Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SHORT FORM - 05-00357 - 309 Rebecca Ave - New SFR
AL J 13 HeatI ng 11.0 Q'i_. J s. I t -i and Com fort Shortcorm Entire House Job: I Date: Sep 1, 2005 B# Blair Singleton For: Travis ChappIe Rexburg, Idaho Method Construction quality Fireplaces Infiltration Simplified Average 0 HEATING EQUIPMENT COOLING EQUIPMENT Make AmStd Make AmStd Trade Freedom 90 Trade Standard Model AUC060C936B* Cond 2A7B20214Al Coif TXC036C4 Efficiency 92..1 AFUE Efficiency 11.3 SEER Heating input 60000 Btuh Sensible cooling 16940 Btuh Heating output S�a�D Btuh Laient cooling X260 Btuh Temperature rise fib °F Total cooling Z4200 Btuh Actual air flow 9� 5 cfm Actual air flow 9� 5 cfm Air flow factor a.�29 cfmlStuh Air flow factor (3.x54 cfmlBtuh S#a�ic pressure 0.10 in H2O Static pressure 0.1(3 in H20Space thermostat load sensible hest rano 1.00 ROOM NAME Area Htg load Clg load Htg AVF Cog AVF (ft2) (Btuh) (Btuh) (Cfm) (Gfm) beds 159 2542 X423 r, 73 77 bed 4 187 1585 918 45 514 bed 5 158 1384 918 40 50 cls. 4 20 0 0 D D bed 3 224 1708 735 49 40 mech.1stora9e 165 0 Q D 0 storage 100 0 0 D p family 2 747 5303 735 152 40 stairs 2 40 D fl 4 D bath 2 55 159 0 5 0 cyst. 3 35 o 0 0 0 bed 2 131 1709 1317 49 71 Roam3 42 49a 108 1 4 6 clst, 10 0 D 0 0 mas. bed 225 209 1640 83 89 stairs 40 � 0 d 0 living 126 2076 1553 60 $4 Printout certified by ACCA to meet all requirements of Manua! J 8th Ed. , V ft Right -Site Residential 6.0.02 401 2005 -Sep -13 10.02:59 Page 1 lrttg Cog Outside db (°F) -C 89 Inside db (°F) 70 75 Design Td (OF) 76 14 Daily range _ H Inside humidity 50 Moisture difference (gr/lb) - -31 Method Construction quality Fireplaces Infiltration Simplified Average 0 HEATING EQUIPMENT COOLING EQUIPMENT Make AmStd Make AmStd Trade Freedom 90 Trade Standard Model AUC060C936B* Cond 2A7B20214Al Coif TXC036C4 Efficiency 92..1 AFUE Efficiency 11.3 SEER Heating input 60000 Btuh Sensible cooling 16940 Btuh Heating output S�a�D Btuh Laient cooling X260 Btuh Temperature rise fib °F Total cooling Z4200 Btuh Actual air flow 9� 5 cfm Actual air flow 9� 5 cfm Air flow factor a.�29 cfmlStuh Air flow factor (3.x54 cfmlBtuh S#a�ic pressure 0.10 in H2O Static pressure 0.1(3 in H20Space thermostat load sensible hest rano 1.00 ROOM NAME Area Htg load Clg load Htg AVF Cog AVF (ft2) (Btuh) (Btuh) (Cfm) (Gfm) beds 159 2542 X423 r, 73 77 bed 4 187 1585 918 45 514 bed 5 158 1384 918 40 50 cls. 4 20 0 0 D D bed 3 224 1708 735 49 40 mech.1stora9e 165 0 Q D 0 storage 100 0 0 D p family 2 747 5303 735 152 40 stairs 2 40 D fl 4 D bath 2 55 159 0 5 0 cyst. 3 35 o 0 0 0 bed 2 131 1709 1317 49 71 Roam3 42 49a 108 1 4 6 clst, 10 0 D 0 0 mas. bed 225 209 1640 83 89 stairs 40 � 0 d 0 living 126 2076 1553 60 $4 Printout certified by ACCA to meet all requirements of Manua! J 8th Ed. , V ft Right -Site Residential 6.0.02 401 2005 -Sep -13 10.02:59 Page 1 12 family kftchen/dining utility mas. bath mas clst. Entire House Other equip loads 'r Equip, @ 0.94 Latent Goofing TOTALS A 4 IOC jet A A r% a 4 7n I loth Printout cer#ified by RCCA to meet all requirements of Manual J 8th Ed. Right -Suite Residential 6.0.02 RSR40615 VIZ) X15 2M5 -Sep -13 10-02-59 ZOM Heating 1 Tf .r Buildh.j Analysis Entire House Job: I Date: Sep 13, 2005 Blair Singleton Location: Idaho Fails, !D, U5 Elevation: 4,741 ft Latitude: 44°N Outdoor: Qty bulgy (°F) Daily range OF) Wet bulb (° ) Wind speed (mph) For: TravisChapple Rexburg, Idaho Heating -s Cooling 89 34 � 60 7,5 Indoor: indoor temperature ('OF) Design TQ (°F) Relative hum,dity (%) Moisture difference (gr/lb) Infiltration: H) Method Construction quality fireplaces r•�'-'�'� 41!, .,r•.ras-Ls , r, � . -r'�r� �.._„`-•�$,*: "�. . e ° ..:. a ..