HomeMy WebLinkAboutRESCHECK - 05-00316 - 601 Harvest Dr - New SFRMEScheck Compliance Certificate
2000 IECC
RES check Software 'Version 3_6 release 2
Data filename. C:\ProDum Ffles\Check\RE,-3Ct1eC, OACH.rek
PROJECT IT : Roach
CITY-- Rexburg
SATE: Idaho
HDD: 8b9�
CC)NTSTRL'CTI4N TYPE: Single Family
wIvaow / WALL RATIO: 0_20
BATE: 12/01/05
DATE OF PLANS: $-5-5
PROJECT DESCRIPTION:
Harvest Heights
601 Harvest Dr.
COMPLIANCE; Passes
Maximum UA. = 436
Your Home UA = 356
18-3'% B Than Code (UA)
Ceiling L Flat Ceiling -or Scissor Tress
Wall 1: Wood Frame, 15" o.c.
Window 2 : Vinyl Frame -.Double P ane with Low -E
Door 2: Glass
Door : Soli.
Basement Wall 1 : Solid Concrete or Masora
Wall height.: 8.01
Depth below grafi.: 7.0'
Insulation depth.: 8.01
Window 1: Vinyl Frir-mie.-Doubie Rane with
Door '1: Glass
Floor 1: All -Wood Joi t Truns:Over Unconditioned
u 1: Forced Hot Air, 94 AFU
Air ConditionerI.- Electric Central.Air 10 SEER
b01
Gross
Area or
OS 003'16
Harvest, Dr - Roach
Checked By/Date
SEC 4 , 2005 LII;!
By
Glazing
Cavity Cont.or Door
Perimeter R-Yatue, L -Value U-Fa.ctar 3A
1947
0.0
45.0
41
1654
21.0
0.0
82
1170
a.340
58
30
x.340
10
18
0.3411
6
� 654
1 I .0
Q.0
94
85
0.340
29
84
0.340
29
300
0.0
38.0
7
COMPLIANCE STATEMENT.- The proposed building design describod dere is consistent with the building pans,
spe�fications, and other calculations submitted with the permit application. The proposed budding has been designed to
WL -
r
.r,
meet the 2000 IECC requiTements in
mandatory rements l�sted requI+ in the
Builder/Designer
REScheck Version 3.6 Release 2 (formerly
��eck IIsPectiara Checklist.
MECcheck) and to comply with the
Date
W3
ri
RELSeheck Inspection Checklist
2000 IEC'
RF.Scheck Software iTersian 3.6 R-elease 2
DATE: 12/01/05
PROJECT TITLE: Roach
Bldg,
]dept.
use
Ceilings:
C effing 1: Flat CeflItIgOr Scissor Truss,
Comments:�
Above -Grade Walls,,46
Wall I ' Wood Franie, 1 o.c., R-21.0 cavity Insulation
Comments:
Basement Walls:
1. Basement mall 1: Solid Concrete ox Masonry, 8. d' ht/7. 01 bLY/8. insul,
-R-1 1.0 cavity insula#ion
Comments:
Windows:
3. Window 2: Vinyl Frarne:Double Pani with Lew -E, U tctor: 0.340
For windows without labeled U_factors' de&cfibe katures-
# Panes Frame Type Thermal Break?
Comments:t � YesNo
[ �
2. Window 1: Vinyl Frame.Double Palle With Law -E, U-1fictor: x.340
For �vi�daws wIthout labeled U-ftetors5 describe futures:
# Panes Frame Type Thermal Br�ak? Yes [ J No
Comments.-
Doors:
Door Glass, _a: 0. 340
2.
3.
Comments:
Door 3: Solid,, U -factor.- D.344
Comments:
Door I.: Glass, U-fictor." 0.340
rnment +
Floors:
1. Floor 1: All -Wood Jol st/Truss .-over Unconditioncd
R-38.0 continuous insulation
Comments:
Heating n d Coolhig Equipment:
1 F 1: Forced Hot Air, 94 AF UE or higher
Makc and Model Numbs`
.
E
1-1
F1
� 2- Air Conditioner 1: Electric Central Air, 10 SEER or higher
� Make and Model Number
j
Air Leakage:
Joints, penetrations, and all other such Openings ill the building envelo e that a
J leakage must be sealed. � re sources ofair
� Recessed lights must be 1) Tyke IC
� 0.511ruedor installed apppw�t� a � nate air -tight ass�abey
Clearance from combustible ma#enals. lfnon-IC rated, the fixture must
j 3" clearance from insulation. be installed with a
�
Vapor Retarder:
� � + Required an the wann-in-winter side of all non-ventad framed ceilings, wa�Is and� doors.
j Materials Identification:
Materials and equipment must be installed in accordance with the
Maten*als and equipment must be identified so that compliance can be�de�tcffm nednstallation instructions.
i Manufacturer manuaIs for all instaled heating and cooling equipment and service i equipment must be provided. ce water heating
� ) � Insolation R -values, glazing U-ifactorsand heating equ2pnler�t efficzenc 3 T must be clearlybuilding marked vn
r
j Duct Ins uI atifln:
( � j Ducts in unconditioned. spaces Must be insulated to R-5.
f Ducts outside the building must he insulated to R-8,0,
i
( Duct Canstru c#i on;
� ] J
All. Joints, warns, and connections must be securely f1stencd with weld
mastic-plus-embedded-fal�r�c, or tapes- Types and nasties must berated�gaskets:,
mastics (adhesives),UL 181A �
� Exception: welded and �ockin _longitudinal
UL 18Continuously
mg -type joints and seams on ducts
j operating at less than 2 in. w_g. X500 pad.
