Loading...
HomeMy WebLinkAboutCOMCHECK & PLAN REVIEWS - 05-00264 - USDA Buildingb. 4 August 1 0, A200 City of Rexburg 19 E. Main St, Rexburg,ID.83440 C1 19 Re: Plan Review- Response for USDA Building Permit #05 00264 & 0"1") 00265 The following items are modifications to the Rid Set Plans, as required by the City of RexbUrg,ibuildng, and fi re departments. The information belowand the drawings attached will be incorporated into the contract documents. Building Department Review Item #8 Mechanical Review: 41 a. HVAC design and load calculati-ons will be furnishedupon selection of subcontractor. Item 4115 — ECC Review: a. Please see attached corrected envelope analysis. b. Please see attached lighting analysis. Item # 1 6 —Exiting Review: a. Please see sheet attached drawing A-6 for emergency exit lzghting. Item 4?? IEEC Mechanical Analysis. Phase r qfey to attached Site Plan Review. Item 96 —Miscellaneous: r I . a,. Please see attached revised site plan s howing sidewalk along right-of-wa, yi ShouldAyauhave any further concerns or questions., please do no hesitate to contact me or Johnny Watson.. Sincerely, V - Brent A. McFarland. AJ.A. 15Z bund Avenue QuaJifications cert�fied BY: REXBURG, EDAHO (208) 359-2309 11c.A.R.B. Fax 359 - 2271 NATIONAL COUNCIL OFARu'711TECTUPAti REGISTRATION BOARDS A&3K%,jE=CWUF"qLL ENGI E NG CONSTRUCTION MANAGEMENT Envelope Compliance Certificate 2003 IECC CQMcheck-EZ Sotware Vmion 3.0 Release Z Data. filename: SADrawings\298 USDA Proposa1\1D0C\298.cck S eetian 1 : Proict Information Project Name: MADISON COUNTY USDA SERVICE CENTER 9 Designer/Contmctor-- JRW & .ASSOCIATES Document Author: RICHARD Seeflon 2: General Information Building Location (for wether data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 65 degrees F)-. Project Type: Window /Wall Ratia: ildina T Rexburg, Idaho 16 8693 143 New Construction 0.09 0� 00264, I Checked By/Date 111r,0020. "&.S Office 5575 Section 3; Requirements Checkhst Bldg. Dept. Use I Air Leakage, Component Certification, and Vapor Retarder Requirements L I 1 1. All joints and Penetrations are caulked, Basketed, weather-stripped, or otherwise sealed.. [ ] � 2. Windows, doors, and skylights certified as meeting leakage requirements. [ ] � 3. Cuariponent R -values & U-fictars labeled as certified. [ ] � 4. Stair, elevator shaft vents, and other dampers integral to the building envelope are equipped � with motorized dampers. C � { 5. Cargo dooxs and loading dock doors are weather sealed. L ] 1 6. Recessed lighting fixtures are: (i) Type IC rated and sealed or Basketed; or ('11) installed imide an { � appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and � with 3 inches clearance from insulation material. [ � � 7. Building entrance doors have a vestibuli and equippW with closing devices. Exceptions: Building entices with revolving o ors Doors that open dimly from a space less than 3000 sq. f. in L Climate-SpecificRequiremenis Gross 1 14 160 ME UFO Roof 1: All -Woad Joist/Rafter/Truss 5575 38.0 4.0 (1.�Z8 x.047 Exterior Wall 1: Wood Fame, Any Spacing 4816 19.0 0.0 (].068 0.(}67 Window 1: Metal Frame:Double Pane with Low -E Tinted, SHGC 0.59 440 --- --- fl. 6 1 Q 0.520 Door 2: Solid 42 0.700 0.112 Door 3: Glass, Tinted, SHGC 0. $7 57 Flour I: Slab-On-Grade-U-nheatedl, Vertical 4 f . D.92(� 0. 20 5575 --- 8.8 (a) Budget U -factors are used for 54$Wa.re baseline calculations ONLY, and are not code requirements. Ea ve I ope PAS SFS : Design 13 % better than code Section 46* Compliance Statement The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations subzn�tted with this permit application. The proposed envelope system has been designed to meet the 2003 IECC requirements in COMcheek-EZ Version 3.0 Release 2 and to comply with the mandatary requirements 2n the Requirements Checklist. 