Loading...
HomeMy WebLinkAboutMISC DOCS - 17-00667-682,747,749 - 430 W 2nd S - Providence Square #1-15E D Permit Details CITY OF RExBuRG Arroericas Famity Community �_)U VV zncl MFR Bldg, #1 430 W 2nd S Permit Review Status plan ReViRuUG: Qf_;11 14-5 01�-nqress Fire Department Review - Site Plan Building Review Public Works Review - Site Plan PICa"nning and Zoning Review - Site Plan Plan Review Details buildingRe-view Status: REVISIONS Reviewed By: Quinton Ovens quin,ton-owens@rexburg.org Community Development Department 35 North Ist East Rexburg, ID 83440 Permit Technician (208) 372-.2341 Inspection Hotline (208) 372-2344 47)n rl� Cn,'l 1-1 14 "17Y =1 ITe— re -i A fz�ll r o Current BLMdinq Revie-w statfjq- P FVTC, Tn h I Q Ai3nlicatinn hinm6caffoh. I - - I - k-0 -I- %-.Z I '" %-? A- Z Multi -Family Residential Appll'caticn Received Date: 10/30/2017 APP11cation Approved Date: 10/30/2017 Application Approved Status: APPW/EXCp Status of Plan Reviews Completed Electrical Review -Building Review Building Review Planning and Zoning Review - Site Pian Public Works Review - Site Plan HVAC Review Plumbing Review COMPLETED REVISIONS REVISIONS REVISIONS REVISIONS COMPLFTED COMPLETED 11/01/2017 1110212-017 11/03/2017 11/06/2017 11/07/2017 .11/13/2017 11/13/2017 Review Dcate: 11/02/2017 Water nroofine meet the rt -a I rirp 1-1 J Ir tUf ID�, _r1I I Section 1805 y �_a � UVB an rc hector drawings wh1ch REVISIONS have not beensubmitted. M j scel I a neo us Peview 'Revisions Riespc)nse '. Revisions Response -, Additional Ins t)e or Com mments 3F Approved for only footing and foundation. \N, affirig on building Plans to be submitted. Approved for foot�ng & foundation permit only. REVISIONS No underground or slab is approved. New building plans have not been resubmitted to confirm approval on further work. Keynote 7h on sheets A4.1 -A4.5 calls for foundation coating. Spec section 07113 indicates praducts 10 use James Wyatt 12.19-17 APPrOval of plans does not ro'7-5ftLle aPP-0val of variance from codE Page I of 1 Permit Details __ R.EXBURG America's Family Community 'f-�U VV 2no MFR Bidg,1 430 W 2nd Permit ReviewStatus Fire Departrnent review - Site Plan Building Review P u bk Works Review , Site Plan Planning and Zoning Review - Site Plan Plan Review Details ualding Review Status: REVIsioNs Reviewed By. Quinton Owens qLjjntc)n.owens@rexburg.org COMmunity DeVelopment Department 35 North Vt East Rexburg, ID 83440 Piermit Technician (208) 372-2341 Inspection Hotline (208) 372-2344 Current Building Review Status: REVISIONS AmAcation NHmher 1 7_nneza-y r,. __--- - �ff %& %aA&ff Multi -Family Residential Application received Date: 10/30/2017 Application Approved Date: 10/30/2017 Ppl cation Approved Status: PPVI/FX P Staters of PJa n 1 Electrical Revise Building Review Building review Planning and Zoning revise -- Site Plan Public or nevi - Site Plan HVAC Review Plumbing revise eviews Cqmpjeted COMPLETED REVISIONS REVISIONS REVISIONS REVISION'S COMPLETED COMPLETED evle�v Date; 11/03/2017 Building complies with IECC (IBC, 1301) Square fOotage was deck and adjusted an COMcheck. Basement wails changed to 2 x 6, batt T nsulation keep at R-21, James Wyatt 12.19.17 lei r res Response Fire barriers meet the requirements of IBc Section 707 *Revisions Response Fire raked floor ceiling assembly added to stair landing. (GA FC -512Q) dames Wyaft 12. 1 9. 1 7 Revise CC Mcheck: Slabs in basement are not suppose to be included. Double check framed exterior wall square footage (did the stair walls get added Basement perimeter livalls are noted as baro a 2x4 wall with -1 Batts on energy report. Please confirm (R-19 bad or better need 2x6 walls} Fire rated stair walls are built as fire barriers (rated in concealed floor space to deck above). *iia rating shown inside door assemblies at stair wall. (Refer to IBS 1026 & 1022) App al of pla ns does n 0 t C-0 nstitue O t-0 V.3/ Of Val-iRfl Pae- 1 of REVISIONS REVISIONS QED CITY o p �"zerzca'sFllrnitY Cornniuni�y -1 — -- , . spa I%, l IjI 1LJk.— Section 708 dire rayed roof/ceiling assembly added to four floor ceilings. (GA RC -2501) games vllyatt 12.19-17 *Revisions Rei n Bu-1Iding height and area meets the requirements ��irements Of IBC Section 500 & Tabule 503 Penetrations meet the requirements Section 714 reb loc i rig and draftstopping meet the requirements of IBC Section 718. I Dwelling Units rpt she requirements f SBC Section 1107 Toilets, Bath in Fac., Sinks, Kit. and Drink. Fount. deet IBC Sec. log Additional ins ct rori Menu: approved for footing & foundation only. Fire Partitions between t 1! _ 2 for units shall either stop at a rated Ceiling OR extend up to roof deck. Only one l r of dull is shown on roof/ceiling assembly(verify Iisting for I hour gated roof; EAGLE ROCK] NG1NF_,ERJN.G. CIVIL o pL9NNING o SURVEI7NG IDAHO FALLS (203) 542.2665 REXBURG (208) 359-2665 December 1 8, 20]7 Providence square Apartments Response letter to Cltv of Rexburg review: P&Z - Response from Eagle Rock Engineering �.. Storage Units have been removed from plans. 2- Parking notes have been updated_ There ars now 2$4 units x 2 = 56g parking sialic required and we have 570,total., q 3. Parking on cast side of clubhouse is two-way direction., 24' in width. 4. Hand.teci-p ramp deral'].s and grades have been revised to meet lnin. sloe. �. Sidewalk to access public right of way to canal bn'd(ye has been added. 6. Sidewalk has been added is connect apartments and clubhouse (ADA ramps shown). 7. 7` landscape ship between curb and sidewalk along 5rif West has been added. Public Works - response from Eagle Rock Engineering 1. Bollards have been tnoved to front wall of gash enclosure. 2. Elevations on brl"dge and on man.hales are now matching. 3. Bridge shuts have been revised to 67' and Bridge plans will now be separate traject. 4. 7' Landscape strip has been added along D TH West and connects to 4 T W by bridge_ 4 5. Existing dri've-way curd has, already been torn out. 6. No access shown is 5 � � W. 7. SS Manhole in STS W. is now shown as existing- 8. Vatve on C-4 has been removed. 9. Storm line, has been moved to not go through infiltrators. 10. Electric has it in their plans.