•". � Component Btuh/ft2 Btu�-3 °Io of load Walls 1 4.4 13162 30.4 Glazing 25.8 5995 13.81 Doors 27.4 1 724 4.0 Ceilings 2,0 3454 8.4 Floors 1.6 2725 6.3 Infiltration 2.9 4833 1 1. 1 oUcts v 0.0 Piping p 0.0 Humidification 0 0.0 Ventilation 11458 26.E Adjus#meets .. a _p Total 433511 100.0 Heating 70 76 50 61.5 Simplified Average 0 ^ : Cooling 75 14 50 -31.5 Component Btuh/ftp Btuh %of (oaf Walls 0.3 1 r f ' Glazing 31.4 7294 38.4 Doors .; 420- s Ceilings 1.1 s ti M1�S 10.fl Floats p.p p 0.0 Infiltration Q.3 477 2.5 Ducts 0 0.0 Ventilation 2111 11.1 Internal gains 594D 31.0 Blower •� 0.0 Adjustments .. a p Total 19016 1 ^ : Cooling 75 14 50 -31.5 Component Btuh/ftp Btuh %of (oaf Walls 0.3 1 906 14.8 Glazing 31.4 7294 38.4 Doors 6.7 420- 2.2 Ceilings 1.1 1909 10.fl Floats p.p p 0.0 Infiltration Q.3 477 2.5 Ducts 0 0.0 Ventilation 2111 11.1 Internal gains 594D 31.0 Blower 0 0.0 Adjustments p Total 19016 1 Overall Tlu 0.053 f -Q F Data entries checked. V1 t SACAFt Right -Suite Resider -al 6.0-02 SR4()61 CAMY DocumentsWightsoft1--VAC. #pple ConstructiOn 1 ."ro Cale = MA OriP-nfation WS 1 I 2C05 -Sep -1310:02:59 Pa.9e 1 & E Hf= --a t I ng Compu-jent Constructions Entire House Job! 1 Oate: Sep 13, 2005 13ym- Blair Singleton For; Travis Chapple Rexburg, Idaho Location: Idaho Fabs, 1D, US Elevation.- 4141 ft Latitude: 44 ° N Outdoor: Heating Dry bulb (°F) -s Daily range (°F) - V1fet bulb (°F) - V1Find speed (mph) 15.0 Cooling 89 34 ( H 60 7.5 Construction descripbons Walls 15B1 - - : B3sernent - 8 " concrete, wood framing, interior finish, R- cavity, no board insulation, ' 1 E- : Wood stud frame, siding or stucw, no board insulation, R-19 cavity insulation Partitions (none) Windows 61A, vinyl dear 1av+r e, clear low -e; iVFRC rated (SHGC=O..30) Doors 11 O: Metal door, fiberglasS GOre, with storm Ceilings 16B -38 -ad" Ceiling under vented t -1 , no radiant barrier, dark shinglesF R-38 insulation Floors 1 A - r~fd basement floor, N o inlfn} 3Z ode Indoor: Heating Cooling Indoor temperature (OF) 70 75 Design TD (°F) 76 14 Relative humidity (°/a) 50 50 Moisture difference (grilb) 61.5 -31.5 InfiltrationK } Method Simplified Construction quality Average Fireplaces Or Are U-value I n u1 I H HT1 w i HTM Gain e 32 ' 0 6.66 827 32.8 1051 e 296 0..049 13:O 3.72 1102 0.00 2495 488 0.049 13-0 172 1817 0,00 292 S 296 0.049 13,0 3.72 1102 0.00 0 W 488 0.049 13-0 -` 1817 0.00 2364 l 1568 .049 13.d 3.72 5839 0.00 0 300 0,068 19.0 1 550 0.64 192 e 423 0.068 19.0 5.17 21860.64 270 283 O068 19-0 .1 1488 0.64 184 406 0.068 19�0 5.172098 0,64 260 all 1417 0..068 19.0 5.17 7323 0.64 906 1 0.360 0.340 0.0 25.E 103 10.5 W 42 e 32 0-340 0 6.66 827 32.8 1051 e 76 10.340 0.0 25.8 1964 32.8 2495 1 -340 0'0 25.8 413 18.3 292 W 32 .340 0.0 25-8 827 32.8 1051 W 72 0.340 0-0 258 1860 32,8 2364 all 232 0.340 0.0. 25,8 5995 31.4 7294 1 0.360 0,0 27,E 575 6.66 140 W 42 0.360 0.0 27A 1149 6.66 280 all 63 0.360 -0 27-4 1 724 (3-66 420 1 748 0.026 38.0 1.98 3454 1-09 1909 1741 0.020 0.0 1-52 2646 0.00 `vvSift ht- Su �e Residential 6.0- 0 RSR40615 A M y Doc u rn entsWrig ht afk HVAC\C hap p [e Con structi on 1. rrp Cal c = M J8 O ri 2005 -Sep -1 10-.03,00 Page 1 1 BCarpeted floor over conditioneid space, i u ation Right -Suite Residential 6-0-02 R41 GAMY Document WrI ht oft H i happle Construction 1, rrp GaIc = MJ8 Orientation = ' 0.295 11.2 2005 -Sep -1 10:03:00 Page X J & D ReatingLLC dual I ty and CO f CT L Project.AB summary Entire House Job: 1 Date: Sep 13, 2005 Blair Singleton For.