7 Q CL 94�_ Princi a1 Envelope Designer-NameN5_P S'gnature � Date 16_ 4 r 0 Mechanical Compliance Certificate 2003 IECC COMcheck-EZ Software Version 3.0 Release 2 Data filename-, S:1Drawings1298 USDA Proposal\DOC\298.cck Section 1: Project Information rj ect Name: Designer/Contractor: Document Author: n-ADlsON coUNrY US DA SERVICE CENTER TRW & ASSOCIATES RICHARD Section 2: General Information Building Location (fox weather data)-. Climate Zone.- Heating Deg-roe Days abase 55 degrees F}� Cooing Degree Days (base 65 degrees F): Project Type: Section 3.* Mechanical Systems Inst Quantitv 1 Rexburg, Idaho 16 8693 I43 New Construction enn1t Number HVAC System 1: Heating: Duct Furnace, Electric l Cooling: Rooftop Package Unit,, kBtWh, EvVorafively Cooled Condenser 1 Multiple -Zone Storage Water Heater 1: SffviceWater Heater wl Circulation Pump Section 4: Requirements Checklist Requi*rements SpeeffiT: HVAC System 1 1. Minimum one temperature control device 2. Equipment minimum efficiency-. Rooftop Package Unit: 11.0 E5 104 3 JPLV 3. Discharge dampen prohibited with firs motors >25 Capacity =x.40 4. Integrated air ecanornizer required 5. Systems serving more than one zone must be VAV systems 6. Controls capable afresetting supply air temp (SAT) by 25% of SAT -room temp dunce 7. Fan equipped with vane axial type with variable -pitch blades Requ i r x n is Specific! To! Storftge Water Heater I L 1 -in_ pipe insulation on elation stems 2. Automatic n/t. l requite T circulating systems [ ] � 3. Gas Storage Water Heater efficiency >= 0. 51 EF 1 f Generic Requirements: Nfust be met by all systems to which the requirement is applicable [ ] j 1. Load calculations per I997 ASHRAE Fundamentals [ � � 2. Plant equipment and system capacity no greater than needed to meet loads � -Exception: Standby equipment automatically o$'when primary system is operating � - Exception- �►�IuItlple units controlled to sequence operation as a function afload L � � 3 , Minimum one #emperature control device per system [ ] J 4. Minimum one humidity contras device per installed humidification/'dehumidification system [ � � 5. Thermostatic controls has 5 degree F aeadband � -Exception: Thermostats requiring manual changeover between heating and cooling � 6• Automatic Controls: Setback to 55 degree F (heat') and 85 degree F (cool7-day clock, 2 -hour occupant override, 1 0 -hour back-up i - Exception: Continuously operating zones � - Exception: 2 kW demand or less, submit calculations [ J � 7. Automatic shut -of damgm on exhaust systems and supply systems with airflow >3 ,Q00 cfm [ ) ' 8. Outside -air source far ventilation; system capa}�le o£reducing �JSA to required minimum ] j 9- R-5 supply and return air duct insulation, in unconditioned spaces j R -S supply and rehun air duct insulation outside the building j R-8 insulation between ducts and the building exterior when ducts are part of building assembly f -Exception: Ducts located within equipment � -Exception: Ducts with inferrer and exterior temperature difference not exceeding 15 degree F. l � � 10. Ducts sealed - long'Itud'Inalan scorns on rigid duds; txsverse sums on all ducts; � UL 1 181B tapes and mastics j -Exception: Continuously wedded and locking -type longitudinal joints and seams on ducts f opez-ating at static pressures less than. 2 inches w.g. pressure classification 11. Mechanical fasteners and sealants used to cc�r�n.ect ducts and air distribution equipment I 12. Operation and maintenance manual provided to building owner � ] � 13. Balancing devices provided in accordance with IMC 603.,15 J � 14. Newby purchased service water heating equipment meets the efficiency requirements [ } � 15. Water heater temperature controls: 110 degree F for dNvelling units or 90 degree F � Jbr other occupancies C 1 � 16. Stair and elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement The proposed �chani mechanicalcal design rePresented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed. mechanical systems have been designed to meet the 2003 IE C requirements in CQMcheck-EZ Version 3.0 Release Z and to comply with the mandatory requirements in the Requirements Checklist. Pfincipal Mechanical Designer -Name Signature Date IL Mechanical Requirements Description 2003 IECC COMCheck-EZ So$uaare Version 3.0 Release 2 Data filename: S:1Drawin9s1298 USDA ProposallI7QC129$.cck The filowlng list provides mare a�ail�d description of the requzremennts in Section 4 a�'the Mechanical C om fiance 4 Cett�ficate.p Requirements Specific To: HVAC System I 1. Each zone of a multiple -zone system must have its own temperature eont_rol device. 2. The specified heating ancAIor cool� miRooftop ug equipment is cov+ere�. by ASID go_ I fade and must meet the following nimum e�ciency: Package Unit: i 1.(] EER, 10.3 IFLV Fans with motors >25 hp may not be equipped with discharge dampers. All integrated air economizer is required for individual cooling Systems over 65 kBtL]Jh in the Se1cded 01217at€;. An Integrated economizer allows simultaneous operation of outdoor -air and mechanical cooing. Systems serving multiple thermostatic control zones must be vafiable-how systems. Zone terminal cantro�s mus reduce the ffvw of rim � p ary supply air- before reheating, recooliz�g, or mixing air streams. Multiple -zone systems must include controls capable flfresetting the supply air temperature by at least 25% afthe diffirence between the design supply air ternperature and the design roam temperature. Fans over 25 hp on a variable -haw system must be vane axial (propeller) types with variable -pitch blades. 3. 4. 6. 7 4 Requirements Specific Ta: Storage Water heater 1 I. Piping fDr the specified circulating service hit water system must be insulated with a minimum of 1. -in. insula#inn having a conductivity no 30.2$ Btu•inl(h•ff2-degxee F). 2. Circulating serviccc; hot water systems must have a time switch control that can autaznatically team o$�the system during unoccupied hours, 3. Service water heating equipment used solely for heating potable water, pool heaters, and hot water storage tanks must meet the following miniumum efficient Gas Storage�Y Water Heater e�cieney �= x.51 EF Generic Requirements: Must he met by all systems to which the requirement is applicably I. Design heating and Gooding Loads �'or the building must be determined using procedures equivalent to those in Chapters 27 and 28 of the ASHRAE Handbook ofFundamentals or an approved equivalent caiculatian procedure. 2. �� �11iT]tllP.T'1t ilnti vtrc�f�arv,o ,.,,..,+ L... _--- s � _ � --- -z--- „�;,I�u ifl ne no greater than needed to meet calculated loads. A single piece of equipment providing both heating and cooing must satisfy this provision dor one function with the capacity for the other function as small as possible, within available equipment options. Exception: The equipment and/or system capacity may be greater than Wculated loads for standbyaces. Standby equipment must be autamatxcally, controlled to be a#Fwhen the rim P� Exception: Multiple units of the same equipment type whose combined capa�iies�zex�cecd h and/orcalculated �y�tem is operating. allowed if they are provided with controls to sequence operation of the units as the load increases odecrases. � �� 3, Each hewing or caoizng system serving a single zone must have its own temperature control deice. 4. Each humidification systern must have its own humidity control dice. 5. Thermostats controlling bath heating and coaling must be capable of maintaining a 5 degree F deadband (a range of temperature where no heating or cooling is provided). Exception: Deaciband capability is not required if the thermostat dues not have automatic changeover capability between heating and cooling. 