HomeMy WebLinkAboutCOMCHECK & PLAN REVIEWS - 05-00264 - USDA Buildingb.
4
August 1 0, A200
City of Rexburg
19 E. Main St,
Rexburg,ID.83440
C1
19
Re: Plan Review- Response for USDA Building
Permit #05 00264 & 0"1") 00265
The following items are modifications to the Rid Set Plans, as required by the City of RexbUrg,ibuildng, and fi re departments. The information belowand the drawings attached will be
incorporated into the contract documents.
Building Department Review
Item #8 Mechanical Review:
41
a. HVAC design and load calculati-ons will be furnishedupon selection of subcontractor.
Item 4115 — ECC Review:
a. Please see attached corrected envelope analysis.
b. Please see attached lighting analysis.
Item # 1 6 —Exiting Review:
a. Please see sheet attached drawing A-6 for emergency exit lzghting.
Item 4?? IEEC Mechanical Analysis. Phase r
qfey to attached
Site Plan Review.
Item 96 —Miscellaneous: r I .
a,. Please see attached revised site plan s howing sidewalk along right-of-wa,
yi
ShouldAyauhave any further concerns or questions., please do no hesitate to contact me or Johnny
Watson..
Sincerely,
V - Brent A. McFarland. AJ.A.
15Z bund Avenue QuaJifications cert�fied BY: REXBURG, EDAHO
(208) 359-2309 11c.A.R.B. Fax 359 - 2271
NATIONAL COUNCIL OFARu'711TECTUPAti REGISTRATION BOARDS
A&3K%,jE=CWUF"qLL ENGI
E NG CONSTRUCTION MANAGEMENT
Envelope Compliance Certificate
2003 IECC
CQMcheck-EZ Sotware Vmion 3.0 Release Z
Data. filename: SADrawings\298 USDA Proposa1\1D0C\298.cck
S eetian 1 : Proict Information
Project Name:
MADISON COUNTY USDA
SERVICE CENTER
9
Designer/Contmctor-- JRW & .ASSOCIATES
Document Author: RICHARD
Seeflon 2: General Information
Building Location (for wether data):
Climate Zone:
Heating Degree Days (base 65 degrees F):
Cooling Degree Days (base 65 degrees F)-.
Project Type:
Window /Wall Ratia:
ildina T
Rexburg, Idaho
16
8693
143
New Construction
0.09
0� 00264,
I
Checked By/Date
111r,0020. "&.S
Office 5575
Section 3; Requirements Checkhst
Bldg.
Dept.
Use
I Air Leakage, Component Certification, and Vapor Retarder Requirements
L I 1 1. All joints and Penetrations are caulked, Basketed, weather-stripped, or otherwise sealed..
[ ] � 2. Windows, doors, and skylights certified as meeting leakage requirements.
[ ] � 3. Cuariponent R -values & U-fictars labeled as certified.
[ ] � 4. Stair, elevator shaft vents, and other dampers integral to the building envelope are equipped
� with motorized dampers.
C � { 5. Cargo dooxs and loading dock doors are weather sealed.
L ] 1 6. Recessed lighting fixtures are: (i) Type IC rated and sealed or Basketed; or ('11) installed imide an
{ � appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and
� with 3 inches clearance from insulation material.
[ � � 7. Building entrance doors have a vestibuli and equippW with closing devices.
Exceptions:
Building entices with revolving o ors
Doors that open dimly from a space less than 3000 sq. f. in
L
Climate-SpecificRequiremenis
Gross
1 14
160
ME
UFO
Roof 1: All -Woad Joist/Rafter/Truss 5575 38.0 4.0 (1.�Z8 x.047
Exterior Wall 1: Wood Fame, Any Spacing 4816 19.0 0.0 (].068 0.(}67
Window 1: Metal Frame:Double Pane with Low -E
Tinted, SHGC 0.59 440 --- --- fl. 6 1 Q 0.520
Door 2: Solid 42 0.700 0.112
Door 3: Glass, Tinted, SHGC 0. $7 57
Flour I: Slab-On-Grade-U-nheatedl, Vertical 4 f . D.92(� 0. 20
5575 --- 8.8
(a) Budget U -factors are used for 54$Wa.re baseline calculations ONLY, and are not code requirements.
