Loading...
HomeMy WebLinkAboutRESCHECK - 05-00316 - 601 Harvest Dr - New SFRMEScheck Compliance Certificate 2000 IECC RES check Software 'Version 3_6 release 2 Data filename. C:\ProDum Ffles\Check\RE,-3Ct1eC, OACH.rek PROJECT IT : Roach CITY-- Rexburg SATE: Idaho HDD: 8b9� CC)NTSTRL'CTI4N TYPE: Single Family wIvaow / WALL RATIO: 0_20 BATE: 12/01/05 DATE OF PLANS: $-5-5 PROJECT DESCRIPTION: Harvest Heights 601 Harvest Dr. COMPLIANCE; Passes Maximum UA. = 436 Your Home UA = 356 18-3'% B Than Code (UA) Ceiling L Flat Ceiling -or Scissor Tress Wall 1: Wood Frame, 15" o.c. Window 2 : Vinyl Frame -.Double P ane with Low -E Door 2: Glass Door : Soli. Basement Wall 1 : Solid Concrete or Masora Wall height.: 8.01 Depth below grafi.: 7.0' Insulation depth.: 8.01 Window 1: Vinyl Frir-mie.-Doubie Rane with Door '1: Glass Floor 1: All -Wood Joi t Truns:Over Unconditioned u 1: Forced Hot Air, 94 AFU Air ConditionerI.- Electric Central.Air 10 SEER b01 Gross Area or OS 003'16 Harvest, Dr - Roach Checked By/Date SEC 4 , 2005 LII;! By Glazing Cavity Cont.or Door Perimeter R-Yatue, L -Value U-Fa.ctar 3A 1947 0.0 45.0 41 1654 21.0 0.0 82 1170 a.340 58 30 x.340 10 18 0.3411 6 � 654 1 I .0 Q.0 94 85 0.340 29 84 0.340 29 300 0.0 38.0 7 COMPLIANCE STATEMENT.- The proposed building design describod dere is consistent with the building pans, spe�fications, and other calculations submitted with the permit application. The proposed budding has been designed to WL - r .r, meet the 2000 IECC requiTements in mandatory rements l�sted requI+ in the Builder/Designer REScheck Version 3.6 Release 2 (formerly ��eck IIsPectiara Checklist. MECcheck) and to comply with the Date W3 ri RELSeheck Inspection Checklist 2000 IEC' RF.Scheck Software iTersian 3.6 R-elease 2 DATE: 12/01/05 PROJECT TITLE: Roach Bldg, ]dept. use Ceilings: C effing 1: Flat CeflItIgOr Scissor Truss, Comments:� Above -Grade Walls,,46 Wall I ' Wood Franie, 1 o.c., R-21.0 cavity Insulation Comments: Basement Walls: 1. Basement mall 1: Solid Concrete ox Masonry, 8. d' ht/7. 01 bLY/8. insul, -R-1 1.0 cavity insula#ion Comments: Windows: 3. Window 2: Vinyl Frarne:Double Pani with Lew -E, U tctor: 0.340 For windows without labeled U_factors' de&cfibe katures- # Panes Frame Type Thermal Break? Comments:t � YesNo [ � 2. Window 1: Vinyl Frame.Double Palle With Law -E, U-1fictor: x.340 For �vi�daws wIthout labeled U-ftetors5 describe futures: # Panes Frame Type Thermal Br�ak? Yes [ J No Comments.- Doors: Door Glass, _a: 0. 340 2. 3. Comments: Door 3: Solid,, U -factor.- D.344 Comments: Door I.: Glass, U-fictor." 0.340 rnment + Floors: 1. Floor 1: All -Wood Jol st/Truss .-over Unconditioncd R-38.0 continuous insulation Comments: Heating n d Coolhig Equipment: 1 F 1: Forced Hot Air, 94 AF UE or higher Makc and Model Numbs` . E 1-1 F1 � 2- Air Conditioner 1: Electric Central Air, 10 SEER or higher � Make and Model Number j Air Leakage: Joints, penetrations, and all other such Openings ill the building envelo e that a J leakage must be sealed. � re sources ofair � Recessed lights must be 1) Tyke IC � 0.511ruedor installed apppw�t� a � nate air -tight ass�abey Clearance from combustible ma#enals. lfnon-IC rated, the fixture must j 3" clearance from insulation. be installed with a � Vapor Retarder: � � + Required an the wann-in-winter side of all non-ventad framed ceilings, wa�Is and� doors. j Materials Identification: Materials and equipment must be installed in accordance with the Maten*als and equipment must be identified so that compliance can be�de�tcffm nednstallation instructions. i Manufacturer manuaIs for all instaled heating and cooling equipment and service i equipment must be provided. ce water heating � ) � Insolation R -values, glazing U-ifactorsand heating equ2pnler�t efficzenc 3 T must be clearlybuilding marked vn r j Duct Ins uI atifln: ( � j Ducts in unconditioned. spaces Must be insulated to R-5. f Ducts outside the building must he insulated to R-8,0, i ( Duct Canstru c#i on; � ] J All. Joints, warns, and connections must be