6. The system or zone control must be a programmable thermostat or other a��tr,,,�,�r�� PI„�-,-.,� __ . ing criteria; a) capable of sating back teriaperature to 55 degree F during heating and setting up to 85 degree F during coolingb) capable ofauivmatically setting back or shutting down systems during unoccupied hours using 7 different day SGhedu1���) have a� ac�,ible 2 -hour occupant ov�ded) have a battery back-up capable Qfmaintaining programmed settings for at least 10 hours without power. -Exception.: A setback or shuta$'cantrol is not required on #�.ermt�stats that coIltrol systems serving �.� that a e�rate continuously.p - Exception: A setback or shutalf control is not required an systems with total energy demand vf� kW 6,82G Btu/hor less. �} 7. 0-utdoor-air supply systems with design aiz$ow rats X3, 044? cfrn ofoutdoor air and all exhaust systems must have dampers that are automatically dosed while the equipment is not operating. $. The system must supply outside ventilation air as required by Chapter 4 ofthe International Mechanical Cade. Ifthe ventilation system is designed to supply outdoor -air quantifies exceeding minimum required levels, the system must be capable of reducing outdoor -air how to the minimum requited level. 9. .Air ducts must be insulated to the Nlowing Ieveis:a} Supply and return air ducts for conditioned air located in unconditioned spaces (spaces neither heated nor cawed) must be insulated with, a minimum of R-5. Unconditioned spaces include attics, crawl spaces, unheated basements, and unheated garages_b} Supply and return air ducts and plums must be insulated to a minimum afR-8 when located outside the budding, c} When ducts are located 'thin exterior components (e.g,, floors or roofs), minimum R -S insulation is required only between the duct and the building exterior. - Exception: Duct insulation is not required on ducts located within equipment. - Exception: Duct insulation is not required when the design temperature ,difference between the interior and exterior of the duct or plenum does not exceed 15 degree F. 10. All joints, longitudinal and transverse seams, and cannectl'ans in ductwork must be securely seated using weldments; mecharural fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics must be listed and labeled in accordance with UL 1$ 1 or UL 18 IB. - Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures fess than 2 inches w. g. pressure classification. 1 1. Mechanical fasteners and seals, mastics, or gaskets must be used when connecting ducts to fans and other air distribution equipment, including multiple -zone terminal units. 1Z. Operation and maintenance documentation must be provided to the ownehr that includes at least the following InfDrmation.a) equipment Capacity (input and output) and required maintenance actronsb} equipment operation and maintenance manualsc} HVAC system control maintenance and calibration information, including wiring di agra��s, schematics, and control sequence descriptions; desired or field -determined set �c�ints must be permanently recorded on control drawings, at control devices, or, hr digital control systerris, in programming commentsd} complete narrative o f h o w each system i s intended to operate_ 13. Each supply air outlet or diffi.iser and each zone terminal device (such as VAV or miring box) must have its own balancing device. Acceptable balancing devices include adjustable dampers located within the ductwork,, germinal devices,, and supply air diffiscTs. 14. Service water heating equipment muss meet minimum Federal efficiency requirements included in the National Appliance Energy Conservation Act and the Energy Policy Act of 1992, which meet or exceed ASHRAE 9Q1 Code. New service water heating equipment can be assumed to meet these requirements. . 