run 101.91 Remarks: Tested By: D. Aust Signature: Date: 03/16/2021 Reviewed By: S.Thompson Signature: Date: 03/17/2021 File Name: 20075D03152021 DECB7FF3-E9A9-4FAC-826C-4A9C73367633 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 20075 Contractor: Headwaters Project Name: Teton River Flats Instrument ID 00443 Daily Standardization: Client: Headwater's Construction Date: 03/15/2021 MS: 783 DS: 2842 Time Start: 12:30 PM Time End: 03:15 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 South side of the building 0 2 141.1 136.4 4.7 141.1 Material Type Pit Run 96.67 3 South side of the 0 4 142.3 136.0 6.2 141.1 Material Type Pit Run 96.39 4 South side of the 0 4 146.0 139.0 5.1 141.1 Material Type Pit Run 98.51 Remarks: Tested By: T Paules Signature: Date: 03/15/2021 Reviewed By: S.Thompson Signature: Date: 03/16/2021