� ] � The HVAC system must provide a meats fDrIaancing air and water systell, s.
Temperature Controls:
t � i Thennostats are required 16r each separate HVAC system. A manual or automati
�
partially ze,strict or shut of�the heatingc means to
and/or cooling anpu� to each zone ar hoar shall be j provided.
�
Service Water Heating:.
� ] j Water heaterswith vertical pipe risers must have a hest trap an both the inlet and outlet
� wager heater has an integral head trap or 1s part of circulating system. unless the
� ] � Insulate circalatinghod water pipes to the levells �n Tab] e 1
�
Circulating mot Water Systems:
( ] l L-sulate circulating hot water pipes to the levels in Table X.
� Swimming Pauls:
[ 1 j All heated swimming pools must have an anlof }leater switch and require acove- unless over 20%
�
of the heating energy is from non-depletable sources. Pool pumps, require a, time cock.
i
�
Heating and Coaling Piping Insuiafian:
[ � + HVAC piping conveying IIuidS above 105 °F or ch711ed ffuids below SS "F m-ust he xx,gulated to the
� levels In Table 2.
D
Fable 1: Minimuftl Insulation Thickness for Circulatirrg ,ffvt Water Pipe&
klsulat—jon Tafthickness i� �nehes � PY e Sizes
14cated Water Non-Circulatin Rano t
Tern eratur� F Circulatin Mains and R
" U t 125" 1.511 to 2 _ 0" p�.�'_
170-18.00.5 1.0
140-1� 69 1.5 2. D
0.5 o.s �.a
100-1-39 Y.5
0.5 0-h 5 .5 1.0
Table 2: Minim"a Insulation ThicknessPr HV14C
Fluid Temp.
P1,I),ji'l S ste�ra T 9,ane F
Heating Systems
Low Pressure/Temperature
Low Temperature
Steam Condensate (for feed watery
Cooling Systems
Chilled Nater, Refrigerant,
and Brine
Pipes.
Insulation Thickness i I
" Runout � 11
and Less
1-2511 to 2" 51t t If
2a1 -iso 1.0 r.s 1.5 �.o
120-200 0. S 1.0 1.0 1.5
2,0
40-55 0.5 a_ s 0.75 1.0
Below 40 1.0 1.0 1.5 i.s
NOTES TQ FIELD (Building Department Use C)nIy}
;6
M
I
S
check Compliance Certificate
2000 IECC
RE S ch eck S o flware Version 3.6 Release 2
Data filename: CWT-r0gran, Files\Check�REScheckACH.rek
PROJECT TITLE.- Roach
CITY: Rexburg
STATE_ Idaho
HDD: 8693
CONSTRUCTION TYPE: Single Family
WINDOW 1 BALL RATIO.- 0. 14
DATE: 09/25/05
DATE OF PLANS: 8-5-5
PROJECT DESCRIPTION:
Harvest Heights
601 Harvest Dr.
COMPLIANCE: Passes
MaXIMUM UA =X30
Your Home UA = 336
21.9% Better Than Code (UA)
Ceiling 1: Flat Ce�ling 4r Scissor Truss
Wall 1: Wood Frame 161, n
Basetnent Wall
valid Concrete or Masoury
Wall height. 8. Of
Depth below grade. 7, OF
Insulation dept -h- S.0'
do Vinyl Frame:Double Pane with Low -F.
Glass
?Salad
Fumace 1: Forced Hat Air,�9"FUE
Air Conditioner 1: Electric Central Air, 10 SEER
bc) 6 , /I- de'I'd 5
Gross
Area or
Permit Numbeur
Checked By/Daze
Glazing
Cavity Cont* or Door
Penrneter -Value R --Value U7Factor
1947
1654
1654
203
84
63
C4 5 0/
41
94
82
COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building pians
specificatianS, and ether calculations submitted with the perm' '
P application. The proposed building has been design
tQ
zx�eet the 2000 TECO arequiremenis in REScheck Version 3. � ReI�� � (�jrmerly MECel�eck} and to comply with the
m:in,datary rGquire�cttts listedin the REScheck Inspection Checklist.
q
29
0340
1
COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building pians
specificatianS, and ether calculations submitted with the perm' '
P application. The proposed building has been design
tQ
zx�eet the 2000 TECO arequiremenis in REScheck Version 3. � ReI�� � (�jrmerly MECel�eck} and to comply with the
m:in,datary rGquire�cttts listedin the REScheck Inspection Checklist.
q
T
io
Required on the warns -in -winter side of all non -vented bmed ceilings, wa11s, and doors.