15. Water -heating equipment must be provided with controls that allow the user to set the water tempemtuxe to 110 degree F for dwelling units and 90 degree F far other occupancies. Controls must limit output temperatures of Iavatanes in public facility restrvoms to 11 0 degree F. 16. Stair and elevator sha$ vents must be equipped with motorized dampers capable of being automatically closed during normal building operation and interlocked to open as required by fixe and smoke detection systems. All gravity outdoor air supply and exhaust hoods, gents, and ventilators must be equipped with motorized dampers that Nvi lI automatically shut when the spaces served ars not in use. Exceptions- - Gravity (non -motorized) dampers are acceptably in buildings less than three stories in height above gxadle. - Ventilation systems serving uncondi.#ioned, spaces. Envelope Compliance Certificate 2003 IECC COMcheck-E2 Soff ware Version 3.0 Release 2 Data filename: Untitled. cck S ectivn l: Project Informatilon ro j ect Name* MADISON COUNTY USDA SERVICE CENTER Designer/ Contractor JRVV & ASSOCIATES Document Author, RICHARD Section 2: General Information Building Location r weather data): Climate Zone: Heating degree Days (base 65 degrees F): Cooling Degree Days (base 65 degrees F): Project Type: Window l Wall Ratio: m 1 - .a AT, Section 3: Requirements- Checklist Rexbu-rg, Idaho 15 8693 143 New Construction 0.09 Permit Number 3.f JL i. Jk 75 e Bldg. � Dept, j Use j i Air Leakage Component Certification, and Vapor Retarder Requirements i 1 � 1. Ali joints and penetrations ars caulked, Basketed, weather- stripped, or atherwise sealed. 2. Windows:, doors, and skylights certified as muting leakage requirements. [ � � 3. Component R -values & U -factors labeled as certified. [ ] j 4. Stair, elevator shaft vents, and other dampers integral to the building envelope ars equipped J «ith motorized dampers. l 1 l $ • Cargo doors and loading dock doors are weather sealed. ] � 6. Recessed lighting fixtures are: (i) Type TC rated and sealed or Basketed; or (ii) insta eA inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and � with 3 inches clearance from insulation material. 7. Budding entrance doors have a vestibule and equipped with closing devices. � Exceptions: � Building entrances with revolvffig doors. Doors that open directly fom a space less than 3000 sq. it. in area. h e� Envelope Compliance Certificate 2003 IECC COMcheck-E2 Soff ware Version 3.0 Release 2 Data filename: Untitled. cck S ectivn l: Project Informatilon ro j ect Name* MADISON COUNTY USDA SERVICE CENTER Designer/ Contractor JRVV & ASSOCIATES Document Author, RICHARD Section 2: General Information Building Location r weather data): Climate Zone: Heating degree Days (base 65 degrees F): Cooling Degree Days (base 65 degrees F): Project Type: Window l Wall Ratio: m 1 - .a AT, Section 3: Requirements- Checklist Rexbu-rg, Idaho 15 8693 143 New Construction 0.09 Permit Number 3.f JL i. Jk 75 e Bldg. � Dept, j Use j i Air Leakage Component Certification, and Vapor Retarder Requirements i 1 � 1. Ali joints and penetrations ars caulked, Basketed, weather- stripped, or atherwise sealed. 2. Windows:, doors, and skylights certified as muting leakage requirements. [ � � 3. Component R -values & U -factors labeled as certified. [ ] j 4. Stair, elevator shaft vents, and other dampers integral to the building envelope ars equipped J «ith motorized dampers. l 1 l $ • Cargo doors and loading dock doors are weather sealed. ] � 6. Recessed lighting fixtures are: (i) Type TC rated and sealed or Basketed; or (ii) insta eA inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and � with 3 inches clearance from insulation material. 