- Travis Chapple Rexburg, Idaho Notes: Weather: Idaho Falls, !D, U5 Winter assign Conditions Summer Design Conditions Outside db -6 OF Outside db 89 OF Inside db 70 OF inside db 75 °F Design TD 76 OF Design TD 14 OF I.aily range H Relative humidify 50 % Moisture difference -31 gr/lb Heating Summary, Sensible Cooling equipment Load Sizing Structure 31892 Stuff Structure 16906 Btuh Dints d efm Ducts Q Btuh Central vent (163 cfm} 11458 Btuh Central gent (163 cfm} 2111 B��� Humidif cation Q Btuh Blower a Btuh Piping 0 Btuh equipment load 43351 Btuh Use manufacturer's data n Rate#swing multiplier D.94 Infiltration Equipment sensible load 17875 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction qualfty Average Fireplaces 0 Structure 133� BtUh Ducts Q Btuh Heatin� Cooling Central vent (163 cfm) -2534 Btuh Volume (W) 3��$ X489 Equipment laten# ic�ad a Btuh Volume (ft) 1444 14744 Air changesfhour 02$ Q.15 Equipment total load 17875 Btuh Equiv. AUF (cfm) fig 37 Req. total capacity at 0.70 SHR 2.1 toy Heating Equipment Summary Cooling Equipment Summary Make AmStd fake AmStd Trade Freedom 90 Trade Standard Model AUC060C936B* Cond 2A7B20 16"k1 Eificiency9�1 �1F�lE Coll TXC036C4 . Heating Input �Eific�enc Heating output 56a�0 Btuh Sensible cSEER ooling �fi9�4 ���� B��hBtuh Temperature rise �6 F Latent cooling 7260 g�h Actual air flow 915 � cpm Total coaling 242t3Q �tu�t Air Actual air flow 915 cfm flow factor Q.0�9 cfml��uh Air flow factor 0.054 cfmlBtuh Static pressure Q. 1 0 in H20 Static pressure 0-10 in H2O Space thermostat Load sensible hetet ratio 1.40 Prinioist certified by ACOA to meet all requirements of Manual J 8th Ed. ft� ftRight-Suite Resident«l 6.0.02 RSR40615 `G _Hyl Y Doc; umen ISS 0 MOR HVAG, rL-',"h apple Constructiona I c Page 1 dP B Hea t -ing LLC AED A,Jess ent Entire House For: Travis Chapple Rexburg, Idaho Job 1 Date: Sep 13,2006 Blair Singleton ::. _,�. . ,.0 -. •:.. • _ tom• ... .: ., _�., _,�_.. ._.. � 9�a-.=.:iTd` _ - M vS�i�i Location: Idaho Falls., #D, US Elevatian: 4741 ft Latitude: 44°N outdoor: Heating Dry bulb (DF) -fi Daily range (,r,) _ IIIJet k]U1b (°F) Wind speed (mph) 15.0 Cooling 89 34 ( H sa 7.5 Indoor: Indoor temperature (°F) Design TD (OF) Relative humidity (%) Moisture differenGe (gr1lb) Infiltration: Method Construction quality Fireplaces Heating 70 76 50 61.5, Simplified Average 0 fn me* Hourly G lazingLoad TOC 5,OC 2.00 1.00 so T 1w %.e I %w I I ie.' I .> 14 -1 t) 16 17 18 19 20 Hour of Daly Avera e E [ i m t Max''�turr� ho�riy glazing lead ex�ee�ls a���age by Z�.4°l0. House has adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 0 Btuh Right-Suilte Residential 6.0-02 RSR40615 OCC ."My Docu enwwFig t oft H V' s%. ha p]e Construction 1.frp Calc = KAJ8 Orientationr Cooling 75 14 50 -31.5 2005 -Sep- 1 �03: 00 Page I it B Heating LIC Right Worksheet Entire House aw Job I Date: Sep 13, 2005 BYE Blair Singleton 1 Room name Entire Hous bed I Exposed ill 410.0 Ceiling height _ ft .0 natio ol Room dimensions 1.0 x 159.0 ft. 51 Room area 3489.O ft2 159.0 W Ty Construction -value Or HTM Area Load Area number to i -0F) or perimeter (duh) orrr e -t r Btu Heat Cool G r Heat cool GrpNIPIS Heat Cool w 158 1 -Owc .093 n 3.72 0,241 296 296 1102 0 0 ` r4 304 300 1550 19-2 120 120 620 7 . 1 A 034025.8 10.46 4 1 15613-0?,we-8 0.093 e 3.72 0.24 520 488 1817 11 61A OY340 a 25.84 'r -G 12E-Osw 0.068 a 5.17 0.64 520 2186 270. 0 0 0 61 A 0.340 e 25.84 32M 76 0, 1964 2495 0 0 0 11KO 0.360 .e 27..36 6.66 21 21 575 1 ' 11 3-0v-v.r,-8 0.093 s 3.720.24 - 296 . 1102 0 0 0 0 Y -G 12E 5.17 0.64 304 288 1488 184 16 16 83 1 .61A 0.340 s 25.84 18.26 16' 0 413 292. 0 0 0 t -G, 61A 0.340 w 2584 32M 15B I 3-Owc-3 OM33--3O3,72 0.24 520 488 181 1 0. 