Ea ve I ope PAS SFS : Design 13 % better than code
Section 46* Compliance Statement
The proposed envelope design represented in this document is consistent with the building plans, specifications and other
calculations subzn�tted with this permit application. The proposed envelope system has been designed to meet the 2003
IECC requirements in COMcheek-EZ Version 3.0 Release 2 and to comply with the mandatary requirements 2n the
Requirements Checklist.
7
Q CL 94�_
Princi a1 Envelope Designer-NameN5_P S'gnature � Date
16_
4
r 0
Mechanical Compliance Certificate
2003 IECC
COMcheck-EZ Software Version 3.0 Release 2
Data filename-, S:1Drawings1298 USDA Proposal\DOC\298.cck
Section 1: Project Information
rj ect Name:
Designer/Contractor:
Document Author:
n-ADlsON coUNrY US DA
SERVICE CENTER
TRW & ASSOCIATES
RICHARD
Section 2: General Information
Building Location (fox weather data)-.
Climate Zone.-
Heating
Deg-roe Days abase 55 degrees F}�
Cooing Degree Days (base 65 degrees F):
Project Type:
Section 3.* Mechanical Systems Inst
Quantitv
1
Rexburg, Idaho
16
8693
I43
New Construction
enn1t Number
HVAC System 1: Heating: Duct Furnace, Electric l Cooling: Rooftop Package Unit,,
kBtWh, EvVorafively Cooled Condenser 1 Multiple -Zone
Storage Water Heater 1: SffviceWater Heater wl Circulation Pump
Section 4: Requirements Checklist
Requi*rements SpeeffiT: HVAC System 1
1. Minimum one temperature control device
2. Equipment minimum efficiency-.
Rooftop Package Unit: 11.0 E5 104 3 JPLV
3. Discharge dampen prohibited with firs motors >25
Capacity =x.40
4. Integrated air ecanornizer required
5. Systems serving more than one zone must be VAV systems
6. Controls capable afresetting supply air temp (SAT) by 25% of SAT -room temp dunce
7. Fan equipped with vane axial type with variable -pitch blades
Requ i r x n is Specific! To! Storftge Water Heater I
L 1 -in_ pipe insulation on elation stems
2. Automatic n/t. l requite T circulating systems
[ ] � 3. Gas Storage Water Heater efficiency >= 0. 51 EF
1
f Generic Requirements: Nfust be met by all systems to which the requirement is applicable
[ ] j 1. Load calculations per I997 ASHRAE Fundamentals
[ � � 2. Plant equipment and system capacity no greater than needed to meet loads
� -Exception: Standby equipment automatically o$'when primary system is operating
� -
Exception- �►�IuItlple units controlled to sequence operation as a function afload
L � � 3 , Minimum one #emperature control device per system
[ ] J 4. Minimum one humidity contras device per installed humidification/'dehumidification system
[ � � 5. Thermostatic controls has 5 degree F aeadband
� -Exception: Thermostats requiring manual changeover between heating and cooling
� 6• Automatic Controls: Setback to 55 degree F (heat') and 85 degree F (cool7-day clock,
2 -hour occupant override, 1 0 -hour back-up
i - Exception: Continuously operating zones
� - Exception: 2 kW demand or less, submit calculations
[ J � 7. Automatic shut -of damgm on exhaust systems and supply systems with airflow >3 ,Q00 cfm
[ ) ' 8. Outside -air source far ventilation; system capa}�le o£reducing �JSA to required minimum
] j 9- R-5 supply and return air duct insulation, in unconditioned spaces
j R -S supply and rehun air duct insulation outside the building
j R-8 insulation between ducts and the building exterior when ducts are part of building assembly
f -Exception: Ducts located within equipment
� -Exception: Ducts with inferrer and exterior temperature difference not exceeding 15 degree F.
