Loading...
HomeMy WebLinkAboutPLANS REDLINED REVISIONS - 21-00378 - Taco Bell - AdditionAuthor Name Author Email Author Phone No.: Bret Stoddard brets@rexburg.org 208-372-2171 Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Don Allen Don.Allen@rexburg.org 208-372-2174 Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : Taco Bell - AdditionAddress : 22 W Main StApplication Type : Document Filename : 2031_Rexburg Taco Bell Full Set.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference AnnotationType Author : Department Status Page Review Comments Applicant Response Comments A1.0 Free text Cody Jones : Building Open 5 COMM check required/insulation r values. A1.2 Free text Cody Jones : Building Open 6 Suspended ceiling to be installed to manufacturersspecifications. A5.0 Free text Cody Jones : Building Open 12 Panic hardware to be installed on Egress doors. A5.0 Free text Cody Jones : Building Open 12 Seating at tables, counters and work areas comply with IBCsection 1109.11. A5.1 Free text Cody Jones : Building Open 13 Glass and Glazing to meet requirements of IBC 24. SO.1 Free text Cody Jones : Building Open 14 wind speed= 90mph SO.3 Free text Cody Jones : Building Open 16 Special Inspector needs to be identified. S6.01 Free text Cody Jones : Building Open 21 Footings to be at frost depth of 36". # 21-00378Commercial - Addition Report Date: 06.07.2021 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference AnnotationType Author : Department Status Page Review Comments Applicant Response Comments A0.0 Free text Kyle Baldwin : P&Z Open 1 Rexburg Development code 3.04.030.C states: C. BUSINESS & SERVICES (per other measurement) Fast food with drive-through 0.33 spaces per seat (two (2) feet of bench equals one(1) seat) According to our calculations 25 parking stalls are needed (76X .33) Report Date: 06.07.2021 Approval of plans does not constitute approval of variance from code Page 2 of 2 ARCHITECT: C O D E C O M P L I A N C E N O T E S S H E E T # D E S C R I P T I O N D R A W I N G I N D E X A R C H I T E C T U R A L 10459 SOUTH 1300 WEST STE 201SOUTH JORDAN, UT 84095801.487.3330MECHANICAL:ELECTRICAL:JTB HVAC & PLUMBI N G 10459 SOUTH 1300 WEST SOUTH JORDAN, UT 84095801.849.8590ROCKY MOUNTAIN ENGI N E E R S 2117 SOUTH 3600 WESTSALT LAKE CITY, UT. 84119801.566.0503 F I R E C O D E C O M P L I A N C E N O T E S 1 . U n d e r g r o u n d f i r e s u p p l y o r f i r e h y d r a n t i n s t a l l a t i o n s a n d m o d i f i c a t i o n s r e q u i r e a s e p a r a t e s u b m i t t a l t o t h i s o f f i c e . 2 . P r o v i d e a n a d d r e s s o n t h e b u i l d i n g w h i c h i s a s s i g n e d b y t h e C i t y E n g i n e e r i n g D e p a r t m e n t . I f t h e s p a c e i s s u b d i v i d e d t h e n t h e u n i t n u m b e r o r l e t t e r s h a l l b e p l a c e d o n o r n e a r t h e e n t r a n c e o f e a c h u n i t . T h e s e n u m b e r s a n d l e t t e r s s h a l l b e v i s i b l e f r o m t h e s t r e e t a n d b e a m i n i m u m 6 i n c h e s h i g h w i t h a s t r o k e o f ½ i n c h . T h e n u m b e r s a n d l e t t e r s s h a l l b e A r a b i c a n d s h a l l s h a r p l y c o n t r a s t w i t h t h e b a c k g r o u n d . 3 . F i r e d e p a r t m e n t a c c e s s r o a d s a n d f i r e h y d r a n t s s h a l l b e i n s t a l l e d p r i o r t o c o n s t r u c t i o n o f t h e f o o t i n g s a n d f o u n d a t i o n s o f a n y s t r u c t u r e . F i r e h y d r a n t s s h a l l b e a c c e s s i b l e , o p e r a t i o n a l a n d m a i n t a i n e d i n t h a t c a p a c i t y . 4 . A 3 f o o t c l e a r a n c e s h a l l b e m a i n t a i n e d a t a l l t i m e s a r o u n d f i r e e q u i p m e n t t o i n c l u d e b u t n o t l i m i t e d t o h y d r a n t s , f i r e d e p a r t m e n t c o n n e c t i o n s a n d f i r e s u p p r e s s i o n c o n t r o l v a l v e s . 5 . W a t e r l a t e r a l s w h i c h a r e 1 6 f o o t i n l e n g t h o r l o n g e r s h a l l b e p r o v i d e d w i t h c o n t r o l v a l v e s a t t h e t a p o f t h e w a t e r m a i n a n d a t t h e f i r e h y d r a n t . 6 . H i g h p i l e s t o r a g e b u i l d i n g s s h a l l b e p r o v i d e d w i t h w e t s t a n d p i p e s h a v i n g 1 ½ i n c h m a l e N a t i o n a l S t a n d a r d T h r e a d s a n d c a p l o c a t e d a t t h e f i r e d e p a r t m e n t a c c e s s d o o r s l o c a t e d n o m o r e t h a n 1 0 0 l i n e a l f e e t a p a r t a l o n g t h e e x t e r i o r w a l l s e r v i n g t h e s t o r a g e a r e a . T h i s o u t l e t s h a l l b e l o c a t e d o n t h e l o c k s e t s i d e o f t h e d o o r w i t h i n 3 f e e t o f t h e d o o r o p e n i n g . 7 . S t a n d p i p e s f o r h i g h p i l e s t o r a g e s h a l l h a v e i t s f e e d f r o m e i t h e r t h e a d j a c e n t f i r e s p r i n k l e r s y s t e m o r a s e p a r a t e r i s e r w h i c h i s p r o v i d e d w i t h b a c k f l o w p r o t e c t i o n 8 . F i r e s t o p p i n g m a t e r i a l s f o r n o n - f e r r o u s p i p e , c o n d u i t a n d o t h e r s y n t h e t i c m a t e r i a l s s h a l l b e c o m p a t i b l e w i t h e a c h o t h e r . 