securely f1stencd with weld mastic-plus-embedded-fal�r�c, or tapes- Types and nasties must berated�gaskets:, mastics (adhesives),UL 181A � � Exception: welded and �ockin _longitudinal UL 18Continuously mg -type joints and seams on ducts j operating at less than 2 in. w_g. X500 pad. � ] � The HVAC system must provide a meats fDrIaancing air and water systell, s. Temperature Controls: t � i Thennostats are required 16r each separate HVAC system. A manual or automati � partially ze,strict or shut of�the heatingc means to and/or cooling anpu� to each zone ar hoar shall be j provided. � Service Water Heating:. � ] j Water heaterswith vertical pipe risers must have a hest trap an both the inlet and outlet � wager heater has an integral head trap or 1s part of circulating system. unless the � ] � Insulate circalatinghod water pipes to the levells �n Tab] e 1 � Circulating mot Water Systems: ( ] l L-sulate circulating hot water pipes to the levels in Table X. � Swimming Pauls: [ 1 j All heated swimming pools must have an anlof }leater switch and require acove- unless over 20% � of the heating energy is from non-depletable sources. Pool pumps, require a, time cock. i � Heating and Coaling Piping Insuiafian: [ � + HVAC piping conveying IIuidS above 105 °F or ch711ed ffuids below SS "F m-ust he xx,gulated to the � levels In Table 2. D Fable 1: Minimuftl Insulation Thickness for Circulatirrg ,ffvt Water Pipe& klsulat—jon Tafthickness i� �nehes � PY e Sizes 14cated Water Non-Circulatin Rano t Tern eratur� F Circulatin Mains and R " U t 125" 1.511 to 2 _ 0" p�.�'_ 170-18.00.5 1.0 140-1� 69 1.5 2. D 0.5 o.s �.a 100-1-39 Y.5 0.5 0-h 5 .5 1.0 Table 2: Minim"a Insulation ThicknessPr HV14C Fluid Temp. P1,I),ji'l S ste�ra T 9,ane F Heating Systems Low Pressure/Temperature Low Temperature Steam Condensate (for feed watery Cooling Systems Chilled Nater, Refrigerant, and Brine Pipes. Insulation Thickness i I " Runout � 11 and Less 1-2511 to 2" 51t t If 2a1 -iso 1.0 r.s 1.5 �.o 120-200 0. S 1.0 1.0 1.5 2,0 40-55 0.5 a_ s 0.75 1.0 Below 40 1.0 1.0 1.5 i.s NOTES TQ FIELD (Building Department Use C)nIy} ;6 M I S check Compliance Certificate 2000 IECC RE S ch eck S o flware Version 3.6 Release 2 Data filename: CWT-r0gran, Files\Check�REScheckACH.rek PROJECT TITLE.- Roach CITY: Rexburg STATE_ Idaho HDD: 8693 CONSTRUCTION TYPE: Single Family WINDOW 1 BALL RATIO.- 0. 14 DATE: 09/25/05 DATE OF PLANS: 8-5-5 PROJECT DESCRIPTION: Harvest Heights 601 Harvest Dr. COMPLIANCE: Passes MaXIMUM UA =X30 Your Home UA = 336 21.9% Better Than Code (UA) Ceiling 1: Flat Ce�ling 4r Scissor Truss Wall 1: Wood Frame 161, n Basetnent Wall valid Concrete or Masoury Wall height. 8. Of Depth below grade. 7, OF Insulation dept -h- S.0' do Vinyl Frame:Double Pane with Low -F. Glass ?Salad Fumace 1: Forced Hat Air,�9"FUE Air Conditioner 1: Electric Central Air, 10 SEER bc) 6 , /I- de'I'd 5 Gross Area or Permit Numbeur Checked By/Daze Glazing Cavity Cont* or Door Penrneter -Value R --Value U7Factor 1947 1654 1654 203 84 63 C4 5 0/ 41 94 82 COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building pians specificatianS, and ether calculations submitted with the perm' ' P application. The proposed building has been design tQ zx�eet the 2000 TECO arequiremenis in REScheck Version 3. � ReI�� � (�jrmerly MECel�eck} and to comply with the m:in,datary rGquire�cttts listedin the REScheck Inspection Checklist. q 29 0340 1 COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building pians specificatianS, and ether calculations submitted with the perm' ' P application. The proposed building has been design tQ zx�eet the 2000 TECO arequiremenis in REScheck Version 3. � ReI�� � (�jrmerly MECel�eck} and to comply with the m:in,datary rGquire�cttts listedin the REScheck Inspection Checklist. q T io Required on the warns -in -winter side of all non -vented bmed ceilings, wa11s, and doors. � Materials Identification: � � I Matefials and equipment must be installed in accardanee with the Manuficturees installation instructions. � ] � Materials