l � �
10. Ducts sealed - long'Itud'Inalan scorns on rigid duds; txsverse sums on all ducts;
�
UL 1 181B tapes and mastics
j -Exception: Continuously wedded and locking -type longitudinal joints and seams on ducts
f opez-ating at static pressures less than. 2 inches w.g. pressure classification
11. Mechanical fasteners and sealants used to cc�r�n.ect ducts and air distribution equipment
I 12. Operation and maintenance manual provided to building owner
� ] � 13. Balancing devices provided in accordance with IMC 603.,15
J � 14. Newby purchased service water heating equipment meets the efficiency requirements
[ } � 15. Water heater temperature controls: 110 degree F for dNvelling units or 90 degree F
� Jbr other occupancies
C 1 � 16. Stair and elevator shaft vents are equipped with motorized dampers
Section 5: Compliance Statement
The proposed �chani
mechanicalcal design rePresented in this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed. mechanical systems have been designed to meet
the 2003 IE C requirements in CQMcheck-EZ Version 3.0 Release Z and to comply with the mandatory requirements in
the Requirements Checklist.
Pfincipal Mechanical Designer -Name Signature
Date
IL
Mechanical Requirements Description
2003 IECC
COMCheck-EZ So$uaare Version 3.0 Release 2
Data filename: S:1Drawin9s1298 USDA ProposallI7QC129$.cck
The filowlng list provides mare a�ail�d description of the requzremennts in Section 4 a�'the Mechanical C om fiance
4
Cett�ficate.p
Requirements Specific To: HVAC System I
1. Each zone of a multiple -zone system must have its own temperature eont_rol device.
2. The specified heating ancAIor cool�
miRooftop
ug equipment is cov+ere�. by ASID go_ I fade and must meet the following
nimum e�ciency: Package Unit: i 1.(] EER, 10.3 IFLV
Fans with motors >25 hp may not be equipped with discharge dampers.
All integrated air economizer is required for individual cooling Systems over 65 kBtL]Jh in the Se1cded 01217at€;. An
Integrated economizer allows simultaneous operation of outdoor -air and mechanical cooing.
Systems serving multiple thermostatic control zones must be vafiable-how systems. Zone terminal cantro�s mus
reduce the ffvw of rim �
p ary supply air- before reheating, recooliz�g, or mixing air streams.
Multiple -zone systems must include controls capable flfresetting the supply air temperature by at least 25% afthe
diffirence between the design supply air ternperature and the design roam temperature.
Fans over 25 hp on a variable -haw system must be vane axial (propeller) types with variable -pitch blades.
3.
4.
6.
7 4
Requirements Specific Ta: Storage Water heater 1
I. Piping fDr the specified circulating service hit water system must be insulated with a minimum of 1. -in. insula#inn
having a conductivity no 30.2$ Btu•inl(h•ff2-degxee F).
2. Circulating serviccc; hot water systems must have a time switch control that can autaznatically team o$�the system
during unoccupied hours,
3. Service water heating equipment used solely for heating potable water, pool heaters, and hot water storage tanks must
meet the following miniumum efficient Gas Storage�Y Water Heater e�cieney �= x.51 EF
Generic Requirements: Must he met by all systems to which the requirement is applicably
I. Design heating and Gooding Loads �'or the building must be determined using procedures equivalent to those in
Chapters 27 and 28 of the ASHRAE Handbook ofFundamentals or an approved equivalent caiculatian procedure.
2. �� �11iT]tllP.T'1t ilnti vtrc�f�arv,o ,.,,..,+ L... _--- s � _ �
--- -z--- „�;,I�u ifl ne no greater than needed to meet calculated loads. A single piece of
equipment providing both heating and cooing must satisfy this provision dor one function with the capacity for the
other function as small as possible, within available equipment options.
Exception: The equipment and/or system capacity may be greater than Wculated loads for standbyaces.
