Loading...
HomeMy WebLinkAboutBudget in Brief Presentation (2)Presented by: Matt Nielson, City of Rexburg, mattn@rexburg.org 2022 Budget in Brief 1 Highlights 2 Total Budget: $84,497,500 up $4,541,600 Operating Budget is $33,789,000 General Fund $180,000 in Contingency for unforeseen items Revenue available for Street maintenance, reconstruction, and new construction totals $9,737,200 and includes: an additional $163,700 from power franchise fees shifted from the general fund (Total Shift of $483,000/year from 2018-2022) $2.3 million from the Urban Renewal Agency contributions $3 million from fund balance carryover $.59 million from state grants and developer contributed assets $3.7 million from taxes and fees $.21 million from impact fees City property tax levy rate is at $377 per $100,000 of taxable value Highlights 3 Will begin to construct a fiber ring to connect city assets Funding from the American Rescue Plan Act (ARPA) Four new full-time positions in budget Water Wastewater Police Patrol (Planning to reduce down 1 position w/o hospital contract) GIS (Returns them to same FTE level from few years Plan to replace/increase capacity on a new sewer line in the North West side of the City ($4 Million) Utility Rate Changes Effective 10/1/21 4 •Utility rates increased in October 2021 Major Street Construction Projects 5 Major street projects (Sources): Reconstruction of Chad, Angela, Melanie, Marianne Drive (LID 51) Traffic Signal Upgrade-7th S/Yellowstone (URA) ROW (URA)/New Road (DIF) 2nd W to Sunrise New Roundabout/RR Crossing Upgrade-Pioneer/7th S (URA) Move Signal/Buy ROW 2 E/600 N New Signal-University and 12th West intersection Major Construction Projects 6 Water facilities:Finalize upgrade in 2022 and finalize final DEQ loan amount by paying down some of the liability up front Wastewater line for North West side of city: contributions are still being determined and will include claw back fees to be paid by future development and contributions from other cities that use that infrastructure as well ($4 Million) Water storage building ($500,000) Well 1/6 & North Well/Res #2/#3 Improvements ($560,000) Street light projects ($500,000) Airport Environmental Study: funded by State & Federal Grants and reserves ($200,000) Continued Park Development/Acquisition: $385,000 in budget for park near Barney Dairy Road Tabernacle Restoration: funded by a general fund transfer. Restore Towers/Windows ($40,000)/Masonry Repointing ($95,000) Total Expense Budget 7 Total Revenue Budget 8 General Fund Budget 20.78 Million 9 Debt Service 10 No General Obligation Bonds December of 2010-City sold $10 million in Sewer Revenue Bonds Privately placed bond in May 2020 New rate reduced from average 3.2% interest rate to 1.15% Saved Sewer fund over $309,000 4 year term remaining Current Balance owed is $3,115,000 2022 DEQ Loan finalization for water upgrades Up to 2.21 Million in Principal Foregiveness 1.75% Interest Up to 30 year term Will be able to pay down $8.9 million liability significantly Population-Updated w/2020 Census 11 Property Taxes 12 •Statewide Summary from Associated Taxpayers of Idaho 2019 •2021 document not available yet •2020 included GPSI one time factors Property Taxes 13 Property Tax Levy ($5.87 Million) 14 City Property and Sales Tax Revenue 15 Where to Find More Budget Information 16 Utility Newsletter Will insert a link to website w/brief writeup in the January bill City Hall Finance Department Rexburg City Website https://www.rexburg.org/finance/page/budget-reports