7. Budding entrance doors have a vestibule and equipped with closing devices. � Exceptions: � Building entrances with revolvffig doors. Doors that open directly fom a space less than 3000 sq. it. in area. Climate -Specific Requirements Raaf 1: All -Wood Joist/Raffer/Truss Exterior ULTaIl 1: Wood Frame, Any Spacing Window 1: Metal Frame with Thermal Brecakk:Daubie Pane with Law -E Tinted, SHGC 0.58 Danz- 1: S olid Door 2; Glass, Tinted, SGC 0, 87 Floor 1: Ali -Wood Joist/Trass (a) Budget U -factors are used for sofiware baseline l ul t Ea ve I opt PAS S : Design 23% better than code S e CtI on 4: Compliance Statement GMSS .Area or Cavity Cont. Proposed Pgdmeter R -Value -Value lT Budget U -Factor 5575 0.0 38.0 0.025 0.047 4816 0.0 19.0 0.046 0.067 Baa --- --- 0.540 0.520 42 --- --- 0.700 0.112 57 --- -- 0.920 0.520 5575 0.0 19.0 0.044 0.040 The proposed envelope design represented in this document d. is consistent calculations submitted with this permit stent with the building plans, sp�cificatians and other application. The proposed envelope system has been, designed to meet the 2043 TECC requirements in CoMeheck-EZ Version 3. 0 Release 2 and to comply with the mandatory requiremcnts in the Requirements Checklist. S Principal Envelope Designer -Name 5 i atuare ]ate Lighting Compliance Certificate 2003 IECC Fennzt Number Checked By/Date CQIVIcheck-EZ Solfware Version 3.0 Release la Data filename: C:1Documennts and 5ettingslbmcf�rlandlLocal SettingslTempozary Itrternet Files10LK431298.cck S ectio:n 1: Project Info rmati on ProjW Name: Designer/Contractor: Document Author: MADISON COUNTY USDA SERVICE CENTER TRW & ASSOCIATES RICHARD SectIF ion 2: General Information Building Use Descnption by: Pr imo Type BuNin affirm Whole Building Type New Constnxcfion Section,306 Requirements Checklist Bldg. Dept. Use Interior Lighting 1. T atal actual watts must b e less than or equal to total allovved watt s Allowed Watts 5575 Actual Watts 4236 Complies(Y/N) YES Floor Area. 5575 Exterior Lighting 2. Efficacy greater than 45 lumens/W Exceptions: Specialized lighting highlighting features ofhistoric buildings; signage; safety or security lighting; how -voltage landscape lighting. Controls, "aching, and Winn .5. Independent controls fDr ea+ch space switch/occupancy sensor}. Exception: Areas that must be continuously illuminated. 4• Master switch at entry to hotel/motel guest room. 5. Individual dwelling units separately metered. 6. Each space provided with a manual control to provide uniform dight reduction capability. Exceptions: Only one l u_miq i t x n space; An occupant -sensing d i controls - �' � �, torr �r o� tri � � � Areas that must bcontinuously urninateu; Areas that use less than 0.6 Watts F.- Lighting Compliance Certificate 2003 IECC Fennzt Number Checked By/Date CQIVIcheck-EZ Solfware Version 3.0 Release la Data filename: C:1Documennts and 5ettingslbmcf�rlandlLocal SettingslTempozary Itrternet Files10LK431298.cck S ectio:n 1: Project Info rmati on ProjW Name: Designer/Contractor: Document Author: MADISON COUNTY USDA SERVICE CENTER TRW & ASSOCIATES RICHARD SectIF ion 2: General Information Building Use Descnption by: Pr imo Type BuNin affirm Whole Building Type New Constnxcfion Section,306 Requirements Checklist Bldg. Dept. Use Interior Lighting 1. T atal actual watts must b e less than or equal to total allovved watt s Allowed Watts 5575 Actual Watts 4236 Complies(Y/N) YES Floor Area. 5575 Exterior Lighting 2. Efficacy greater than 45 lumens/W Exceptions: Specialized lighting highlighting features ofhistoric buildings; signage; safety or security lighting; how -voltage landscape lighting. Controls, "aching, and Winn .5. Independent controls fDr ea+ch space switch/occupancy sensor}. Exception: Areas that must be continuously illuminated. 