Standby equipment must be autamatxcally, controlled to be a#Fwhen the rim P�
Exception: Multiple units of the same equipment type whose combined capa�iies�zex�cecd h and/orcalculated �y�tem is operating.
allowed if they are provided with controls to sequence operation of the units as the load increases odecrases.
� ��
3, Each hewing or caoizng system serving a single zone must have its own temperature control deice.
4. Each humidification systern must have its own humidity control dice.
5. Thermostats controlling bath heating and coaling must be capable of maintaining a 5 degree F deadband (a range of
temperature where no heating or cooling is provided).
Exception: Deaciband capability is not required if the thermostat dues not have automatic changeover capability
between heating and cooling.
6. The system or zone control must be a programmable thermostat or other a��tr,,,�,�r�� PI„�-,-.,� __ .
ing
criteria; a) capable of sating back teriaperature to 55 degree F during heating and setting up to 85 degree F during
coolingb) capable ofauivmatically setting back or shutting down systems during unoccupied hours using 7 different
day SGhedu1���) have a� ac�,ible 2 -hour occupant ov�ded) have a battery back-up capable Qfmaintaining
programmed settings for at least 10 hours without power.
-Exception.: A setback or shuta$'cantrol is not required on #�.ermt�stats that coIltrol systems serving �.� that a e�rate
continuously.p
- Exception: A setback or shutalf control is not required an systems with total energy demand vf� kW 6,82G Btu/hor less. �}
7. 0-utdoor-air supply systems with design aiz$ow rats X3, 044? cfrn ofoutdoor air and all exhaust systems must have
dampers that are automatically dosed while the equipment is not operating.
$. The system must supply outside ventilation air as required by Chapter 4 ofthe International Mechanical Cade. Ifthe
ventilation system is designed to supply outdoor -air quantifies exceeding minimum required levels, the system must
be capable of reducing outdoor -air how to the minimum requited level.
9. .Air ducts must be insulated to the Nlowing Ieveis:a} Supply and return air ducts for conditioned air located in
unconditioned spaces (spaces neither heated nor cawed) must be insulated with, a minimum of R-5. Unconditioned
spaces include attics, crawl spaces, unheated basements, and unheated garages_b} Supply and return air ducts and
plums must be insulated to a minimum afR-8 when located outside the budding, c} When ducts are located 'thin
exterior components (e.g,, floors or roofs), minimum R -S insulation is required only between the duct and the
building exterior.
- Exception: Duct insulation is not required on ducts located within equipment.
- Exception: Duct insulation is not required when the design temperature ,difference between the interior and exterior of
the duct or plenum does not exceed 15 degree F.
10. All joints, longitudinal and transverse seams, and cannectl'ans in ductwork must be securely seated using weldments;
mecharural fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics
must be listed and labeled in accordance with UL 1$ 1 or UL 18 IB.
- Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static
pressures fess than 2 inches w. g. pressure classification.
1 1. Mechanical fasteners and seals, mastics, or gaskets must be used when connecting ducts to fans and other air
distribution equipment, including multiple -zone terminal units.
1Z. Operation and maintenance documentation must be provided to the ownehr that includes at least the following
InfDrmation.a) equipment Capacity (input and output) and required maintenance actronsb} equipment operation and
maintenance manualsc} HVAC system control maintenance and calibration information, including wiring di agra��s,
schematics, and control sequence descriptions; desired or field -determined set �c�ints must be permanently recorded on
control drawings, at control devices, or, hr digital control systerris, in programming commentsd} complete narrative
o f h o w each system i s intended to operate_
13. Each supply air outlet or diffi.iser and each zone terminal device (such as VAV or miring box) must have its own
balancing device. Acceptable balancing devices include adjustable dampers located within the ductwork,, germinal
devices,, and supply air diffiscTs.
14. Service water heating equipment muss meet minimum Federal efficiency requirements included in the National
Appliance Energy Conservation Act and the Energy Policy Act of 1992, which meet or exceed ASHRAE 9Q1 Code.
New service water heating equipment can be assumed to meet these requirements. .