9 . A l l f i r e r a t e d a s s e m b l i e s s h a l l b e t e s t e d i n a c c o r d a n c e w i t h A S T M E 1 1 9 . 1 0 . A l l o c c u p a n c i e s t h a t s t o r e , d i s p e n s e o r h a n d l e h a z a r d o u s m a t e r i a l s s h a l l h a v e o n o r p l a c e d a d j a c e n t t o t h e d o o r s l a b e l s w h i c h a r e l i s t e d i n N a t i o n a l F i r e P r o t e c t i o n A s s o c i a t i o n S t a n d a r d 7 0 4 d e p i c t i n g t h e h a z a r d s c o n t a i n e d w i t h i n . 1 1 . P r o v i d e a s u p r a b o x w h i c h m a y b e p u r c h a s e d f r o m S a n d y C i t y F i r e P r e v e n t i o n B u r e a u a n d i n s t a l l t h e b o x a d j a c e n t t o t h e m a i n d o o r . 2 0 1 8 I F C R E Q U I R E M E N T S TACO BELL ADDITION/ R E M O D E L 22 WEST MAIN ST R E E T REXBURG, IDAH O 8 3 4 4 0 M E C H A N I C A L P L U M B I N G E L E C T R I C A L SITE STRUCTURAL:BHB ENGINEERING2766 SOUTH MAIN STREET SALT LAKE CITY, UTAH801.355.5656 S T R U C T U R A L R e x b u r g D e v e l o p m e n t c o d e 3 . 0 4 . 0 3 0 . C s t a t e s : C . B U S I N E S S & S E R V I C E S ( p e r o t h e r m e a s u r e m e n t ) F a s t f o o d w i t h d r i v e - t h r o u g h 0 . 3 3 s p a c e s p e r s e a t ( t w o ( 2 ) f e e t o f b e n c h e q u a l s o n e ( 1 ) s e a t ) A c c o r d i n g t o o u r c a l c u l a t i o n s 2 5 p a r k i n g s t a l l s a r e n e e d e d ( 7 6 X . 3 3 ) N O T E S : G E N E R A L N O T E S A COMM check required/insulation r values. F L O O R F I N I S H P L A N R E F L E C T E D C E I L I N G P L A N G E N E R A L N O T E S A K E Y N O T E S B R E F L E C T E D C E I L I N G P L A N C E I L I N G L E G E N D D F I N I S H L E G E N D C S E E S H E E T A 7 . 1 F O R L I G H T I N G F I X T U R E S S C H E D U L E S u s p e n d e d c e i l i n g t o b e i n s t a l l e d t o m a n u f a c t u r e r s s p e c i f i c a t i o n s . KEYNOTES P a n i c h a r d w a r e t o b e i n s t a l l e d o n E g r e s s d o o r s . S e a t i n g a t t a b l e s , c o u n t e r s a n d w o r k a r e a s c o m p l y w i t h I B C s e c t i o n 1 1 0 9 . 1 1 . G E N E R A L N O T E S A A B C D I N S T A L L W A L L T I L E O N A L L S I D E S O F B E V E R A G E A L C O V E . D I N I N G 1 C H A I R R A I L . P R O V I D E C L E A R S I L I C O N E C A U L K W H E R E A L L F I X E D A N D B U I L T - I N C O U N T E R S / E Q U I P M E N T A B U T W A L L S U R F A C E S . W H E R E G A P B E T W E E N W A L L A N D C O U N T E R S P L A S H / E Q U I P M E N T E X C E E D S 1 / 4 " , P R O V I D E S . S . C L O S U R E A N G L E . D R O P P E N D A N T L I G H T F I X T U R E . C C T V C A M E R A / M O N I T O R . N E W D I G I T A L M E N U B O A R D S . 1 / 2 P L Y W O O D B A C K I N G ( 1 5 0 " X 1 8 " ) T O B E I N S T A L L E D B E H I N D T H E D R Y W A L L / F I N I S H E D W A L L S U R F A C E . 2 " X 2 " S S C O R N E R / E N D W A L L C H A N N E L G U A R D , F U L L H E I G H T . S T A I N L E S S W R A P T O F I N I S H O F F U N D E R S I D E O F B U L K H E A D . N E W F I N I S H E S O N P O S / S E R V I N G C O U N T E R . R E S U R F A C E O R R E P L A C E C O U N T E R T O P A S R E Q U I R E D . R E I N S T A L L E X I S T I N G P E P S I D R I N K M A C H I N E , I C E M A C H I N E , T E A U R N S , A N D D R I N K T A B L E . N E W A R T W O R K L O C A T I O N . D E C O R A T I V E M E T A L B L A C K T R I M A T E X P O S E D E D G E S A N D O U T S I D E C O R N E R S O F P O S C O U N T E R . A C C E S S I B L E S I G N A G E . V E R I F Y L O C A L R E Q U I R E M E N T S . P R O V I D E T A C T I L E E X I T S I G N A T E G R E S S D O O R P E R " T A C T I L E S I G N " D E T A I L O N A D A . 1 W H E N E X I S T I N G I S N O T R E Q U I R E D . I N S T A L L " A S K I F Y O U N E E D A S S I S T A N C E S I G N " . K E Y N O T E S B OPEN TOKITCHENBEYOND B A C K R O O M D O O R B E Y O N D G l a s s a n d G l a z i n g t o m e e t r e q u i r e m e n t s o f I B C 2 4 . STRUCTURALBHB PROJECT NUMBER REVISIONS SHEET TITLE PROJECT/OWNER ENGINEER DATE SHEET NUMBER NI C H O L S • N A Y L O R A R C H I T E C T S 10 4 5 9 S . 1 3 0 0 W E S T S U I T E 2 0 1 SO U T H J O R D A N , U T A H 8 4 0 9 5 • ( 8 0 1 ) 4 8 7 - 3 3 3 0 1/ 1 6 " 3 / 3 2 " 1/ 8 " 3 / 1 6 " 1 / 4 " 3 / 8 " 1/ 2 " 3/ 4 " 1 1 / 2 " 3" 2766 South Main Street Salt Lake City, Utah 84115 801-355-5656 bhb@bhbengineers.com S0.1 210436 GE N E R A L ST R U C T U R A L N O T E S 22 W M A I N S T R E E T RE X B U R G , I D 8 3 4 4 0 TA C O B E L L A D D I T I O N RE X B U R G . I D 5.17.2021 GENERAL STRUCTURAL NOTES NO. DATE 5.17.2021 wind speed= 90mph STRUCTURALBHB PROJECT NUMBER REVISIONS SHEET TITLE PROJECT/OWNER ENGINEER DATE SHEET NUMBER NI C H O L S • N A Y L O R A R C H I T E C T S 10 4 5 9 S . 