Loading...
HomeMy WebLinkAboutPLANS REVISED APPROVED - 21-00108 - Idaho Ballroom Academy Dance Studio - RemodelAuthor Name Author Email Author Phone No.: Alan Parkinson Alan.Parkinson@rexburg.org 208-372-2165 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : Idaho Ballroom Academy Dance Studio - RemodelAddress : 155 E 2nd NRecord Type : Commercial - RemodelDocument Filename : 0303_IBArevised2.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 21-00108 Page Reference AnnotationType Author : Department Status Page Review Comments Applicant Response Comments Pg 1 Stamp Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 Type of construction VB Pg 1 Free text Cody Jones : Building Open 1 Fire wall to comply with Section 706 Penetrations to comply with Section 714 Pg 1 Free text Cody Jones : Building Open 1 Any concealed areas to be in compliance with Section 718 Pg 1 Rectangle Cody Jones : Building Open 1 Pg 1 Rectangle Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 All doors to meet the requirements of Section 1010 Door panic hardware shall be installed as per Section1010.1.10 Pg 1 Free text Cody Jones : Building Open 1 Bathrooms to have exhaust fans Pg 1 Line Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 Building needing Flood Elevation Certificate upon final. Commercial - Remodel Approval of plans does not constitute approval of variance from code Page Reference AnnotationType Author : Department Status Page Review Comments Applicant Response Comments Pg 1 Free text Cody Jones : Building Open 1 Exit lighting and Exit signs To comply with Section 1008 and1013 Pg 1 Line Cody Jones : Building Open 1 Pg 1 Line Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 All construction and materials to be in compliance with IBC2018 Pg 1 Free text Cody Jones : Building Open 1 Occupant load sign to be posted. Pg 1 Ellipse Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 One bathroom in each unit to be accessible. Pg 1 Line Cody Jones : Building Open 1 Pg 1 Free text Cody Jones : Building Open 1 Need to have plans designed and stamped by registereddesign professional. (Occupant classification, egress, exitsect....) Pg 2 Stamp Alan Parkinson : P&Z Open 2 Approved - Planning and Zoning Approval of plans does not constitute approval of variance from code OFFICE 10'1" X 11'5" BALLET #2 37'4" X 37'5 BALLET #1 38'10" X 43'8" BREAK ROOM 20'4" X 12'6" MINI BALLET 19'8" X 37'1" STORAGE 20'4" X 8'1" LOBBY MECH. BALLROOM #1 38'0" X 50'0" DANCE #2 49'0" X 40'0" COSTUME D.F. D.F. D.F. STACK W/D REF Suite #100: Business (150 gross load factor) 840 SF storage/office= 5.6 persons 4677 SF studios spaces = 31.2 persons 160 SF accessory storage = .5 persons Occupancy per IBC 2018 Suite #200: Business (150 gross load factor) 4800 SF studios spaces = 32 persons 1250 SF accessory storage/300 = 4 persons Egress width required= .2"x 57 = 11.4" Egress width required= .2"x 52 = 10.4"Total occupancy load: 37.3 persons Total occupancy load: 36 persons Egress width provided= .2"x 57 = 144" Egress width provided= .2"x 52 = 144" max. exit access travel distance= 75' unsprinklered max travel distance: 73'-0" max. exit access travel distance= 75' unsprinklered max travel distance: 73'-0" 2022 02/09/21 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 15 5 E . S e c o n d N . Re x b u r g I d a h o Fi s h e r D a n c e S t u d i o s DATE: PROJECT: REVISION DATES: T E N A N T B U I L D O U T LI F E S A F E T Y A-0 03/03/21 Type of construction VB Fire wall to comply with Section 706 Penetrations to comply with Section 714 Any concealed areas to be in compliance with Section 718All doors to meet the requirements of Section 1010 Door panic hardware shall be installed as per Section 1010.1.10 Bathrooms to have exhaust fans Building needing Flood Elevation Certificate upon final. Exit lighting and Exit signs To comply with Section 1008 and 1013 All construction and materials to be in compliance with IBC 2018 Occupant load sign to be posted. One bathroom in each unit to be accessible. Need to have plans designed and stamped by registered design professional. (Occupant classification, egress, exits ect....) School designation required: (2) spaces per elem. & jr. high classroom required (4) spaces per max persons 30 spaces 2n d N o r t h Cell Tower BALLET SUITE #100 BALLROOM SUITE #200 Parking spaces required: Parking per City of Rexburg Development Code 3.04.030 Suite 100 (1) elem. & jr. classes = (2) spaces (2) high school class max 20 = (10) spaces METAL BLDG. ADDITION FUTURE 10% REQ. FOR GREEN SPACE & SNOW REMOVAL Suite 200 (1) elem. & jr. class = (2) spaces (1) high school class max 32 = (8) spaces (1) future high school class max 32 = (8) spaces Parking spaces required: 41 spaces H/C Parking space (2) space Parking spaces provided: 2022 02/09/21 DR A W I N G S A R E F O R M A T T E D T O P R I N T T O S C A L E O N 2 4 " X 3 6 " . T H E S E P L A N S W E R E D R A F T E D B Y V R D E S I G N . P L E A S E C O N T A C T ( 2 0 8 ) 2 0 6 - 9 6 8 1 F O R D E S I G N S E R V I C E S . G E N E R A L C O N T R A C T O R I S R E S P O N S I B L E T O V E R I F Y D E S I G N I S E N G I N E E R E D I F R E Q U I R E D A N D I S C O N S T R U C T E D T O C U R R E N T C O D E R E Q U I R E M E N T S . 15 5 E . S e c o n d N . Re x b u r g I d a h o Fi s h e r D a n c e S t u d i o s DATE: PROJECT: REVISION DATES: T E N A N T B U I L D O U T SI T E L A Y O U T A-1 Dance Studio Renovation 03/03/21