15. Water -heating equipment must be provided with controls that allow the user to set the water tempemtuxe to 110
degree F for dwelling units and 90 degree F far other occupancies. Controls must limit output temperatures of
Iavatanes in public facility restrvoms to 11 0 degree F.
16. Stair and elevator sha$ vents must be equipped with motorized dampers capable of being automatically closed during
normal building operation and interlocked to open as required by fixe and smoke detection systems. All gravity
outdoor air supply and exhaust hoods, gents, and ventilators must be equipped with motorized dampers that Nvi lI
automatically shut when the spaces served ars not in use.
Exceptions-
-
Gravity (non -motorized) dampers are acceptably in buildings less than three stories in height above gxadle.
- Ventilation systems serving uncondi.#ioned, spaces.
Envelope Compliance Certificate
2003 IECC
COMcheck-E2 Soff ware Version 3.0 Release 2
Data filename: Untitled. cck
S ectivn l: Project Informatilon
ro j ect Name*
MADISON COUNTY USDA
SERVICE CENTER
Designer/ Contractor JRVV & ASSOCIATES
Document Author, RICHARD
Section 2: General Information
Building Location r weather data):
Climate Zone:
Heating degree Days (base 65 degrees F):
Cooling Degree Days (base 65 degrees F):
Project Type:
Window l Wall Ratio:
m 1 - .a
AT,
Section 3: Requirements- Checklist
Rexbu-rg, Idaho
15
8693
143
New Construction
0.09
Permit Number
3.f JL i. Jk
75 e
Bldg. �
Dept, j
Use j
i Air Leakage Component Certification, and Vapor Retarder Requirements
i 1 � 1. Ali joints and penetrations ars caulked, Basketed, weather- stripped, or atherwise sealed.
2. Windows:, doors, and skylights certified as muting leakage requirements.
[ � � 3. Component R -values & U -factors labeled as certified.
[ ] j 4. Stair, elevator shaft vents, and other dampers integral to the building envelope ars equipped
J «ith motorized dampers.
l 1 l $ • Cargo doors and loading dock doors are weather sealed.
] � 6. Recessed lighting fixtures are: (i) Type TC rated and sealed or Basketed; or (ii) insta eA inside an
appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and
� with 3 inches clearance from insulation material.
7. Budding entrance doors have a vestibule and equipped with closing devices.
�
Exceptions:
� Building entrances with revolvffig doors.
Doors that open directly fom a space less than 3000 sq. it. in area.
h
e�
Envelope Compliance Certificate
2003 IECC
COMcheck-E2 Soff ware Version 3.0 Release 2
Data filename: Untitled. cck
S ectivn l: Project Informatilon
ro j ect Name*
MADISON COUNTY USDA
SERVICE CENTER
Designer/ Contractor JRVV & ASSOCIATES
Document Author, RICHARD
Section 2: General Information
Building Location r weather data):
Climate Zone:
Heating degree Days (base 65 degrees F):
Cooling Degree Days (base 65 degrees F):
Project Type:
Window l Wall Ratio:
m 1 - .a
AT,
Section 3: Requirements- Checklist
Rexbu-rg, Idaho
15
8693
143
New Construction
0.09
Permit Number
3.f JL i. Jk
75 e
Bldg. �
Dept, j
Use j
i Air Leakage Component Certification, and Vapor Retarder Requirements
i 1 � 1. Ali joints and penetrations ars caulked, Basketed, weather- stripped, or atherwise sealed.
2. Windows:, doors, and skylights certified as muting leakage requirements.
[ � � 3. Component R -values & U -factors labeled as certified.
[ ] j 4. Stair, elevator shaft vents, and other dampers integral to the building envelope ars equipped
J «ith motorized dampers.
l 1 l $ • Cargo doors and loading dock doors are weather sealed.
] � 6. Recessed lighting fixtures are: (i) Type TC rated and sealed or Basketed; or (ii) insta eA inside an
appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and
� with 3 inches clearance from insulation material.
7. Budding entrance doors have a vestibule and equipped with closing devices.
�
Exceptions:
� Building entrances with revolvffig doors.