1 3 0 0 W E S T S U I T E 2 0 1 SO U T H J O R D A N , U T A H 8 4 0 9 5 • ( 8 0 1 ) 4 8 7 - 3 3 3 0 1/ 1 6 " 3 / 3 2 " 1 / 8 " 3 / 1 6 " 1 / 4 " 3 / 8 " 1/ 2 " 3/ 4 " 1 1 / 2 " 3" 2766 South Main Street Salt Lake City, Utah 84115 801-355-5656 bhb@bhbengineers.com S0.3 210436 SP E C I A L I N S P E C T I O N NO T E S 22 W M A I N S T R E E T RE X B U R G , I D 8 3 4 4 0 TA C O B E L L A D D I T I O N RE X B U R G . I D 5.17.2021 REQUIREMENTS FOR SPECIAL INSPECTION, MATERIAL TESTING, AND STRUCTURAL OBSERVATION NO. DATE 5.17.2021 Special Inspector needs to be identified. SCHED_CONC_FTG-C2500-S2000 1 CONCRETE FOOTING SCHEDULE CONCRETE FOOTING SCHEDULE NO SCALE WIDTHMARK LENGTH DEPTH No. SIZE LENGTH SPACING REINFORCING CROSSWISE COMMENTSREINFORCING LENGTHWISE No. SIZE LENGTH SPACING CONCRETE FOOTING NOTES: 1. PLACE ALL FOOTING REINFORCING IN THE BOTTOM OF THE FOOTING WITH 3" CLEAR CONCRETE COVER (UNO). 2. TOP REINFORCING, WHERE OCCURS, SHALL BE PLACED IN THE TOP OF THE FOOTING WITH 2" MINIMUM CONCRETE COVER. 3. IF FOOTINGS ARE EARTH-FORMED, FOOTINGS SHALL BE 6" LONGER AND WIDER THAN SCHEDULED. 4. RUN CONTINUOUS FOOTING REINFORCEMENT THROUGH SPOT FOOTINGS. 5. SEE GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS. 6. SOME SCHEDULED FOOTINGS MAY NOT BE USED, SEE FOOTING AND FOUNDATION PLAN FOR FOOTING MARKS. FC2.0 2'-0" CONT 12" - #4 1'-6" 48" 3 #4 CONT EQ SCHED_CONC_WALL-01 CONCRETE WALL SCHEDULE 2 CONCRETE WALL SCHEDULE WALLS NOT DESIGNATED IN PLAN . COMMENTSTOP AND BOTTOM WALL TYPEHORIZONTAL REINFORCINGMARK THICKNESS VERTICAL CW-8A 8" #4 AT 18" O.C. #4 AT 12" O.C. (1) #4 A TYPE 'D' VERTICAL TYPE 'C' REINFORCING REINFORCING HORIZONTAL NO SCALE TYPE 'B' VERTICAL REINFORCING HORIZONTAL LC TYPE 'A' REINFORCING WALL REINFORCING PLACEMENT TYPES: ABBREVIATIONS: E.F. I.F. O.F. EACH FACE INSIDE FACE OUTSIDE FACE IN S I D E FA C E CONCRETE FOUNDATION WALL NOTES: 1. SEE GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS. REINFORCINGTHICKNESSVERTICAL HORIZONTAL 6" #4 AT 18" O.C. #4 AT 16" O.C. 8" #4 AT 18" O.C. #4 AT 12" O.C. 10" #4 AT 16" O.C. #5 AT 15" O.C. 12" #4 AT 18" O.C. E.F. #4 AT 16" O.C. E.F. SCHED_CONC_PIER-01 3 CONCRETE PIER SCHEDULE CONCRETE PIER SCHEDULE 'W T ' NO SCALE PIER SIZEMARK COMMENTSTYPETIESVERTICAL REINFORCING .CP-16A 'WT' x 16" (4) #5 BARS #3 AT 8" O.C. A TYPE "A" CONCRETE PIER NOTES: 1. INSTALL (3) SETS OF TIES WITHIN TOP 5" OF ALL PIERS (UNO). 2. RUN HORIZONTAL CONCRETE WALL REINFORCING CONTINUOUS THROUGH PIER WHEN PIER IS POURED MONOLITHICALLY WITH CONCRETE WALL. 3. SEE GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS. SCHED_CONC_REINF-02 4 CONCRETE REINFORCING BAR LAP SPLICE SCHEDULE CONCRETE REINFORCING BAR LAP SPLICE SCHEDULE REQUIREMENT FOR CASE 1 LAP LENGTHS NO SCALE BAR SIZE f'c = 3000psi & f'c = 3500 psi f'c = 4000psi & f'c = 4500 psi f'c = 5000psi f'c = 6000psi REGULAR TOP CLASS BABA CLASS REGULAR TOP CLASS BABA CLASS REGULAR TOP CLASS BABA CLASS REGULAR TOP CLASS BABA CLASS #3 17" 22" 22" 28" 15" 19" 19" 24" 13" 17" 17" 22" 12" 16" 15" 20" #4 22" 29" 29" 37" 19" 25" 25" 32" 17" 22" 22" 29" 16" 20" 20" 27" #5 28" 36" 36" 47" 24" 31" 31" 40" 22" 28" 28" 36" 20" 26" 26" 33" #6 33" 43" 43" 56" 29" 37" 37" 48" 26" 33" 33" 43" 24" 31" 31" 40" #7 48" 63" 63" 81" 42" 54" 54" 70" 37" 49" 49" 63" 34" 44" 44" 58" #8 #9 #10 #11 55" 72" 72" 93" 48" 62" 62" 80" 43" 56" 55" 72" 39" 51" 51" 66" 62" 81" 81" 105" 54" 70" 70" 91" 48" 63" 63" 81" 44" 57" 57" 74" 70" 91" 91" 118" 61" 79" 79" 102" 54" 70" 70" 91" 50" 64" 64" 83" 78" 101" 101" 131" 67" 87" 87" 113" 60" 78" 78" 101" 55" 71" 71" 93" TABULATED VALUES ARE FOR CASE 1 REINFORCEMENT, WHERE THE REQUIREMENTS OF TABLE BELOW ARE MET. WHERE THESE CONDITIONS ARE NOT MET, MULTIPLY THE LAP LENGTHS (Ꝭd) BY 1.5. BAR CLEAR SPACING CLEAR COVER STIRRUPS OR TIES NO REQUIREMENT db = BAR DIAMETER >=db >=db >=db>=2db >=CODE FOR MINIMUM THROUGHOUT Ꝭd CONCRETE REINFORCING BAR LAP SPLICE NOTES: 1. THIS SCHEDULE SHALL BE USED FOR ALL BAR SPLICES IN CONCRETE WALLS, UNLESS NOTED OTHERWISE. 2. CLASS 'A' SPLICES MAY BE USED ONLY IN CASES WHERE 50% OR LESS OF THE BARS ARE SPLICED WITHIN THE LAP SPLICE LENGTH. 3. CLASS 'B' SPLICES SHALL BE USED FOR ALL SPLICES UNLESS THE REQUIREMENTS OF NOTE No. 2 ABOVE ARE MET. 4. TIES AND STIRRUPS SHALL NOT BE SPLICED. 5. DO NOT SPLICE VERTICAL BARS IN RETAINING WALLS UNLESS SPECIFICALLY SHOWN. 6. THE VALUES TABULATED IN SCHEDULE ARE FOR GRADE 60 REINFORCING BARS. FOR GRADE 75, MULTIPLY LAP LENGTHS BY 1.25 AND FOR GRADE 80, MULTIPLY BY 1.33. 7. THE VALUES TABULATED IN SCHEDULE ARE MINIMUM REQUIREMENTS. LONGER LENGTHS MAY BE USED FOR CONSTRUCTIBILITY. 