4• Master switch at entry to hotel/motel guest room. 5. Individual dwelling units separately metered. 6. Each space provided with a manual control to provide uniform dight reduction capability. Exceptions: Only one l u_miq i t x n space; An occupant -sensing d i controls - �' � �, torr �r o� tri � � � Areas that must bcontinuously urninateu; Areas that use less than 0.6 Watts ] ( 7. Automatic lighting shutoff control in buildings larger than 5, 000 sq. f. ] � 8. Photocell/ astronomical time s-Mtch on exterior lights. � Exceptions: Areas requiring lighting during daylight hours [ ] j 9. Tandem wired ane -lamp and three -lamp ballasted luminaires', Exceptions: Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair, Section 4: Compliance Statement The proposed lighting design represented in this document is consistent with the building plans, specifications and ether calculations submitted with this permit application. The proposed lighting system Inas been designed to meet the 2403 MCC, Chapter 8, requirements in COMcheck-EZ 'Version 3,0 Release la and to comply with the mandatary requirements in the Requirements Checklist. Principal Lighting Designer -Name Signature Date :40 A Lighting kpplecafi�on Worksheet 2003 IECC CQMcheck-E2' Soffware Version 3.0'Release la Section I".0 Allowed fighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Watts Buildin 1'Ue Office 5575 1 5575 S ection 2: Actual Lighting Power C al cu I ati on Fixtwe Fixture 'ption ti ID L�q= Des ption 1 T-5 BuIbs 2.8 W 1 Other 1 Electronic 2 Metal halide 50W 1 Electronic Tata1. Allowed Watts = 5575 D E # of Fixture Fixt Watt. 19 xE 2 68 60 408D 1 3 52 15b Total Actual Watts = 4236 Section 316b Compliance Calculaflon Ifthe Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero, the building, complies. Lighting PASSES; Design 24% better than code Total Allowed Watts — 5575 Total Actual Watts = 4236 Project compliance = 1339 A u g., 9. 2005 2:45PN1 _1TY OF R,,EXBU-KG . I August 9, 2005 Permit Number: 05 00264 Project dame: Project Type: Review Item USDA Building Commercial New .......... ; n D_ ..:= 4-T.- s......._ _a = Structural Review Complies with approved Site Pian Review Accessibility Review Building Code Fire Compliance Review Height and Area. review Building Type Compliance Interior Environment Roof Drain Review Mechanical Review Waste Water Grease Trap dorm Waste Water Application Plumbing Sewer Drain Review Plumbing Storm Drain Review Plumbing Potable Water Review Water and Sewer Service Energy Conservation Compliance Review Exiting Review Review Action- N.f). 1 0 " r P. 2I4 PA Box 280 19 E. Mala St. Rexburg,. Idaho 83440 Phare (208) 359-3020 Fax (208) 359-3022 Actians _Approved HVAC units must be designed for seismic loads 08/03/2005 as per Section 1621 of the SBC and Section9.6 of ASCE 7, Provide truss details prior to frame inspection. Site plan has been reviewd. 08/03!2005 Meets code requirements. 081Q312005 Meets -code requirements. 08/03/2005 Meets code requirements. 08/03/2005 Building is Type VB. 08/03/2005 All wall and ceiling finish must meet the 08/03/2005 requirements of 113C Section $C33. Provide load calculations and design. Energy review for envelope identifies a slab on grade. The drawings show a crawl space. Please make the necessary charges and resubmit a new energy review. Also-, the lighting -review-ha's not leen submitted. Provide emergency exit lighting as per Section 1006.3 of the 2003. Internation2l Building Code A u 9. 200 2:46PM CITY OF . . . . . . . . ---- KL-.,X,B,u K( August 9, 2005 Permit Number: 05 00264 Project Name; USDA Building Project Type: Commercial New Review Item '.R ...... to -W P., . ... ..... b Review Action Actions Required for A ova No. 1026 414 P.o Bax 280 Required Fire Flow MINIUMUM FIRE FLOW IS 1500 GPM/TWO HOURS Water Supply ESTABLISHED VIA CITY HYDRANTS Fire Access Rads ESTABLISHED Fire Extinguishers OCCUPANCY REQUIRES MINIMUM SIZE OF 2AIOBC EXTINGUISHERS MOUNTED WITHIN TRAVEL DISTANCES. Automatic Fire Extinguishing Systems NOT REQUIRED Standpipes Commercial Cooking Alarm Systems Other Comments Parcel #'s ROM NOT REQUIRED N/A NOT REQUIRED LOCK BOX STRONGLY RECOMMENDED FOR THIS OCCUPANCY. 