Doors that open directly fom a space less than 3000 sq. it. in area.
Climate -Specific Requirements
Raaf 1: All -Wood Joist/Raffer/Truss
Exterior ULTaIl 1: Wood Frame, Any Spacing
Window 1:
Metal Frame with Thermal Brecakk:Daubie Pane with Law -E
Tinted, SHGC 0.58
Danz- 1: S olid
Door 2; Glass, Tinted, SGC 0, 87
Floor 1: Ali -Wood Joist/Trass
(a) Budget U -factors are used for sofiware baseline l ul t
Ea ve I opt PAS S : Design 23% better than code
S e CtI on 4: Compliance Statement
GMSS
.Area or Cavity Cont. Proposed
Pgdmeter R -Value -Value lT
Budget
U -Factor
5575
0.0
38.0
0.025
0.047
4816
0.0
19.0
0.046
0.067
Baa --- --- 0.540 0.520
42 --- --- 0.700 0.112
57 --- -- 0.920 0.520
5575 0.0 19.0 0.044 0.040
The proposed envelope design represented in this document d.
is consistent calculations submitted with this permit stent with the building plans, sp�cificatians and other
application. The proposed envelope system has been, designed to meet the 2043
TECC requirements in CoMeheck-EZ Version 3. 0 Release 2 and to comply with the mandatory requiremcnts in the
Requirements Checklist.
S
Principal Envelope Designer -Name 5 i atuare ]ate
Lighting Compliance Certificate
2003 IECC
Fennzt Number
Checked By/Date
CQIVIcheck-EZ Solfware Version 3.0 Release la
Data filename: C:1Documennts and 5ettingslbmcf�rlandlLocal SettingslTempozary Itrternet Files10LK431298.cck
S ectio:n 1: Project Info rmati on
ProjW Name:
Designer/Contractor:
Document Author:
MADISON COUNTY USDA
SERVICE CENTER
TRW & ASSOCIATES
RICHARD
SectIF
ion 2: General Information
Building Use Descnption by:
Pr imo Type
BuNin
affirm
Whole Building Type
New Constnxcfion
Section,306 Requirements Checklist
Bldg.
Dept.
Use
Interior Lighting
1. T atal actual watts must b e less than or equal to total allovved watt s
Allowed Watts
5575
Actual Watts
4236
Complies(Y/N)
YES
Floor Area.
5575
Exterior Lighting
2. Efficacy greater than 45 lumens/W
Exceptions:
Specialized lighting highlighting features ofhistoric buildings; signage; safety or security lighting;
how -voltage landscape lighting.
Controls, "aching, and Winn
.5. Independent controls fDr ea+ch space switch/occupancy sensor}.
Exception: Areas that must be continuously illuminated.
4• Master switch at entry to hotel/motel guest room.
5. Individual dwelling units separately metered.
6. Each space provided with a manual control to provide uniform dight reduction capability.
Exceptions:
Only one l u_miq i t x n space; An occupant -sensing d i controls -
�' � �, torr
�r o� tri � � �
Areas that must bcontinuously urninateu;
Areas that use less than 0.6 Watts
F.-
Lighting Compliance Certificate
2003 IECC
Fennzt Number
Checked By/Date
CQIVIcheck-EZ Solfware Version 3.0 Release la
Data filename: C:1Documennts and 5ettingslbmcf�rlandlLocal SettingslTempozary Itrternet Files10LK431298.cck
S ectio:n 1: Project Info rmati on
ProjW Name:
Designer/Contractor:
Document Author:
MADISON COUNTY USDA
SERVICE CENTER
TRW & ASSOCIATES
RICHARD
SectIF
ion 2: General Information
Building Use Descnption by:
Pr imo Type
BuNin
affirm
Whole Building Type
New Constnxcfion
Section,306 Requirements Checklist
Bldg.
Dept.
Use
Interior Lighting
1. T atal actual watts must b e less than or equal to total allovved watt s
Allowed Watts
5575
Actual Watts
4236
Complies(Y/N)
YES
Floor Area.