8. TOP BARS ARE CLASSIFIED AS HORIZONTAL BARS WHERE 12", OR MORE, OF FRESH CONCRETE IS CAST BELOW THE REINFORCING BAR. 9. FOR EPOXY-COATED OR ZINC AND EPOXY DUAL-COATED BARS WITH CLEAR COVER < 3d b OR CLEAR SPACING <6db, MULTIPLY LAP LENGTHS BY 1.5. FOR ALL OTHER CASES MULTIPLY BY 1.2 10. FOR LIGHT WEIGHT CONCRETE, MULTIPLY LAP LENGTHS BY 1.33 UNLESS THE AVERAGE SPLITTING TENSILE STRENGTH (F ct) IS SPECIFIED. FOR LIGHT WEIGHT CONCRETE WHERE F ct IS SPECIFIED, REFER TO ACI318-14 SECTION 19.2.4.3 11. SPLICES FOR BUNDLED BARS: a. FOR BUNDLED BARS OF THREE OR LESS, LAP SPLICE LENGTHS SHALL BE MULTIPLIED BY 1.2. b. FOR BUNDLED BARS OF FOUR OR MORE, LAP SPLICE LENGTHS SHALL BE MULTIPLIED BY 1.33. c. INDIVIDUAL BAR SPLICES WITHIN A BUNDLE SHALL NOT OVERLAP. d. ENTIRE BUNDLES SHALL NOT BE LAP SPLICED. 12. SEE GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS. SCHED_CONC_EPOXY-01 5 STANDARD ADHESIVE EMBEDMENT SCHEDULE STANDARD ADHESIVE EMBEDMENT SCHEDULE MINIMUM EMBED NO SCALE 5.5/8" 6.3/4" 4.1/2" 3.3/8" CONCRETE OR GROUTED MASONRY MINIMUM EMBEDMENT INTO #4 (1/2") #3 (3/8") #6 (3/4") #5 (5/8") NOTES SECTION OF GENERAL STRUCTURAL PER "POST INSTALLED ANCHORS" USE "STANDARD ADHESIVE" ROD, SEE DETAILS REBAR DOWEL/THREADED (THREADED ROD SIZE) REBAR DOWEL STANDARD ADHESIVE EMBEDMENT NOTES: 1. SPECIFIC EMBEDMENTS, NOTES AND DETAILS IN DRAWINGS SHALL GOVERN OVER THIS SCHEDULE. 2. HOLE DIAMETER SHALL BE DOWEL/ROD DIAMETER PLUS 1/8". FOLLOW MANUFACTURER'S INSTRUCTIONS FOR HOLE PREPARATION. 3. PROVIDE A 3" MINIMUM EDGE DISTANCE TO CENTER OF HOLE. 4. CONTACT STRUCTURAL ENGINEER IF MINIMUM EMBEDMENTS INDICATED ABOVE ARE NOT ACHIEVABLE. 5. SEE "POST INSTALLED ANCHORS" SECTION OF GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS. STRUCTURALBHB PROJECT NUMBER REVISIONS SHEET TITLE PROJECT/OWNER ENGINEER DATE SHEET NUMBER NI C H O L S • N A Y L O R A R C H I T E C T S 10 4 5 9 S . 1 3 0 0 W E S T S U I T E 2 0 1 SO U T H J O R D A N , U T A H 8 4 0 9 5 • ( 8 0 1 ) 4 8 7 - 3 3 3 0 1/ 1 6 " 3 / 3 2 " 1 / 8 " 3 / 1 6 " 1 / 4 " 3 / 8 " 1/ 2 " 3/ 4 " 1 1 / 2 " 3" 2766 South Main Street Salt Lake City, Utah 84115 801-355-5656 bhb@bhbengineers.com S6.01 210436 SC H E D U L E S 22 W M A I N S T R E E T RE X B U R G , I D 8 3 4 4 0 TA C O B E L L A D D I T I O N RE X B U R G . I D 5.17.2021 NO. DATE 5.17.2021 Footings to be at frost depth of 36". ELECTRICAL SHEET INDEX E000 ELECTRICAL GENERAL SHEET E101 LIGHTING PLAN E201 POWER PLAN E601 ELECTRICAL SCHEDULES EL E C T R I C A L GE N E R A L S H E E T ELECTRICAL SYMBOL SCHEDULE SYMBOL DESCRIPTION MOUNTING NOTES FIRE ALARM HORN 7' - 6" FIRE ALARM STROBE 7' - 6" FIRE ALARM HORN STROBE 7' - 6" FIRE ALARM GONG 7' - 6" FIRE ALARM DUAL ACTION MANUAL PULL STATION 4' - 0" FIRE ALARM ADDRESSABLE CONTROL RELAY FIRE ALARM MONITOR MODULE FIRE ALARM CONTROL PANEL 6' - 6" TO TOP FIRE ALARM ANNUNCIATOR PANEL 4' - 0" PHOTOELECTRIC SMOKE DETECTOR RATE OF RISE/HEAT DETECTOR CARBON MONOXIDE DETECTOR DUCT SMOKE DETECTOR 6 FIRE SMOKE DAMPER FIRE RISER TAMPER SWITCH FIRE RISER FLOW SWITCH ELECTROMAGNETIC DOOR HOLDER 2' - 0" CO AR F MM F T SURFACE SURFACE SURFACE DUCT SECURITY CARD READER SECURITY KEYPAD SECURITY CCTV CAMERA CR KP 4' - 0" 4' - 0" ELECTRIC STRIKEES SPEAKER - WALL MICROPHONE CONNECTION VOLUME CONTROL SWITCH S S SVC M SPEAKER - CEILING 4' - 0" LIGHT FIXTURE - SURFACE OR RECESSED SEE DRAWINGS 1 EMERGENCY LIGHT FIXTURE - SURFACE OR RECESSED SEE DRAWINGS 1, 2 EMERGENCY LIGHT FIXTURE - OPEN STRIP LIGHT FIXTURE - CEILING MOUNTED CEILING 1 LIGHT FIXTURE - PENDANT/CHANDELIER CEILING 1 LIGHT FIXTURE - DOWNLIGHT CEILING 1 LIGHT FIXTURE - WALL WASH DOWNLIGHT CEILING 1 LIGHT FIXTURE - WALL MOUNTED WALL 1 LIGHT FIXTURE - WALL BRACKET WALL 1 LIGHT TRACK WITH FIXTURES SURFACE 1 EXIT FIXTURE - WALL MOUNT WALL EXIT FIXTURE - CEILING MOUNT CEILING EXIT FIXTURE W/ EMERGENCY HEADS - WALL MOUNT WALL EXIT FIXTURE W/ EMERGENCY HEADS - CEILING MOUNT CEILING DUAL HEAD EMERGENCY LIGHT FIXTURE WALL 1, 2 AREA LIGHT FIXTURE - POLE MOUNTED POLE 1 PHOTO-ELECTRIC CELL WITH RELAY SURFACE 1 OCCUPANCY SENSOR - CEILING MOUNT CEILING 1 LIGHTING RELAY/POWER PACK SURFACE 1 TIME CLOCK - 7 DAY 5' - 0" WALL OCCUPANCY SENSOR SWITCH 4' - 0" SINGLE POLE SWITCH 4' - 0" DOUBLE POLE SWITCH 4' - 0" THREE WAY SWITCH 4' - 0" FOUR WAY SWITCH 4' - 0" DIMMER SWITCH 4' - 0" LOW VOLTAGE SWITCH 4' - 0" EM PC PP TC SOS S S2 S3 S4 SD SLV 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 LIGHT FIXTURE - OPEN STRIP 1 1, 2 SEE DRAWINGS SEE DRAWINGS EMERGENCY LIGHT FIXTURE - WALL MOUNTED WALL 1, 2 EMERGENCY LIGHT FIXTURE - WALL BRACKET WALL 1, 2 EMERGENCY LIGHT FIXTURE - DOWNLIGHT CEILING 1, 2 J JUNCTION BOX SURFACE WALL JUNCTION BOX 1' - 6" UNO FLOOR JUNCTION BOX FLOOR DISCONNECT SWITCH - NON-FUSED 5' - 0" UNO 4 DISCONNECT SWITCH - FUSED 5' - 0" UNO 4 COMBINATION MAGNETIC STARTER/DISCONNECT 5' - 0" UNO MOTOR STARTER 5' - 0" UNO CONTACTOR 5' - 0" UNO MOTOR SURFACE METER - PLAN VIEW PUSH BUTTON SWITCH 4' - 0" EMERGENCY POWER SHUTOFF SWITCH 4' - 0" PANELBOARD - SURFACE MOUNTED 6' - 6" TO TOP PANELBOARD - RECESSED 6' - 6" TO TOP TRANSFORMER - PLAN VIEW TELEPHONE TERMINAL BOARD J J F WALL WALL PAD/FLOOR DISCONNECT SWITCH - SHUNT TRIP 5' - 0" UNO 4 CIRCUIT BREAKER MCB PANEL - ONE-LINE MLO PANEL - ONE-LINE CURRENT TRANSFORMER CT ENCLOSURE - ONE-LINE TRANSFORMER - ONE-LINE PAD MOUNT XFMR - ONE-LINE METER - ONE-LINE FUSED SWITCH GROUND OH