32 0 827 1051 0 0 12E-Osw 0.068 w 5.17 0.64 5201, 406 2098 260 88 68 351 4 1 0. r 25.84 32.83 72 0 1 860 2364 20 0 517 657 - 11K0 0.360 w 27.36 6.66 42 42 1 149 280 1 -ad 0.026 - 1.98 1.09 1748, 1 748 3454 1909 159 159 314174 F 1 - MO 1.52 0.00 1741 204 2646 0 0 0 0 0 1 B 0.295 - 11.21 0,00 7 1 78, 0 0 0` 0 AED excursion 0 Envelope lass/ill 7060 10529 1 885 1129 12 a) Infiltration b Room ventilation 4833 477 657 65 0 13 Internal gams; Occupants 0 230 10 2300 230 Appliances 1200 30036: � Less extet-nal load d Less transfer 0 0 0 Redistribution 0 O F 0 14 Subtotal 1 892 1 6906 542 1423 � 1 Duct far#0% 0% 0 0 � � % 0 Total room load X1892 16906 254 1423. Air required � 1 915 73 7 Printout rti bY .CCA to asst all requirements -Now r-111cl 1-1 �ts�c> Right -Suite Residential 6,0.02 R3R40615 _ lMycument ' Afri t ft H'VAC--, haPP1e Construction 1.frp Calc = IJ8nentation. L -Sep -13 10-03:00 J & B Hea t 1 ng 11 Right Worksheet Entire House Date: Sep 13, 2006 f fr Singletcin 1 Room name bed Exposed wall 30.0 ft 18.0 ft Coilingric ht .0 ft &0 ft heat/oo l 4 Hoorn dimensions 11. x 17.0 1- 168. ft Room area 187.0 z 168.0 f Ty Construction -valuer HTM Area Load Area . Lo ad number t h e -'F) (Btuhms or perimeter(ft) to r perimeter t(Btuh) Heat I r Heat Cool Gross N/P/S N//SHeal Cool 1 E1 -ow - . n 3.72 0.24 1361 136' 506 0 0 1. E- sw 0.068 n 5.17 0.64 0 0 0 0 0 0 61.E 0.340 n 25.84. 10- 15B1 3-avvc-8 0.093 e 3.72 0.24 0 0 0 0 0 0 1161A 0.340 . 'L9 12E-Osw 0.068 e 5.17 0.64 0 0 0 0 0 0 0 61A 0.340 e 25.84 32.80 1 I ,� . 6.66 0 i -V�r,- 0.093 3.72 0.24 1 16 60 0 48 48 179 Wj 12E-Osw 0.068' S 5.17 0.64 0 0 0 L -G 0 0 61A 0.340 S 25.84 18.26 0, 0 T-0 1 - - 0.093 w .7 0.24 8 1 2�8 01 96 so 298 1 A 0.340 w 25.E 32.8. 1 1 � 1 0 1 525 12E-- � -068 � 1 0.64 . 0 1A 0-:340 w 25.E 32.82 0 0 0 0 0 11KO 0.360 w 27.36 6.66 E 1 0.020 1.52 0.00 187 30 284 0 168 1 255 F 91 B 0.295 - 11.21 0. GO 0 0 0 0 0 E D excursion 1 163 Envelope loss/gain -1532 688 12. a Infiltration iir I i 1145, 688 b Doom ventilation 0 0 0 a 0 13 Internal gain: Occupants 230 Appliances@ 1200 23 � Loss external load Less transfer 0 0 Redistribution 14. Subtotal 53239 0 1 Duct loads 1585 1 1384 918 Total room load A i r r g W red fm 1585 918 1384 918 45 50 40 50 1 Printout cerdfied by ACOA to meet all requirements U.0.02 RSR40615 '\ cu t Wright*oft �-�-VAC'-, 1� 1Construction.. i_ 4 - 10:03-00 EA J D Heat I nq 11 Right . Worksheet Entire House Job: I Date: Sep 1., 2006 Blair- Singleton Exposed wall 4, Room dimenzions 0 ft Room area 20.0 20 X 1.0 224.0 ft 224.0 ft2 TConstructon -valga r T Area �t (13tuh) or perimeter (ft) (Bfuh) Heat Cool Gross SIS deet Cook Gross N/Pis Heat Cool -- 0,093 n 3.72 0,24 ' 119 0 128 477 VIV 12E-Osw 0,063 u 5.17 0.64 0 ID 0 0 0 0 0 G L -G 61A 0.340 n 25..84 10.46 VC 1561 - _wc- 0.093 3.72 0.24 1 328 1 0.340 e 2584 32.83 0 16 0 525 12E-0svq 0,068 e 5,17 0.64 0 0 0 0. 0 0a. 0 61A 0.340 e 25-84 32.83 0 0 0 0 00 0 11 KO 0.360 e 27.36 6966 0 0 0 0 0 0 0 0 W 15613-Owr,-8 0.093 s 3.720.24 0 0 0 0 0. , 0 1 -Oso+ 0.068 .17 0,64 1 1 0.340 'f --G 61A 0.340 Y4 25184 52.83 0 0 12E-0sw 0.068 w 5.1.7 0.64 0 0 0 0 0 0 0 0 61A 0.340 w 25.8 12,11.83 00 0 1 27.36 6.66 0 16B-38ad 0.026 - 1.98 1.09 0 0 0 0 0 0. 00 F 21A -32c 0,020 1.52 0.00 20 4 30 0 224 29. 3A0 1 B 0.295 - 11.1 0.00 0 0 0 ED excursion Envelope loss/gain 1 0 1558 505 1 Infiltration Room ventilation 0, .0 0 0 0 13 Internal gains. occupants a 230 0 230 Less external icad Appliances 1200 1 0 0 0 Less transfer 0 0 0 0 14 subtotal -150 0, 149 0 15 Cut loafs01 0. 1 708 735 % , D%0 01 0% 00/0 Total room load Air required Wrn 0 0 1708- 735 0i 49 40 Print Ut Gerhfied by ACOA to meet all requirements of r l.j 8th Fd6 i t, ulte Residential6,0102 15 .�.MY o Linie �t % r ht o H Chapple Construction 1 _rrp Cain = rvjtj Orientation =� fir"..,` 2005 -,hep -1 10-03.00 Page J B Heating ILC n. -J L a Ri &`,.,a- Af r s eet Job: I a Entire House Date: Sep 13, 2006 Blair Slnqfeton Room name 2 Exposed wall mechJstorage storage 3 Coiling hoight 2 1.0 -R 310 ft 4 .0 Room dimensions 8ft heat/cool 8.0 ft beat/cool 5 Room area 165.0 W 1.0 X 165.0 ft 100. 