and equipment must be identified so that campliance can be determined. j ) � M anu fact urer manuals for a.]l insulted heating and cool ing equipment and service water heating � equipment must be provided. � 1 � insulation R -values, glazing U -factors., and heating egUi.pment efficiency mush be clearly marded on J the building pans or specifications. Duct insuYation: [ ] � Ducts tn unconditioned spaces must be -.nsulated to R-5, � Ducts outside the building mist be insulated to R-8.0. � duct Construction: ] � A11 joints, seams, and connections must be se,urely tstened with welds, gaskeis, mastics (adhesives), � mastic-plus-embedded-�abric, or tapes. Tapes and mastics must berated UL 1 81 A or UL 181B. f Exception= continuously wedded and lacking -type longitudinal jo'ints and seams on ducts � operating at less than 2 in. w.g. (500 Pa). [ ] � The HVAC system must provide a means foi- balancing air and water systems. l � Temperature Controls: [ ] j Thermostats are required -far each separate HVAC system- q manual or automatic means to � parl:.ially res�riet or slaut of�the h�aiing ar�dlor cooling input to each zonc or floor shall be provided. � Service Water Heating: � ] j Water heaters with vertical pipe nscrs must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is part of circulating system_ j ] I Insulate circulating hot water'pipes to the levels in Table 1. � Circulating Bot Water Systems: Insulate circulating hot water pipes to the bevels in. Table 1. � Swimming Fools: All heated swimming pools must have an fln/Qffheater switch and require a cvVer unless over 20°/a I of the heat"19 elzergy is from non-depletable sources. Pao1 pumps .require a time clack. � Heating and Cooling Piping Insulation: [ ] � HVAC piping conveying quids above SUS °F or chilled ffuids below SS "F must be insulated to the � levels in Table 2. Table 1 Mi n im u m In s u la tio n Th i ch -n es S fo r Circu la tin g Ho t Wa ter pip es. InSulation Thi"ass in Tnrhp.q bx7PInc. Q ;-7,=5.v Heated Water T cmerature F 170-i Sp 140-169 100-139 Non-Circulatinzr.Runout,s Un to 11, Un to 12,65" 0.5 1.0 0.5 5. Table . Min-IMUMI InN . C es. irculati 1,511 to 2.0" 1,5 1.0 0.5 r tuxa 1 ernp. Jnsulahan Thickness in inches by PiDe Sipes P-�ining 5vsteM Types llanLye.( F 2,11 Run di��S III ailCi T .t'.C.c 9 neadng Systems Low Pressure/Temperature Low Temperature Steam Condensate (for ked water) Cooling Systems ChilIed Water, Refrigerant., and Brine . 0 L 201-250 1.0 L.5 J.5 2.0 I20-200 Q.5 1,0 1.0 1.5 Any 1.0 1. 01.5 2.0 4D -SS 0.5 0.5 0.75 1.0 Below 40 1.0 1.0 1.5 1.5 NATES TO FIEi�U (Building Department Use only) 0 0 REScheck Inspection Checklist 2000' IF cc RES check SOftware Versiont 1 ease 2 DATE: 09/5105 PROJECT TITLE: Roach Bldg. � Dept. j Use j I j Ceilings: ( � � I. Ceiling 1: Flat Ceiling or Scissor Trus, R-45.0 continuous insulation i Comments: J Above -Grade Walls: � ) � I. Wall I. Woad Frame, 1611 ox., R-21.4 cavity insulation � C�o�nm€eiats: � Basement Walls: Basellr1ent Wall 1: Solid Concrete or Masonry, 8.01 ht/7.01 bg18.0' insul, j R -I X.0 cavi-iy insulation j Commeants: Windows: I. Window 1: Vinyl F�-ame:Dvub�e Pane, with Low -E, U -factor: 0.344 ( Far windows with out labeled U -factors , describe ka,tures: # Panes Frame Type Thermal Break`?[ ]y�[ ]1'�0 � Comments: j Doors: [ ] j I. Door l: Glass, U -factor: 0. 340 I Commends: 2. Door 2: Said, U -Victor: 0.340 � Comments: � Heating and Cooling Equipment: Furnace 1: Forced Hvt Air, 94 AFCTE or higher i Make and Model Number 2. Air Conditioner 1_ Electric Central Air, la SEER or higher � Make and Model Dumber � Air Leakage: � ] � points, penetrations, and all other such openings in the building envelope that are solaces ofair � leakage must be sealed. � ) � Recessed lights must be 1} Type IC rated, or 2) installed inside an appropriate air-tiht as with bl � th a chance from combustible materials Ifnon-ICrated, the figfixture must be �nstasemy ll�d with a � 3" clearance from insulation_ d Vapor Retarder. BuilderlDesi�ner-