RISER CABLE/WIRE SIZE TAG M XXX LPNR XXXA XXXA XP AUTOMATIC TRANSFER SWITCH GROUND SLEEVE - ONE-LINE FUSED DISCONNECT - ONE-LINE XX X X KEYED NOTE TAG MECH/ELEC. EQUIPMENT TAG OTHER EQUIPMENT TAG X ABBREVIATIONS AFCI - ARC FAULT CKT INTERRUPTER AFF - ABOVE FINISHED FLOOR AFG - ABOVE FINISHED GRADE AIC - AMPS INTERRUPTING CAPACITY AL - ALUMINUM ATS - AUTOMATIC TRANSFER SWITCH BC - BARE COPPER BFC - BELOW FINISHED CEILING BFG - BELOW FINISHED GRADE CKT - CIRCUIT CND. OR C. - CONDUIT CLG - INSTALLED IN CEILING C.R. - CORD REEL CT - CURRENT TRANSDUCER CU - COPPER (E) - EXISTING TO REMAIN EC - ELECTRICAL CONTRACTOR EM - EMERGENCY (F) - FUTURE FACP - FIRE ALARM CONTROL PANEL FLA - FULL LOAD AMPS FVNR - FULL VOLTAGE NON REVERSING GC - GENERAL CONTRACTOR GFCI - GROUND FAULT CKT INTERRUPTER GND - GROUND HP - HORSEPOWER IG - ISOLATED GROUND KW - KILOWATTS LCP - LIGHTING CONTROL PANEL LTG - LIGHTING LV - LOW VOLTAGE MC - MECHANICAL CONTRACTOR MCA - MINIMUM CIRCUIT AMPS MCB - MAIN CIRCUIT BREAKER MCC - MOTOR CONTROL CENTER MDP - MAIN DISTRIBUTION PANEL MLO - MAIN LUGS ONLY MOCP - MAX. OVERCURRENT PROTECTION (N) - NEW NIC - NOT IN CONTRACT NEC - NATIONAL ELECTRICAL CODE NFPA - NATIONAL FIRE PROT. ASSN. NL - NIGHT LIGHT NR - NOT REQUIRED NTS - NOT TO SCALE PC - PLUMBING CONTRACTOR PH - PHASE PNL - PANEL POC - POINT OF CONNECTION POS - POINT OF SALE (R) - RELOCATED REC - RECEPTACLES RMC - RIGID METAL CONDUIT SCA - SHORT CIRCUIT AMPERES SES - SERVICE ENTRANCE SWITCHGEAR SPD - SURGE PROTECTIVE DEVICE TL - TWIST LOCK TTB - TELEPHONE TERMINAL BOARD TR - TAMPER RESISTANT TYP - TYPICAL UNO - UNLESS NOTED OTHERWISE VA - VOLT/AMPS VIF - VERIFY IN FIELD VR - VANDAL RESISTANT WP - WEATHERPROOF/NEMA 3R WU - FURNISHED WITH UNIT XFMR - TRANSFORMER NOTES WIRING / CONDUIT UNDERGROUND/FLOOR WIRING CONDUIT TURNED UP CONDUIT TURNED DOWN CIRCUIT HOME RUN TO PANEL: # OF ARROWHEADS INDICATE # OF CIRCUITS (SEPARATE NEUTRAL PER CIRCUIT). BOTH EX. INCLUDE AN EQUIP. GROUND. 1.SEE LIGHT FIXTURE SCHEDULE FOR TYPE, MOUNTING, AND OTHER SPECIFICS. 2.CONNECT EMERGENCY AND/OR EXIT LIGHTS TO THE UNSWITCHED SIDE OF THE AREA LIGHTING BRANCH CIRCUIT. 3.ARROW DENOTES EXIT DIRECTION. 4.USE HEAVY DUTY FOR 480 VOLT. 5.MOUNT SWITCH AT DOOR JAM PER MANUFACTURER'S INSTRUCTIONS. 6.PROVIDE UL LISTED DEVICE TO BE USED WITH THE FIRE ALARM PANEL/SYSTEM OR PROVIDE A MONITOR MODULE TO CONNECT INTO FIRE ALARM SYSTEM. 7.PROVIDE RACEWAY WITH OUTLETS 12" ON CENTER UNO. X EXXX DETAIL/VIEW REFERENCE TAG DETAIL/VIEW NUMBER SHEET NUMBER THERMAL OVERLOAD SWITCH 4' - 0" UNO PILOT LIGHT SWITCH 4' - 0" DUPLEX OUTLET, 20A, 120VAC 1' - 6" UNO DUPLEX OUTLET, 20A, 120VAC - GFCI DUPLEX OUTLET - SPLIT WIRED DUPLEX OUTLET - ISOLATED GROUND DUPLEX OUTLET WITH USB PORTS DUPLEX OUTLET - OCCUPANCY SENSOR CONTROLLED DUPLEX OUTLET, 20A, 120VAC - CEILING CEILING DUPLEX OUTLET, 20A, 120VAC - FLOOR FLOOR FOURPLEX OUTLET, 20A, 120VAC FOURPLEX OUTLET, 20A, 120VAC - GFCI FOURPLEX OUTLET - ISOLATED GROUND FOURPLEX OUTLET, 20A, 120VAC - CEILING CEILING FOURPLEX OUTLET, 20A, 120VAC - FLOOR FLOOR APPLIANCE OUTLET - 208/240V SINGLE PHASE 18" OR 48" APPLIANCE OUTLET - 208/480V 3-PHASE 18" OR 48" TELEPHONE OUTLET DATA OUTLET DUAL TELEPHONE/DATA OUTLET CABLE TELEVISION OUTLET DUAL TELEPHONE/DATA OUTLET - FLOOR FLOOR STH SP OS CEILING DATA OUTLET/ WIRELESS ACCESS POINT CEILING DATA OUTLET - FLOOR FLOOR 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO 1' - 6" UNO GENERAL NOTES: 1.THE ELECTRICAL SYSTEMS DEFINED BY THESE PLANS AND THE SPECIFICATIONS ARE TO BE CONSTRUCTED AS COMPLETE AND OPERABLE SYSTEMS AND SHALL BE BID WITH THIS INTENT. THE CONTRACTOR SHALL VISIT THE SITE, READ ALL THE RELEVANT DOCUMENTS, AND BECOME FAMILIAR WITH THE TYPE OF CONSTRUCTION AND WORK TO BE ACCOMPLISHED. SHOULD ANY ERROR, OMISSION, OR CONFLICT EXIST IN EITHER THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING BEFORE SUBMITTING THEIR BID PRICE SO A CHANGE CAN BE ISSUED IN A PRE-BID ADDENDUM. OTHERWISE, THE CONTRACTOR AND/OR EQUIPMENT SUPPLIERS SHALL SUPPLY THE PROPER MATERIALS AND LABOR TO INSTALL COMPLETE AND OPERABLE SYSTEMS INCLUSIVE OF THE ORIGINAL BID. WHEN EACH ELECTRICAL SYSTEM IS COMPLETE, THE CONTRACTOR SHALL TEST AND CONFIRM ITS PROPER OPERATION. ANY INCOMPLETE SYSTEM SHALL BE MADE COMPLETE AND OPERABLE PRIOR TO PROJECT CLOSEOUT. 2.THE ARCHITECTURAL AND MECHANICAL PLANS ARE CONSIDERED A PART OF THE ELECTRICAL DOCUMENTS SO FAR AS ANY ELECTRICAL ITEMS THEY MAY CONTAIN. THE ELECTRICAL CONTRACTOR SHALL REFER TO AND COORDINATE WITH THEM. NO EXTRA COST SHALL BE ALLOWED FOR FAILURE TO COORDINATE THE CONTRACT DOCUMENTS WITH OTHER TRADES AND/OR IF EQUIPMENT DIMENSIONS ARE GREATER THAN SPECIFIED AND/OR DIMENSIONED ON THE PLANS. 3.THE ELECTRICAL CONTRACTOR SHALL PROVIDE EQUIPMENT, MATERIALS, AND LABOR FOR THE CONNECTIONS OF ALL EQUIPMENT SHOWN ON THE PLANS - ARCHITECTURAL, MECHANICAL, ETC. 4.THIS PROJECT IS TO BE INSTALLED IN STRICT ACCORDANCE WITH THE MOST RECENT LOCAL, STATE, AND NATIONAL CODES. IF AT ANY TIME DURING OR AFTER CONSTRUCTION SOMETHING IS FOUND TO BE INSTALLED IN VIOLATION OF THESE CODES LISTED ABOVE, IT SHALL BE CORRECTED BY THE CONTRACTOR. 