5575
Exterior Lighting
2. Efficacy greater than 45 lumens/W
Exceptions:
Specialized lighting highlighting features ofhistoric buildings; signage; safety or security lighting;
how -voltage landscape lighting.
Controls, "aching, and Winn
.5. Independent controls fDr ea+ch space switch/occupancy sensor}.
Exception: Areas that must be continuously illuminated.
4• Master switch at entry to hotel/motel guest room.
5. Individual dwelling units separately metered.
6. Each space provided with a manual control to provide uniform dight reduction capability.
Exceptions:
Only one l u_miq i t x n space; An occupant -sensing d i controls -
�' � �, torr
�r o� tri � � �
Areas that must bcontinuously urninateu;
Areas that use less than 0.6 Watts
] ( 7. Automatic lighting shutoff control in buildings larger than 5, 000 sq. f.
] � 8. Photocell/ astronomical time s-Mtch on exterior lights.
� Exceptions: Areas requiring lighting during daylight hours
[ ] j 9. Tandem wired ane -lamp and three -lamp ballasted luminaires',
Exceptions:
Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair,
Section 4: Compliance Statement
The proposed lighting design represented in this document is consistent with the building plans, specifications and ether
calculations submitted with this permit application. The proposed lighting system Inas been designed to meet the 2403
MCC, Chapter 8, requirements in COMcheck-EZ 'Version 3,0 Release la and to comply with the mandatary requirements
in the Requirements Checklist.
Principal Lighting Designer -Name Signature Date
:40
A
Lighting kpplecafi�on Worksheet
2003 IECC
CQMcheck-E2' Soffware Version 3.0'Release la
Section I".0 Allowed fighting Power Calculation
A B C D
Total
Floor Allowed Allowed
Area Watts Watts
Buildin 1'Ue
Office 5575 1 5575
S ection 2: Actual Lighting Power C al cu I ati on
Fixtwe Fixture 'ption
ti
ID L�q= Des ption
1
T-5 BuIbs 2.8
W 1
Other 1 Electronic
2
Metal halide
50W
1 Electronic
Tata1. Allowed Watts = 5575
D E
# of Fixture
Fixt Watt.
19
xE
2
68
60
408D
1
3
52
15b
Total Actual Watts = 4236
Section 316b Compliance Calculaflon
Ifthe Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero, the building, complies.
Lighting PASSES; Design 24% better than code
Total Allowed Watts — 5575
Total Actual Watts = 4236
Project compliance = 1339
A u g., 9. 2005
2:45PN1
_1TY OF
R,,EXBU-KG
. I
August 9, 2005
Permit Number: 05 00264
Project dame:
Project Type:
Review Item
USDA Building
Commercial New
..........
;
n D_ ..:= 4-T.-
s......._ _a =
Structural Review
Complies with approved Site Pian Review
Accessibility Review
Building Code Fire Compliance Review
Height and Area. review
Building Type Compliance
Interior Environment
Roof Drain Review
Mechanical Review
Waste Water Grease Trap dorm
Waste Water Application
Plumbing Sewer Drain Review
Plumbing Storm Drain Review
Plumbing Potable Water Review
Water and Sewer Service
Energy Conservation Compliance Review
Exiting Review
Review Action-
N.f). 1 0 " r P. 2I4
PA Box 280
19 E. Mala St.
Rexburg,.
Idaho 83440
Phare (208) 359-3020
Fax (208) 359-3022
Actians _Approved
HVAC units must be designed for seismic loads 08/03/2005
as per Section 1621 of the SBC and Section9.6
of ASCE 7, Provide truss details prior to frame
inspection.
Site plan has been reviewd. 08/03!2005
Meets code requirements. 081Q312005
Meets -code requirements. 08/03/2005
Meets code requirements. 08/03/2005
Building is Type VB. 08/03/2005
All wall and ceiling finish must meet the 08/03/2005
requirements of 113C Section $C33.
Provide load calculations and design.
Energy review for envelope identifies a slab on
grade. The drawings show a crawl space.