0 ft2 10.0 X 10,0 ft Ty Construction U -value Or HTM Area (W) Load Area (ft� Load number (5tuh/ft:z--QF)' (Btub/ft2-) or perimeter (ft) (duh) or perimeter (ft) (Btuh) Heat N Cool N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 15813-Owc-8 0,093 n 3.72 0.24 .0 1"WL -G I 12E-Osw 0.068 n 5.17 0.64 0' 0 0 0 6-1A 0-340 n 25.84 10.4.6 0 0 0 0 0 0 0 0 VL15B13-Owc-8 0.093 e 172 O.24 0 0 0 0 80 80 298 0 61A 0.340. e 25,84 32.83 0 0 0 0 0 0 0 0 12E-Osw Or.068 e 5.17 M4 0 0 0 0 0 01 .0 0 .61A 0.340 e 25.84 32.83 0, 0.1 0 0' 0 0 11KO 0,360 e 27.36 6.66 0 0 01 00 0 w 15B 1 3 -WC_ 8 C, 0 0.093 s 1.72 0.24 48 48 179 0 80 80 8 0 12E-Osw 0.068; S 5A 7 0.64 0 0 0 0 0 0 0 0 t-0 61A 0.340 s 25.84 18.26 0. 0 0 0 0 0 0 0 15513 - Owe- 8 0.093 w ^ 3.72 0.24 120 120 447 .0 so 80 298 0' Y -G 61A 0.340 w 2-5.84 3233 UE-0sw 0.068 f 5.17, 0,64, 0 0 0 0 0 1A 0.340 32 0 6 0 w 25.,S4 -83 0 0 0 0 0 0 0 0 6^ 11KO O�360 w 27-36 S.0' 0 0 0 1613-38ad 0.026 - -98 1.00 0 0 0 0 . F 21A -32c 0.020 - 1.54. 0.00 165 21 251 100' 30 152 F 91 B 0.296 - 11.21 0.0'0 6 c) AEC) excursion Envelope lo:ss/gain 876 0 1046 0 12 a) Infil-tration b) ROOm ventilation 0 0 0 0 0 0 13 Internal gains: OGcupantz @ 230 01 0 Applfanioe5 9 1200 01 0 Less e)der nal load 0 0 0 Less transfer 0 0 0 0 Redistribution 0 01 01 01 14 Subtotal 876 0 -1046. 0 15 Duct loads 0 0 0 0 1 % 0% 01 0 01/6 0% 0 0 Total room load 1 L fir required required Wm)0 0 01 01 G 0 0 Printourt certi-fied by ACOA to meet all Right -Suite Residential 6.0,02 R3R40615 C `iLkly D-ocumentsWrightsoft HVAG\Chapple Construction I. rr ajo t= Mj requirements of Manual J 8th Ed. Orientafion 2005--Sep-13 lam-oo Page 4 J & B Heating LLC �F Right Worksheet Job- I w EntireHo Date: Sep 13,, 2005 t fr Singleton 1 Room name Exposed SII stairs 67.0 0.0 ft Coiling height 8.0 ft heat/cool 8.0 ft heat/cooi 4 Room dimensions jO x 747.0 ft 5 Room area .., fi#ao . TY Construction U -value r HTM FArea 2 number tah/W O�Load Btuh/ perimeter(Btuh)� im t(Btuh) Heat Cool Gross NIS Heat Coo i rosy IPI feat Coo 1.1���- W. 12E-Osw 0.068 n S. 1r 7 0.64 0 VE_G 15 BI Ower- 0+093 e 3.72 0.24 296 280 1043 0 1'2E-Osw 0.068 e 5.17 o. 0 6.1r 0 32.83 0 Q. 104 104 387 0.340 s 25:84 8.26 T—G 61A - 0.093 f 3.72 024 136 136 506 0 0.340 w 258 0 �- 0 t1E-O,� . 2 I IWO .340 vv 25,8 32 83 0 a 0 F 918 0.020 1 P52 0.00'747 67 '1135. 1 0.295 - 11.21 0,00 0 0a AED excursion -0 0. Envelope less/gain 3485 505 61 1 Infiltration Room ventil=ation 0 13 Internal gains: Occupants a 230 1 230 0 Appliances (0 1200 Less external i o Less transfer 0 0 � edist�ution o 14 Subtotal 1818 010 0 1 1 Duct loads 5303 735 0. Total room load Air required f)303 735 1 4 0 Printout ceftified by ACCA to meet all requirements of Manual J 8th Ed. Construction 1. r p Calc � Nija Orientation 2005 -Sep -13 10,03-0() Page 02. J & B Hwa t ing ILC Rio Right-_ Worksheet Entire House Job& I Date: Sep 13, 2006 Blair Singleton 1: Room name bath 2 c1st. 3 Exposed ll' �0 ft 3 Ceiling height 8.0 ft heat/cool &0 ft 5.0 heat/Goo; 4 Room dimensions 5.0 11.0 ft 5.0 x 7.0 ft .51 Room area 55,0 ff2 35.0 ft2 Ty Construct -ion -value Or HTM Area- t Load Area (ff2) L oad number IRuh/ftZ-*F)' Btuh/W or perimeter (ft) (Btuh or Peri mter t h Meat cool Gross NIPIS Heat i G ross NIPHeat Cool w 15B13-Qwc-8 0.0933.72 0.24 0 0 0 0 0 0 0 Y -G 12E-0zs-nwv 0.068 n 5.17 0.64 0 0 0 0 D 61A 0.340. n 25,8 10.46 0 0 0 0 0 0 0 T -G 15B1 -Ow-- 0.093 • e 3.72 0,24 61A 0.340 e 1 25,84. 32.83 0 01 0z 0 0 0 0 VLZ 12E-Osw 0.068 e 5.17 0,64 0. 0 0 0 0 0 0 0 61A 0.340 e 25.84 32.83 0 0 0 0 0 0 0 0 0.360 e 2T36 6.66 0 0 0 0, 0 w 15B I -Over,- 0.093 S 3.72 0.24 0 0. 0 0 0 0 0 ' ' 12E -0S%' 0.068 S 5.170.64 0 0 0 01a 0 0 0 IG 61A 0.34 2 15B13-owc-8 0.093 w 3.72 024 0' 0 0 0 0 0 0 61A 0.340 25.84 32.83 ' 12E-Osw O068 w 5.17 0.64 0 0 61A 0 . 340 w 25.84 32.83 0 0 0 0 0 0 11 -360 w 27.36 6.66 0 0 0 0 0 0 0 0 1 6B-38ad 0.026 - 1-98 1,09. 0,0 0 0 0 F 1- 0.020 1.52. 