19 E- Main St. Rexburg, Idaho 83440 Phone (2D6) 359-3020 Fax (2D8) 359-3022 07/31/2005 07/31!2005 07/31!2005 07/31/2005 07!31/2005 07/31/2005 07/31/200-5 07/37/2005 07/31/2005 L4 e 4r A 2 0 ' 4 5 P,"v 1 OITY 01 L lu EX B f -G JN August 9, 2005 Permit Number: 05 00264 Project Name: Project Type: Review diem USDA Building Commercial New Parcel #'s R-PRR-.'-X7,BP2030050 Review Action 10 2 of P. r4 RO Box0 19 E. Main St. Rexburg, Idaho 83440 Ffi n e ( 208 359-3020 Fax (208) 359- 3022 Actions Reauired for Anproved A ug. 2 - 44PM N 0 � ��Tr car AA4,R N J A 11,11A, August 9, 2005 Permit Number: 05 00265 Project Name: Project Type: USDA Building Site Plan Review Review Action Review Item — Actions Re Approved Site Plan ........ ..:. - ---------- Z. ... . . . . . . . . . . Parcel #'s RPRRXBP2030050 I fired for A roval Typical sidewalk, section should ae shown as per public works requirements. Site plan cannot be approved until building design review.has beery complete. Building form 102� �- X14 P-0 Box 280 19 F Main St. Rexburg, Idaho 83440 P�one (208) 359-3020 Fax (208) 359-3022 A rowed 4r 2:d5PM 0 F R- EX B'Ll f�-G Review Action August 9, 2005 Permit Number: 05 00264 Project Name: USDA Building Project Type: Commercial New P* 1/ P.0 Box 280 19 E- Main Si. Rexburg, Idaho 23440 Phone (208) 359-3020 FaX (208) 359-3022 Review Item Actions arrr for Approval Amaroved Ilk Permit Tech Notes. Parcel #'s RPRRXBP20300')"'O iW Aug. 9. 2 00 2-444 IM No. CITY OF I:Z%,,-EXB f �-G August 9, 2005 Permit Number: 05 D0265 Project [Name: Project Type: USDA Building Site.Plan Review Review Action Review Item Actions Reauired p _e................ ........ f. ,P Approved Site Pilan Parcel #'s 1025 P. 414 p_O Box 280 I%EMain St. Rexburg, Id hD 83440 Phare (2D8) 359-302G Fac (2G8) 359-3022 CM JO )6 Aug, 9, 2005 2;43PM August 9. 2005 A Permit Number: 05 00265 0 Project Name: Project Type: USDA Building Site Plan Review Review Item ........... ... ............... r. - 'a,". 8- P , .7� 1 x ey L) Setbacks and Propertly Lines Number of Parking Spaces Parking Configuration Snow Storage Fire Separation Miscellaneous Plumbing Review Parcel #:s RPRRXBP203005Q No. 1025 F. 1/4 RO Box 280 19 E Main St. 't Review Action Actions equired for A rovall . W Meets zoning ordinance requirements-, 17 required. 44 provided. Meets zoning ordinance requirements. Meets zoning ordinance requirements. Back of building must be over 10'from property Gni fQ atloid being rated. The plans show 1 0'4- 112 Provide sidewalk along front of property. Provide access to the public right-of-way without using a driveway. Rexburg, Idaho 83440 Phone (2(38} 359-3020 Fax (208) 359-3022 Approved 08/03/2005 08/03/2005 08103/2005 08/03/2005 Aug, 9, 2P 0 2, 44PM No. fzk- EX B! l.1RG August 9, 2005 Permit Number: 05 0-0265 Project dame: Project Type: USDA Building Site Plan Review Review Action 102 5 F , 2 /1 P.0 Box 280 19 E Main St. Rexburg, Idaho 83440 Fh on (208" 359-3020 Fax (208) 359-3022 Review Item Actions F ®ti , Required for pproved roved ---------- ........ ......... pa. .......... ............ . ..tin i -.9 V ti=.......... .0 Water Supply Fire Access Road dire Lang Signage dition2l Comments Parcel #'s ri RPRRXB-P2030050 SITE PLAN SHOWS NO HYDRANTS, 07/31/2005 REQUIRED SPACING IS 450 FEET FROM STRUCTURE WITH MINIUMUM FLOW OF 1500 GPM/TWO HOURS. ESTABLISHED 07131/2-005 07/31/2005 LOCK BOX NOT REQUIRED BUT 07/31/2005 STRONGLY RECOMMENDED. PLEASE CONTACT THE FIRE DEPARTMENT FOR DETAILS.