� Materials Identification:
� � I Matefials and equipment must be installed in accardanee with the Manuficturees installation instructions.
� ] � Materials and equipment must be identified so that campliance can be determined.
j ) �
M anu fact urer manuals for a.]l insulted heating and cool ing equipment and service water heating
� equipment must be provided.
� 1 � insulation R -values, glazing U -factors., and heating egUi.pment efficiency mush be clearly marded on
J
the building pans or specifications.
Duct insuYation:
[ ] �
Ducts tn unconditioned spaces must be -.nsulated to R-5,
� Ducts outside the building mist be insulated to R-8.0.
� duct Construction:
] � A11 joints, seams, and connections must be se,urely tstened with welds, gaskeis, mastics (adhesives),
� mastic-plus-embedded-�abric, or tapes. Tapes and mastics must berated UL 1 81 A or UL 181B.
f Exception= continuously wedded and lacking -type longitudinal jo'ints and seams on ducts
� operating at less than 2 in. w.g. (500 Pa).
[ ] � The HVAC system must provide a means foi- balancing air and water systems.
l
� Temperature Controls:
[ ] j Thermostats are required -far each separate HVAC system- q manual or automatic means to
� parl:.ially res�riet or slaut of�the h�aiing ar�dlor cooling input to each zonc or floor shall be provided.
� Service Water Heating:
� ] j Water heaters with vertical pipe nscrs must have a heat trap on both the inlet and outlet unless the
water heater has an integral heat trap or is part of circulating system_
j ] I
Insulate circulating hot water'pipes to the levels in Table 1.
� Circulating Bot Water Systems:
Insulate circulating hot water pipes to the bevels in. Table 1.
� Swimming Fools:
All heated swimming pools must have an fln/Qffheater switch and require a cvVer unless over 20°/a
I
of the heat"19 elzergy is from non-depletable sources. Pao1 pumps .require a time clack.
� Heating and Cooling Piping Insulation:
[ ] � HVAC piping conveying quids above SUS °F or chilled ffuids below SS "F must be insulated to the
� levels in Table 2.
Table 1
Mi n im u m In s u la tio n Th i ch -n es S fo r Circu la tin g Ho t Wa ter pip es.
InSulation Thi"ass in Tnrhp.q bx7PInc. Q ;-7,=5.v
Heated Water
T cmerature F
170-i Sp
140-169
100-139
Non-Circulatinzr.Runout,s
Un to 11,
Un to 12,65"
0.5 1.0
0.5
5.
Table . Min-IMUMI InN .
C es.
irculati
1,511 to 2.0"
1,5
1.0
0.5
r tuxa 1 ernp. Jnsulahan Thickness in inches by PiDe Sipes
P-�ining 5vsteM Types llanLye.( F
2,11 Run di��S III ailCi T .t'.C.c 9
neadng Systems
Low Pressure/Temperature
Low Temperature
Steam Condensate (for ked water)
Cooling Systems
ChilIed Water, Refrigerant.,
and Brine
. 0 L
201-250 1.0 L.5 J.5 2.0
I20-200 Q.5 1,0 1.0 1.5
Any 1.0 1. 01.5 2.0
4D -SS 0.5 0.5 0.75 1.0
Below 40 1.0 1.0 1.5 1.5
NATES TO FIEi�U (Building Department Use only)
0
0
REScheck Inspection Checklist
2000' IF cc
RES check SOftware Versiont 1
ease 2
DATE: 09/5105
PROJECT TITLE: Roach
Bldg. �
Dept. j
Use j
I
j Ceilings:
( � �
I. Ceiling 1: Flat Ceiling or Scissor Trus, R-45.0 continuous insulation
i Comments:
J
Above -Grade Walls:
� ) � I. Wall I. Woad Frame,
1611 ox., R-21.4 cavity insulation
� C�o�nm€eiats:
� Basement Walls:
Basellr1ent Wall 1: Solid Concrete or Masonry, 8.01 ht/7.01 bg18.0' insul,
j R -I X.0 cavi-iy insulation
j Commeants:
Windows:
I. Window 1: Vinyl F�-ame:Dvub�e Pane, with Low -E, U -factor: 0.344
( Far windows with out labeled U -factors , describe ka,tures:
# Panes Frame Type Thermal Break`?[ ]y�[ ]1'�0
� Comments:
j Doors:
[ ] j
I. Door l: Glass, U -factor: 0. 340
I Commends:
2. Door 2: Said, U -Victor: 0.340
� Comments:
� Heating and Cooling Equipment:
Furnace 1: Forced Hvt Air, 94 AFCTE or higher
i Make and Model Number
2. Air Conditioner 1_ Electric Central Air, la SEER or higher
� Make and Model Dumber
�
Air Leakage:
� ] � points, penetrations, and all other such openings in the building envelope that are solaces ofair
�
leakage must be sealed.
� ) � Recessed lights must be 1} Type IC rated, or 2) installed inside an appropriate air-tiht as
with bl
� th a chance from combustible materials Ifnon-ICrated, the figfixture must be �nstasemy
ll�d with a
� 3" clearance from insulation_
d
Vapor Retarder.
BuilderlDesi�ner-