0.00 55 0 8 F 91B 0.295 - 11.21 0.00 0. 0 0 01 0 R excursion 0. Envelope loss/gain 4 0 202 0 1 a Infiltration b) Room ve- nt Hat ion 0 0 1 fnt r al gains: Occupants 0- 230 Appliances (M 1200 0 0 0 Less extern -al load 0 0 0 Liss transfer 0 Redistribution 0 0 0 .14 Subtotal 75 0 -2G2 0 15 Duct Iod 0 Tot ai l room load Air req u j red 159 0 0 0 0 Printout certified by ACCA to meet all requirements Marnual i 8th Ed. .Res-irifil-6.0.02 015 2C-0513 10,03-00 ���.� Docunient '�_'� frightso � p1e -On tr of on .1_rr a.1c = Mja Orientation _' ` -Sep-Page J & B Hwa t i ng LLQ,.. V a n d t _ o p'X'j, i L' r rRight Worksheet - Entiare House Date: Sep 13, 2005 Blair Singleton 1 Rooms name bed 2 Room-3 2 Exposed wall 16.0 ft Roomdimensions1,0 1 Room area 131.0 ft2 42.0 ft TY Construction U-value orHTM Area (w) Loadnumber toel _�I- (u1 or metes Perimeter (ft) (Btuh) Cool Gr/1 t I 1 Heat Coo W 1 1 -0w_, 0.093 n 3,72 0,24 1 E- .1 7 00 36 _G 61A,64 4 1 -Ow- a 0.24 186 23 0 'I .0.340 25, 2. 0 0.068 e 5.17 0. 1 O.340 25.84 32.83 0 1 1 O 0.360 e 27.36 6.66 12E-Osw 0 068 r 0.340 25.84 18-26 T�G 15613-Owe-8 -093 w 3-72': 0.24 0 0 0.340 w 25.8 32.83 0 0 �12�-O 0.068 .1 0.64 0 � 0 61A 0.340 w 25.84 32-83 20 0 517657 11KO 0.360 w 27.36 6.66 16B-38ad 0..026 1.98 1.09 131 131 259 143 42 83 46. F 1-2 0,020 - 1,52 0.00 2 c ED excursion 182 14 Envelope nvelop loss/gain 1334 1050 372 97 12 a Infiltration _ b Froom ventilation 375 7 117 12 1 Internal gains, Occupants (LD 230 1 Appliances 1200 230 M Less external load Less transfer 0 0 0 0 14 Subtotal 15 Duct loads 1709 1317 490 108 % 0 0 0% % 0 0 TTial room Jo .d Air required f 1 709 1317 490 49 7 1108 14 Printout certified CC to meet all requirements 471 Atn;<>-IF- Right-suite Re:sjaentlaf 6.0.02 RSR40615 HVAC}Chappjonstruction I -ITP talc Tr ntatio r = lvv 2005-Sep-1 10:03-0o Fags 7 J & B HeatIrig LLC �e ani Right _Worksheet .Entire House w Job: I Date: Sep 13,2005 By-, Blair Singleton I Room name ased 21 Exposed wall m. bIGist. 30. 0 ft 3 Coiling he ht 8.0 ft heaticool 0.0 ft 4 Room dimensions 1.0 x 225.0 ft 8.0 ft heat/cool 5 Room area 5.0 x 2.0 ft 225. 0 fF 10.0 ft" Ty Construction U -value Or FITM Area (ft2) Load Area (ft2) Load number (Bt u h W -,a F) (BtuhV) or perimeter (ft) (Btuh) or perm .eter (ft) (13tuh) Heat Cool Grote NJPIS Heat Cool Gross NIPIS Heat Cool 6 W 15B I 3-Owc-a 0.093 n 3.72 0,24 12E-Osw 0,068 5.17 0.64 136 1 1" 703' 87 0 0 0 0 T --G 61A O.340 n 25.84 10.46 0 0 0 0 0 0 0 0 15813-0wc-8 0.093 e 372: 0.24 0 0 0 0 0 0 0 0 61A 0,340 e 25.84 32.83 0 0. 0 0 0' 0 0 0 VL:z12E-Gsw 0.068 e 5. 117 0.64 104 79 408 50 0 0 0 0 61A 0.340 e 25-84 32,83 25 0 645. 821 1KO 0.360 e 27.36 &66 w 15E313-0wc-S 0.093 S 3.72 0.24 01 0 0 0 0 0 0 0 W, 12E-Osw 0-ID68 s 5.17 0. 64 0 0 0 0, 0 0 0 0 61A 0-:340, s 25.84 18.26 M93 w 3.72 O24 0 0 0 0 0 0 0 t -G 61A -0 340 w 25.84 32.83 0 0 0 0 0 0 0 0' 12E-Osw- 0.068. w 5. 17 0-64 0 0 0 0 0 0 0 0 61A 0.340 w 26.84, 32,83 0 0 0 0 0 0 0 0 11KO 0.360 w 27.36 6.66 0 0 0 0 0 0 0 0 C 16B-38ad M26 1-98 1.09, 225 225 445 246 10 io 20 1 F 21A -32c O�020 1.52 0.00 0. 0 0 0 0 0 0 0 F 91B 0.295 11.21 0.00 0 0 0 0 0 0 0 0 AED excursion P -CA Envelope loss/gain 2220-22 1109 20 10 .............. 12 a) infiltration 704 b) 69 Room ventilation 0' 0 0 0 0 13 Internal gains: 0GOUpantS @ 230 2 460' 0 Appliances g 1200 01 1 11 Less external load 0 0. 01 0 Less transfer 0 0 0 Redistribution 0 0 0 14 Subtotal 3 2 -20 -10 15- Duct loads 2909 1640 0 0 0- 0 Total room load L I Air required (ofm) 2909 1640 0 0 83 89 0 Printout certified by ACCA to meet all requirements of Manual J 8th Ed. g� Right -Suite Residential &0.02 RSR40615 CAMy Dccunients�kjftghtsoft HIJAMChapple ConstructIOn I r]rP Calc kUS Orientation = vv 2005 -Sep -13 10-0,3.00 Page a Rights, N Job: 1 Entire House Date: Sep 13, 2005 8 y 0-1 Blair Singleton I Froom name stairs living Exposed wall 110 ft 1. 