5.WHERE A RACEWAY ENTERS A BUILDING OR STRUCTURE FROM THE OUTSIDE, IT SHALL BE SEALED AS PER NEC 225.27. 6.ALL ELECTRICAL EQUIPMENT THAT IS LIKELY TO REQUIRE EXAMINATION, ADJUSTMENT, SERVICING OR MAINTENANCE WHILE ENERGIZED SHALL BE FIELD OR FACTORY LABELED TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC FLASH HAZARDS PER NEC 110.16. THE LABEL SHALL ALSO CONTAIN THE MAXIMUM AVAILABLE FAULT CURRENT AND THE DATE THE FAULT CURRENT CALCULATIONS WERE PERFORMED AS PER NEC 110.24. 7.ALL PANELBOARDS AND SWITCHBOARDS SHALL BE PERMANENTLY MARKED TO INDICATE EACH DEVICE OR EQUIPMENT WHERE THEIR POWER ORIGINATES AS PER NEC 408.4B. 8.ALL EQUIPMENT PROVIDED BY THE EC SHALL BE LISTED AND LABELED BY A NATIONALLY RECOGNIZED TESTING AGENCY, ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION, AND BE PROPERLY INSTALLED FOR THE CONDITIONS AND SPACE THAT EQUIPMENT IS BEING INSTALLED WITHIN. 9.THE EC SHALL INSTALL A SEPARATE EQUIPMENT GROUNDING CONDUCTOR IN EACH CONDUIT RUN. CONDUIT SHALL NOT BE USED AS AN EQUIPMENT GROUNDING CONDUCTOR. THE EC SHALL GROUND THE ELECTRICAL SYSTEM IN ACCORDANCE WITH LOCAL AND NATIONAL CODES. 10.CONDUIT LAYOUTS SHOWN ON THE PLANS ARE DIAGRAMMATIC, NOT INDICATING THE ROUTING REQUIRED. THE EC SHALL ROUTE THE CONDUITS AS REQUIRED BY THE CONDITIONS OF THE INSTALLATION AND SHALL COORDINATE WITH DUCTWORK, PIPING, EQUIPMENT, BUILDING STRUCTURE, AND OTHER POTENTIAL OBSTRUCTIONS. 11.THE CONTRACTOR SHALL ALLOW THE MOVEMENT, BEFORE ROUGH-IN, OF ANY ELECTRICAL PANEL, DEVICE, LUMINAIRE, ETC. A DISTANCE OF 10 FEET WITHOUT REQUIRING ADDITIONAL COST TO THE PROJECT. 12.THE EC SHALL SECURE ALL CONDUIT TO THE STRUCTURE AS IT IS SET IN PLACE USING INDUSTRY STANDARD METHODS AND PRACTICES. TO ASSURE ALL DEVICES ARE RIGIDLY SET, THE ELECTRICAL CONTRACTOR SHALL SECURE ALL DEVICE BOXES WITH BRACKETS, HANGERS, ETC. DESIGNED FOR THE APPLICATION. 13.MINIMUM SIZE CONDUIT SHALL BE 3/4" UNO. CONDUIT INSTALLED WITHIN THE BUILDING IN DRY LOCATIONS WITHIN WALL, CEILINGS, OR EXPOSED NOT SUBJECT TO PHYSICAL DAMAGE SHALL BE EMT WITH STEEL SET SCREW FITTINGS. IN EXTERIOR LOCATIONS (EXCEPT FOR THE SERVICE ENTRANCE) THE CONDUIT SHALL BE EMT WITH COMPRESSION GLAND TYPE FITTINGS. UNDERGROUND CONDUIT SHALL BE PVC (SCH. 40) WITH GRC ELBOWS AND RISERS WRAPPED IN CORROSION RESISTANT MATERIALS WHERE IN DIRECT CONTACT WITH THE SOIL. 14.FLEXIBLE CONDUIT SHALL BE LIMITED TO CONNECTIONS TO LIGHT FIXTURES AND FINAL CONNECTIONS TO MOTORS OR OTHER EQUIPMENT SUBJECT TO VIBRATION. LENGTHS OF FLEXIBLE OR SEAL-TITE CONDUIT SHALL NOT BE GREATER THAN 72 INCHES. 15.ELECTRICAL CONTRACTOR SHALL PROVIDE ALL EMPTY CONDUITS WITH 200LB RATED NYLON PULL CORD. 16.BEFORE ANY ELECTRICAL CONDUIT, BOXES, ETC. ARE COVERED (FLOOR, CEILINGS, WALLS, ETC.), THEY SHALL BE APPROVED BY THE INSPECTING OFFICER (INSPECTOR). 17.WHERE WIRE SIZE IS NOT SHOWN ON THE DRAWINGS FOR 20A, 120VAC BRANCH CIRCUITS, THE CIRCUIT SHALL CONSIST OF 2#12 (CU,THHN) + 1#12 (CU,THHN) GND IN 3/4" EMT CONDUIT. THIS WIRE SIZE SHALL BE INCREASED TO #10 (CU,THHN) FOR BRANCH CIRCUITS WITH OVERALL LENGTHS EXCEEDING 125' TO ACCOMMODATE FOR VOLTAGE DROP. REFER TO EQUIPMENT SCHEDULES, FEEDER SCHEDULES, AND NOTES ON DRAWINGS FOR ALL OTHER BRANCH CIRCUIT AND FEEDER WIRE/CONDUIT SIZING. 18.CONDUCTORS SHALL BE COPPER, 600VAC RATED, TYPE THHN/THWN-2 UNO. CONDUCTORS UP TO #10AWG SHALL BE SOLID AND CONDUCTORS #8AWG OR LARGER SHALL BE STRANDED. 19.METAL CLAD CABLING MAY BE USED BETWEEN DEVICES SUCH AS LIGHTING, RECEPTACLES, SWITCHES, ETC. UNLESS OTHERWISE REQUIRED BY THE NEC. HOME RUNS SHALL BE INSTALLED IN CONDUIT. MC CABLE SHALL NOT BE INSTALLED EXPOSED. 20.EC SHALL CLEAN THE ENTIRE ELECTRICAL SYSTEM AFTER COMPLETION OF THE INSTALLATION. REMOVE ALL FINGER PRINTS, FOREIGN MATTER, PAINT, DIRT, GREASE, AND UN-NEEDED LABELS OR STICKERS FROM FIXTURES AND EQUIPMENT. REMOVE ALL RUBBISH AND DEBRIS ACCUMULATED DURING INSTALLATION FROM THE PREMISES. 21.IT IS THE INTENT OF THE CONSTRUCTION DOCUMENTS FOR ALL DEVICES TO BE FLUSH MOUNTED AND CONDUIT/CABLING INSTALLED CONCEALED WITHIN WALLS/CEILINGS. IN AREAS WHERE CONDUIT MUST BE INSTALLED EXPOSED IT SHALL BE COORDINATED WITH THE ARCHITECT AND/OR ENGINEER. ALL EFFORTS SHALL BE MADE TO CONCEAL WIRING METHODS. 22.ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE SEALED WITH FIRE STOPPING, IE. 3M BRAND CAULK, PUTTY, STRIP AND SHEET FORMS, DOW CORNING 3-6548 SILICONE RTV FOAM. 23.COORDINATE LOCATION OF WALL MOUNTED DEVICES WITH CABINETRY AND OTHER WALL OBSTRUCTIONS. COORDINATE CEILING MOUNTED DEVICES WITH CEILING OBSTRUCTIONS. ANY DEVICES THAT NEED TO BE RELOCATED MUST BE BROUGHT TO THE ATTENTION OF THE ELECTRICAL ENGINEER PRIOR TO ROUGH-IN FOR NEW LOCATION. 