0 ft Ceiling height 4 Room dimensions 4-0 x 1..o ft 1.0 126,0 ft 5 om� area 40.0. W 126.0 ft2 Ty Construction -value Or HTIVI Area(ft2)20Load Area Load o � h C rimeter Heat C001 Gross N/P/S Het Cool 0 ro N/P/ Heat Cool W 1 5613-Owc-6 0,093 3.72 0,24 1 -Or0.0:68 n 1 61A 0.340 n 25.E 11. , VL_G 15.B13-0wc-8 0,093 e 3.72 0.24 0 0 0 61A 0.340 e 25..84. 32.83 1 -Osw 0.068 517 0. 6 0 0 0 1 0.340 25,84 32.83 0, 0 F 27.36 6.65 15B13-0wc-8 0.093 S 3.72.: 0 W, 1 E-- 0.068 ` .17 0 0 56, 56 289 36 18,26, :VL 15813-Owc-,B M,93 w 3.72 ..4 0 0 61A 0.340 w 25.8 32,83 0 12E-Os12E-Osw 0.068 w .17 0.64 0 0 0 0 88 63 326 40 61A 0.340 r 25.84 32.83 0 11KO 0.360 w 27.36 6.66 0 0 0 168-38ad 0.025 1.98 1.09 40 40 79 44 126 126 249 38 E 1- 0.020 1.52 0.00 1 91B 0.2951 11.21 0.00 0 0 AED excursion _ 239 , . v Envelope loss/gain 7] 1 1630 1 1 � � ir�fi�trti�� � _ b Room venWation 0 446 4 0 13 Internal gains. Occupants q'D 220 0. Less external load Appliances 1200 0 0 230. 0 0 Less transfer 0 0 0 0 Redistribution a 0 0 0 14 Subtotal - -39 0 0 15 Duct loads 0 0 2076 1553 0% % 0 0 0% % 01 0 OW MOM load Air required m 206 1 553 0 0 60 84 Printout certified b ACOA to meet all requirements of Manual J 8th F d w 0.0,02 R5R4W15 CAMY DOCUMent '�%Alr ht aft HVAC\Chappleonstru tion I.Frp calc - .Nlj 2005 -Sep- 13 10 - 0 : 0 page J 6& B Heat. I -rig ILC ity and C0M+'-rt AW! Right-., Worksheet Entire House Job: 1 Date: Sep 1, 2005 Blair Singleton I Room name family Exposed wall kitchen/dining 3 Ceiling height 47.0 ft � it 22O -ft hheat/cool0 x 412,0 ft .� t i�t��� Room dimensions 1 .. 51 Room area 412.0 ft2 391.0 ftp Ty Construction -value 0 r HTM '` Area *� tU 2 or perimeter ft 13uh or perimeter ftLoad stud Heat Cool Gross NIPIS Heat Cool Gross 1/PIS Heat Cool w 12E-Os12E-Osw 0.068 n 5.17 Vii.. L -G 61A 0.340 25.E 10.46 0 0 0 15S13-0wC,8 0.093 3.72 0.24 0.340 25,84 32,83 0 0 0 0 0 0 WE2 -A 0.068 5.17 Q.,64 1 1 0 532 1 36 66 1 0.340 25.84 32.83 . 0 � _ 110.360 e31027,36 6.66 0 0 0 0 21 21 575 140 Y_._� 12E-Osw 0.063 S 5.170.54 0 0 0. 0 104 104 537 66 61A 0.340 s 25.84 18,26 0 0 t—G 61A 3.72 0.24 0 0 0 0.340 25.84 32.83 0 0 12E-0sw 0.068A s 103 1 1,15 594 4 I WO 1 230, 0 Q C 168-38ad 0,360 w 27.36 6,66 21 21 575 140 21 21. 575 140 0.026 1.98 1.09 412 412 814 450 3.91' 391 773 427 F -c 0-020- F 91 E3 0.295 11.21 0.00 . - - c) AED excursion 388 FT Env to loss/gain 2851 14893896 918 1 Infiltration 516, 51 b) Room ventilation 1103 109 0 0 0. 13 Internal a€n = Occupants g 230 Appliances 0 1,200 0 0 Less ext mal load 0 2, 2400 Less transfer 0 0 Redistribution 0. 0 0 14 Subtotal 51 25 0 0 15 Duct loads 3413 1 795 4998 3427 0 0% 010 0 Total room load Air required fm 3418, 1795 4998 3427 98'1 97'1 143 1851 PriLntoLd certffied byACOA to meet all requirements CAMY DoctimentsWrightsoft HVAC" Chapple Construction I.rr 2005 -Sep -13 10.03:00 F B Heat I g 11 iL -*�N Right. _ Worksheet Entire House RO ,iib: Date: Sep 13, 2005 Stair imaton 1 Room name unlit 21 Exposed SII �� ��h X0,0 ft 9.0 ft Room dimensions 5. Room area 100.0 ft2 72.0 ft T7Construction -valga Or HTM Area (W) Load Aire- a- (ft2) Load number (Muhl -W -T) BtUh or perimeter t h or pedmeter (ft) btu Heat Cool Gross NIPIS Heat Cool Grass N/PIS Heat Cool 15813-Owc-8 0.093 n 3.72 0.24 VIV 1212-- w 0.068 n 5.17 0.64 0 0 0 0 0 01 L�G 1 0.340 n 25.84 f 15131 -0 O�093 e 3,72 0.24 0 0 0 0 61A 0.340 e 0 0 0 T=Z1 -Or O068 e 5.17 0.,64 80. so 413 51 72 58 300 37 61A 0.340 e 25.84 32.83 O 14 0 362 460 - 11 KO 0,360, e 27.36 6.68 0 0 0 0 0 W 1551 3-OWC-8 0.093 S 3.72 0,24 0 12E-Gsw 0,068 S 5-.17 0.64 80 64 3311 0.340 25.84 18.26 1 413 292 - 0.0093 W 3.72O�24 0 1Oa340 w 25.84 3Z83 0 0 01 0 WEI::2 12E -05w 0, 06 5.17 0.64 80, 80 1 1 1 0.340 . 3183 0 0 0 0 0 0 0 11 .360 w 2T36 6.66 0 0. 