24.IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO COORDINATE PLACEMENT OF ALL DEVICES INSTALLED WITHIN THE CEILING SUCH AS LIGHTING, SPEAKERS, FIRE SPRINKLERS, SMOKE/HEAT DETECTORS, ETC. ANY EXISTING DEVICES THAT NEED TO BE RELOCATED IN ORDER TO ACCOMMODATE NEW CONSTRUCTION/REMODEL MUST BE BROUGHT TO THE ATTENTION OF THE ELECTRICAL ENGINEER PRIOR TO ROUGH-IN FOR RESOLUTION AND FURTHER DIRECTION. REMODEL NOTES: 24.THE EC SHALL COORDINATE AND CONFIRM THE EXACT LOCATION OF THE EXISTING POWER PANELS FROM WHICH NEW CIRCUITS ARE BEING FED. VERIFY EXISTING BRANCH CIRCUIT BREAKERS AND PROVIDE NEW BRANCH CIRCUIT BREAKERS AS NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM. 25.THE EC SHALL COORDINATE AND CONFIRM THE EXACT LOCATION OF THE TELECOM ROOM FROM WHICH NEW TELE/DATA OUTLETS WILL BE FED. VERIFY EXISTING PATCH PANEL SPACES AND PROVIDE NEW PATCH PANELS AS NECESSARY TO LAND/TERMINATE NEW TELECOM CABLING. 26.26.ALL DEVICES NOT SHOWN ON PLANS ARE EXISTING TO REMAIN IN PLACE AND FUNCTIONAL. IN THE EVENT THAT WIRING TO AN EXISTING DEVICE IS DAMAGED, WIRING MUST BE REPLACED AND DEVICE BROUGHT BACK TO FULL OPERATION. LIGHTING NOTES: 27.ALL BATTERY POWERED OR CONTINUOUS BURN LUMINAIRES SHOWN ON THE PLANS, SUCH AS EXIT LIGHTS, NIGHT LIGHTS, OR EMERGENCY LIGHTS, SHALL BE CONNECTED TO THE UN-SWITCHED LEG OF THE LIGHTING CIRCUIT FEEDING THAT AREA. 28.LUMINAIRES INSTALLED IN THE MECHANICAL ROOM SHALL BE PLACED SO THAT ALL EQUIPMENT IS ADEQUATELY ILLUMINATED AFTER THE MECHANICAL EQUIPMENT IS IN PLACE. 29.ALL LUMINAIRES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AND NOT THE CEILING GRID OR OTHER NONSTRUCTURAL MEMBERS. 30.TO MAINTAIN CONSISTENT LIGHT QUALITY, FOR ANY ONE LAMP TYPE SUPPLIED, LAMPS SHALL BE OF THE SAME MANUFACTURER, SURFACE TEMPERATURE, COLOR RENDERING INDEX, LAMP EFFICACY, LUMEN OUTPUT, AND STARTING CHARACTERISTICS FOR ALL INSTALLED. 31.LIGHT FIXTURES INSTALLED IN DAMP OR WET LOCATIONS SHALL BE UL LISTED FOR INSTALLATION IN THE PROPER ENVIRONMENT. CARE SHOULD BE TAKEN TO ENSURE THAT DIFFUSERS AND LENSES ARE APPROPRIATE FOR THEIR INSTALLED USE AND PREMATURE DISCOLORATION WILL NOT RESULT DUE TO EXPOSURE TO UV LIGHT, CHEMICALS, OR OTHER CONDITIONS. 32.ELECTRICAL CONTRACTOR SHALL PROVIDE LIGHTING CONTROL SHOP DRAWINGS WITH ELECTRICAL SUBMITTAL FOR REVIEW. POWER NOTES: 33.ELECTRICAL CONTRACTOR SHALL CONFIRM MINIMUM CODE (NEC) WORKING CLEARANCE BEFORE INSTALLING ANY ELECTRICAL PANELS OR CABINETS AND SHALL MOVE THE PANELS IF REJECTED BY AN INSPECTOR. IF CLEARANCE IS NOT POSSIBLE, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY IN WRITING. 34.WIRING DEVICES SHALL HAVE A NYLON COVER PLATE. COLOR SHALL BE COORDINATED WITH ARCHITECT. EXTERIOR OUTLETS SHALL HAVE CAST COVERS WITH FLIP TYPE LIDS UNO. 35.THE EC SHALL MAINTAIN ELECTRICAL CONTINUITY TO REMAINING EQUIPMENT WHEN ANY EXISTING ELECTRICAL EQUIPMENT IS REMOVED. 36.EC SHALL COORDINATE WITH EQUIPMENT SUPPLIERS ON THE EXACT LOCATIONS OF ALL EQUIPMENT AND ELECTRICAL CONNECTIONS PRIOR TO ROUGH-IN. THE EC SHALL MAKE THE FINAL CONNECTION TO ALL EQUIPMENT UNLESS OTHERWISE DIRECTED BY THE EQUIPMENT SUPPLIER. OBTAIN FROM SUPPLIERS ALL WIRING DIAGRAMS FOR EQUIPMENT PRIOR TO ANY ROUGH-IN. TO ASSURE THAT PROPER CHARACTERISTICS ARE PROVIDED, ANY INCORRECT WIRING OR DEVICES INSTALLED BY THE EC WITHOUT THE WIRING DIAGRAM SHALL BE CORRECTED AT THE EC'S EXPENSE. PROVIDE COPIES OF WIRING DIAGRAMS WITHIN EACH PIECE OF EQUIPMENT AND ADDITIONAL COPIES WITH THE OPERATION AND MAINTENANCE MANUALS. 37.EC SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR TO PROVIDE CONDUIT AND DEVICE MOUNTING BOXES FOR THERMOSTATS AND OTHER MECHANICAL CONTROLS. REFER TO MECHANICAL DRAWINGS FOR THE LOCATION OF THERMOSTATS. 38.PROVIDE A 20AMP, 120VAC RECEPTACLE INSTALLED AT AN ACCESSIBLE LOCATION FOR THE SERVICING OF HEATING, AIR CONDITIONING, AND REFRIGERATION EQUIPMENT PER NEC 210.63. RECEPTACLE SHALL BE OF THE GROUND FAULT CIRCUIT INTERRUPTING TYPE, INSTALLED WITHIN A CAST METAL BOX, AND WITHIN 25' OF ALL REQUIRED EQUIPMENT. DATA/TELECOM NOTES: 39.THE ELECTRICAL CONTRACTOR SHALL PROVIDE ROUGH-IN ONLY FOR THE TELECOM/CAT6 SYSTEMS. THIS SHALL CONSIST OF A FOUR SQUARE DEVICE MOUNTING BOX WITH CONDUIT TO ABOVE ACCESSIBLE CEILING SPACE OR TO THE CEILING SPACE ABOVE IF OPEN. CABLING, JACKS, FACEPLATES, TESTING AND TERMINATIONS SHALL BE PROVIDED AND INSTALLED BY OTHERS. ROOF NOTES: 40.ELECTRICAL CONTRACTOR TO INSTALL A ROOF JACK (BOOT) FOR ALL CONDUIT PENETRATIONS THROUGH THE ROOF. ALL ROOF PENETRATION SEALS SHALL BE IN ACCORDANCE WITH THE ROOF WARRANTY AND BE COMPLETELY SEALED WITH ROOF ADHESIVE. UTILIZE PROPER CLAMPING METHODS TO SEAL BOOT AROUND CONDUIT. ELECTRICAL GENERAL NOTES CONSULTING ENGINEERS, INC. 2117 South 3600 West, Salt Lake City, UT 84119 (801) 566-0503 www.rmceut.com Project # ROCKY MOUNTAIN E000 DL DL DL DL DLDLDLDL DL DL DLDL DL DL DL DL DL PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 DLDL PL2 DL S3 S3 SOS SOS PL2 DL GL GL GL GLGLE GL GL GL GL GL GL GL GL GLE GL PL2 DL DL EX EX EX EX EX OW1 OW1 OW1 OWE OW1 OW1 OW1 OW1 OW2E OW2E OW2E OW2E S S bbbb bb b b b b b b ccc c c c c c c c c c c c c c c c c c c c cc a a a a a a a a a a a a aa Sa b c 1 1 C- 24 C-26 2 3 S O S 3 3 PL1 c J 5 DLbDL b GLE GLE GLE EX EXEM EM EM EM EM 4 4 4 4 LI G H T I N G P L A N E101 1 LIGHTING PLAN SCALE: 1/4" = 1'-0" GENERAL NOTES KEYED NOTES# A.CONNECT ALL EMERGENCY AND EXIT LIGHT FIXTURES TO THE UNSWITCHED SIDE OF THE LIGHTING BRANCH CIRCUIT. LIGHT FIXTURES WITH EMERGENCY DRIVERS SHALL BE NORMALLY SWITCHED WITH THE AREA LIGHTING, BUT HAVE THEIR EMERGENCY DRIVERS CONNECTED AHEAD OF THE LIGHT SWITCH OR LIGHTING CONTROL PANEL RELAY. FIXTURES WILL REMAIN ON FOR NOT LESS THAN 90 MINUTES IN CASE OF POWER LOSS. B.IT IS THE INTENT OF THE CONSTRUCTION DOCUMENTS THAT CONDUIT IS TO BE INSTALLED WITHIN WALLS AND ABOVE CEILINGS CONCEALED WHERE POSSIBLE. C.COORDINATE MOUNTING HEIGHTS OF ALL PENDANT AND WALL MOUNTED LIGHT FIXTURES WITH ARCHITECTURAL ELEVATIONS. D.ELECTRICIAN TO VERIFY FIXTURE DIMMING CONTROLS AND TO PROVIDE THE NECESSARY WIRING AND DEVICES REQUIRED FOR DIMMING OPERATION. E.EC TO CONCEAL ALL FIXTURE DRIVERS IN ACCESSIBLE CEILING SPACE OUT OF DIRECT VIEW. 1.PROVIDE A WALL MOUNT DUAL TECH TWO POLE OCC. SENSOR FOR RESTROOM LIGHT AND FAN CONTROL. (SENSOR SWITCH #WSX PDT 2P OR EQUIVALENT). 2.CONNECT NEW EXTERIOR LIGHTING TO EXISTING EXTERIOR CIRCUIT AND CONTROLS. 3.REPLACE EXISTING LIGHT FIXTURE WITH NEW. VERIFY CIRCUIT CONTROLS ARE OPERATING CORRECTLY. 4.EXTERIOR SOLAR POWERED EGRESS FIXTURE. MOUNT FIXTURE AT 8'-3" AFF TO CENTER OF FIXTURE. 5.VERIFY SIGN MOUNTING HEIGHTS WITH ARCHITECTURAL ELEVATIONS. COORDINATE CONNECTION REQUIREMENTS WITH THE SIGN VENDOR PRIOR TO CONSTRUCTION. LTG CTRL LIGHTING AND CONTROLS ARE DESIGNED TO MEET IECC 2018. LIGHTING CONTROL PANEL WILL BE PROGRAMMED TO TURN LIGHTS ON AND OFF FOR HOURS OF OPERATION. LOW VOLTAGE SWITCHES WILL ACT AS OVERRIDES TO TIME SCHEDULING. PHOTOCELLS WILL AUTOMATICALLY DIM LIGHTS WHEN DAYLIGHTING IS AVAILABLE. OCCUPANCY SENSORS WILL CONTROL LIGHTING IN RESTROOMS, UTILITY, AND BREAK ROOMS. WALL MOUNTED DIMMABLE OCC. SENSORS WILL BE PROVIDED IN PRIVATE OFFICES AND CONFERENCE ROOMS. OCCUPANCY SENSORS SHALL BE MANUAL ON OR CONTROLLED TO AUTOMATICALLY TURN ON TO NOT MORE THAN 50-PERCENT. (C405.2.1.1) MAIN LEVEL LIGHTING EXEMPT FROM DAYLIGHTING REQUIREMENTS PER IECC 2018 C405.2.3 EXEMPTIONS - 3. (A2 AND GROUP 'M' OCCUPANCY) CORRIDOR, AND STAIRWELL LIGHTING ARE EXEMPT FROM LIGHTING CONTROLS PER IECC 2018 C405.2 KITCHEN AUTOMATIC LIGHTING CONTROLS NOT REQUIRED PER (C405.2.2 - EXCEPTION 2 (SPACES WHERE AUTOMATIC SHUTOFF WOULD ENDANGER OCCUPANT SAFETY). MANUAL DIMMER SWITCHES PROVIDED. EXTERIOR LIGHTING SHALL BE PROGRAMMED TO TURN ON AT 6 A.M. AND OFF AT MIDNIGHT. PHOTOCELL WILL AUTOMATICALLY TURN LIGHTS OFF WHEN DAYLIGHTING IS PRESENT AND SATISFIES THE LIGHTING NEEDS. (C405.2.6.1 - C405.2.6.3) BUILDING FACADE AND LANDSCAPE LIGHTING SHALL BE PROGRAMMED TO SHUT OFF NOT LATER THAN 1 HOUR AFTER BUSINESS CLOSING TO NOT EARLIER THAN 1 HOUR BEFORE BUSINESS OPENS. (C405.2.6.2) SEQUENCE OF OPERATION CONSULTING ENGINEERS, INC. 2117 South 3600 West, Salt Lake City, UT 84119 (801) 566-0503 www.rmceut.com Project # ROCKY MOUNTAIN E101 S T 44"44" 48" 84" 36"36" A-28A-13A-33A-40A-37A-23 'C' 'B' 'A' 1 C-13 C-14 C-152 C-16C-18 C-17 C-19 C-20 C-21 3 4 2 C-28 C-30 5 SSS 6 6 6 7 RT 1 F (ROOF) WP C-25,27,29 8C-31 WH 1 RP 1 9 GENERAL NOTES KEYED NOTES 1.LOCATION OF EXISTING ELECTRICAL PANELS. REPAIR AND REPLACE AS NEEDED. 2.MOUNT POS SYSTEM RECEPTACLES AND DATA OUTLETS AT 24" AFF ON THE KITCHEN SIDE OF THE CABINETRY REAR WALL. COORDINATE CONDUIT ROUTING AND MOUNTING OF THE OUTLET BOXES WITH THE MILLWORK CONTRACTOR. 3.RELOCATE EXISTING EQUIPMENT AND EXISTING CIRCUITRY TO NEW LOCATION SHOWN. VERIFY ALL ELECTRICAL LOCATED UNDER THE HOOD IS SHUNT PROTECTED AND INTERLOCKED WITH THE HOOD ANSUL SYSTEM. 4.COORDINATE THE RELOCATION OF EXISTING HOOD TO NEW LOCATION WITH MECHANICAL CONTRACTOR. 5.MOUNT SAFE RECEPTACLE AND DATA OUTLET AT 24" AFF ON THE KITCHEN SIDE OF THE CABINETRY REAR WALL. COORDINATE CONDUIT ROUTING AND MOUNTING OF THE OUTLET BOXES WITH THE MILLWORK CONTRACTOR. 6.EXISTING ELECTRICAL IN THIS AREA TO REMAIN. REPLACE ALL ELECTRICAL DEVICES WITH NEW 7.CONNECT SPEAKER LOOP TO EXISTING LOBBY SPEAKER SYSTEM. FIELD COORDINATE LOCATIONS OF EXISTING SPEAKERS. 8.COORDINATE LOCATION OF GAS WATER HEATER AND RECIRC PUMP PRIOR TO ROUGH IN. 9.CIRCUIT WITH EXISTING ROOFTOP RECEPTACLES. # PO W E R P L A N E201 1 POWER PLAN SCALE: 1/4" = 1'-0" CONSULTING ENGINEERS, INC. 2117 South 3600 West, Salt Lake City, UT 84119 (801) 566-0503 www.rmceut.com Project # ROCKY MOUNTAIN E201 A.COORDINATE FINAL OUTLET LAYOUT AND MOUNTING HEIGHTS WITH MILLWORK CONTRACTOR PRIOR TO ROUGH-IN. B.VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT WITH MANUFACTURER'S RECOMMENDATIONS PRIOR TO INSTALLATION OF EQUIPMENT. C.EC TO PROVIDE CIRCUIT LABELS ON THE FACE OF EACH RECEPTACLE PLATE CLEARLY LABELING THE CIRCUIT. D.ALL RECEPTACLES TO BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. EL E C T R I C A L SC H E D U L E S CONSULTING ENGINEERS, INC. 2117 South 3600 West, Salt Lake City, UT 84119 (801) 566-0503 www.rmceut.com Project # ROCKY MOUNTAIN E601