0 C 168-38ad U26 - 1-98 1 09 100 100 198 109 72 72 1,42 '79 F 1 0.29 - 11.21 OM 0 0 0 ED excursion - -125 -1 Envelope loss/gain 1769 418 804 565 1 Infiltration 04 b Room ventilation � � 11 21 0 io 13 Irtrr; Occupants @ 230 Appliances @ 12001 0 0 Less temalload 1200 Less transfer Redistribution 0 14 htotal 0, 0 12 6 .15. Duct loads 2472 1688 1027 592 % 01/0 0 0 0% 0% Total roam load Air required of 2472 1 688 1 027 592 - 1 91 29 32 Printout certified by ACCA t meet all r _ � nof Manual J 8th Ed. Rtgru-�ivae Residential 6,0.02 RSR4.0615 'C'W�������.��� tea � `� �� H V Chapple Con tru ton 1 _rip aiG � j rientatton = - �-�! �f :� :0 j B Heating LLC Right _ Worksheet Entire House Job: 1 Vie: Sep 13, 2005 Blair Singleton I Room name Exposed wall 0.0 ft Coiling height,0 ftheat/cool Doom dimensions 1) X &D ft Room area 40.0 ft2 Ty Construction -valuer HTM Area P Load Area Load number(Stu hJft-(Stuhift)or Perimeter E uh or perimeter Heat Cool Grote N/PIS Heat Coal Gross NIPIS Heat Cool W 15B13-0wc-8 0..093 3.72' Q�24 0 . � 1 E- . 06.8 ,1 . 0 . E 1 A 0.340 r 25.8 10.46. s 5 B 13 -Do - 8 0.0,93 a 1 6 IA. 0.340 e 25.84132.83 0 0 0,340 a 25.84 32.83 0 0 0 II KO 0.360 e 27.36 6.56 0 0 0 ,- w 1 1 -0,w -8 0.093 S 3.72 0.24 0 0, 0 11) t—G 1L -w 5.17 0.64 0 0 01 0. 61A 0.340 s 25.84 18.26 1615AB 13 -0wG- .7 0.24 --G {0.093 NJV 1 E- sw 0.068 w 5117 0,64 0 0 0 61A 0.340 2S.84 32.83 11KO 0.360 w 2'_3.6 6.66' 0 E � - 1, 98 1.09 40 44.+ 79 44 1= 21A -32c, 0.020 1.52 0,00 k.+ 0 0 0 F O.295 11.21 0.00 Envelope lossigain 12 a Infiltration b Froom ventilation 0 1 Internal gains: Occupants g 230 Less external load Appliances 1200 01 0 0 Less transfer 0 0 Redistribution 0 15 Duct loads 112. 55 0% % 0 Total room foad Air required cfm � �l553 31 AC Printout cer-fified by ACOA to meet all requirements f Right-3ulte Residential 6-0-02 4 1 C.AMY DocunientsMrightsoft HVAMChapple ConStruction i srp i jj r ntation Manual J 8th Ed. 2005 -Sep -13 10-03:00 Page 1 i and Ck-JI-O[crt Duct System Summary Entire House Job; I Dates Sep 13,, 2005 BY: 19fair Singleton Far: Travis Chapple Rexburg, Idaho Eternal static pressure Pressure losses Available static pressure Supply 1 return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0.14 in H20 0.00 in H20 0.10 in H20 0.04/0.06 in H20 0.015 in1100ft 915 cfm Cftn Cooling 0.14 in HBO 0.00 in Hca 0.10 in H20 0.04/0.06 in H20 0.01 5 in/1 OOft 915 Cftn Name DeDesign Nig Clg Design Dram Rect Duct Actual Ftg.Eqv (Btuh) (Cfm) (Cfm) FR (in} Size (in) Ma#i Ln (ftp Ln (fit) Trunk ped I C 1423 73 77 0.D17 6 Qac Q VIFX 51-0 180.0 Std ped 4 C 918 45 50 0-01 7' fi Ox Q VIFx bed 190.0 s#1 �a 5 c 918 40 54 0.415 6 OXO MFx 35.0 X25.0 st1 bid 3 h 'i 708 49 40 4,Q 1 5 6 Ox 0 \AFx 48.0 200.0 std family 2-A family 2 h 2652652 7fi 2f} O.Q1 S s Ox 0 V[Fx 26.0 200.0 st2 bath 2 �3 ���2 76 20 0.016 6 0� 0 VlF)C 28_0 225_0 St "� bed 2 i�i 159 5 0 0.01 6 6 OX 0 �1%lFX 25.0 22�J" .Q Stj Ro��3 C 1317 49,71 0.016 6 OxD ���}C 39.0 215.0� 5rias. bed h490 � �so.a�s s o� o V1Fx131.0 210.0 5tj ,;v:n� C � 640 $3 $9 0.000:0 Ox 0 VIF�c 0.0 0.0 farnify c 1 553 60 84 0.017 s ox a vlFx 15-0 225.o sty h 34,181 9$ 97 0.016 fi OX 0 ViF�C 25.0 225.q st�l kitchen/dining c 9713 72 93 (s.Q1 $ fi 4x 0 VIFx 27.0 190.0 �#2 kitcheNdining-A C 1713, 72 93 �,�1 � utility 6 Ox � VJFX 7.0 210.0 St2 rr�as. bath G ��9� 291 3� �-Q2$ G Dx 0 VlFx 24.0 120.0 st2 0.015 fi Ox 0 VIFX 32.(1 225.f} st1 �,�5 cyst. h 1121 3 3 O.D7 fi fi �c Q VlFx ��.� 225.Q std VV'V1ghtSC)ft Right -Suite Residential 6-0.02 RSR40615 C-Ahly Documents'WrightsoftHVAGI.Chapple � n tru ton I _rrp Calc = Mj8 n'ntation 2005 -Sep --1 10,03,1 I VV]rlgnrL -SC`}Jrt Right -Suite Residential 6-0.02 RSR40615 ALA,Ak CAMY Documents-Wrightsoft HVAO.Chapple Construction 1 -rrp Calc = MJ8 orientation = w 2005 -Sep -1 10 03:1 pnoct, 2