Please make the necessary charges and
resubmit a new energy review. Also-, the
lighting -review-ha's not leen submitted.
Provide emergency exit lighting as per Section
1006.3 of the 2003. Internation2l Building Code
A u 9. 200
2:46PM
CITY OF
. . . . . . . . ---- KL-.,X,B,u K(
August 9, 2005
Permit Number: 05 00264
Project Name; USDA Building
Project Type: Commercial New
Review Item
'.R ......
to -W
P.,
. ... .....
b
Review Action
Actions Required for A
ova
No. 1026 414
P.o Bax 280
Required Fire Flow MINIUMUM FIRE FLOW IS 1500 GPM/TWO
HOURS
Water Supply ESTABLISHED VIA CITY HYDRANTS
Fire Access Rads ESTABLISHED
Fire Extinguishers OCCUPANCY REQUIRES MINIMUM SIZE OF
2AIOBC EXTINGUISHERS MOUNTED WITHIN
TRAVEL DISTANCES.
Automatic Fire Extinguishing Systems NOT REQUIRED
Standpipes
Commercial Cooking
Alarm Systems
Other Comments
Parcel #'s
ROM
NOT REQUIRED
N/A
NOT REQUIRED
LOCK BOX STRONGLY RECOMMENDED
FOR THIS OCCUPANCY.
19 E- Main St.
Rexburg, Idaho 83440
Phone (2D6) 359-3020
Fax (2D8) 359-3022
07/31/2005
07/31!2005
07/31!2005
07/31/2005
07!31/2005
07/31/2005
07/31/200-5
07/37/2005
07/31/2005
L4
e
4r
A 2 0
' 4 5 P,"v
1
OITY 01
L lu
EX B f -G
JN
August 9, 2005
Permit Number: 05 00264
Project Name:
Project Type:
Review diem
USDA Building
Commercial New
Parcel #'s R-PRR-.'-X7,BP2030050
Review Action
10 2 of P. r4
RO Box0
19 E. Main St.
Rexburg, Idaho 83440
Ffi n e ( 208 359-3020
Fax (208) 359- 3022
Actions Reauired for Anproved
A ug.
2 - 44PM N 0
� ��Tr car
AA4,R
N J A 11,11A,
August 9, 2005
Permit Number: 05 00265
Project Name:
Project Type:
USDA Building
Site Plan Review
Review Action
Review Item — Actions Re
Approved Site Plan
........ ..:.
- ----------
Z.
... . . . . . . . . . .
Parcel #'s RPRRXBP2030050
I fired
for
A
roval
Typical sidewalk, section should ae shown as
per public works requirements.
Site plan cannot be approved until building
design review.has beery complete. Building
form
102� �- X14
P-0 Box 280
19 F Main St.
Rexburg, Idaho 83440
P�one (208) 359-3020
Fax (208) 359-3022
A rowed
4r
2:d5PM
0 F
R- EX B'Ll f�-G
Review Action
August 9, 2005
Permit Number: 05 00264
Project Name: USDA Building
Project Type: Commercial New
P* 1/
P.0 Box 280
19 E- Main Si.
Rexburg, Idaho 23440
Phone (208) 359-3020
FaX (208) 359-3022
Review Item Actions arrr for Approval Amaroved
Ilk
Permit Tech Notes.
Parcel #'s
RPRRXBP20300')"'O
iW
Aug. 9. 2 00
2-444 IM No.
CITY OF
I:Z%,,-EXB f �-G
August 9, 2005
Permit Number: 05 D0265
Project [Name:
Project Type:
USDA Building
Site.Plan Review
Review Action
Review Item Actions Reauired
p _e................ ........
f.
,P
Approved Site Pilan
Parcel #'s
1025 P. 414
p_O Box 280
I%EMain St.
Rexburg, Id hD 83440
Phare (2D8) 359-302G
Fac (2G8) 359-3022
CM
JO
)6
Aug, 9, 2005
2;43PM
August 9. 2005
A
Permit Number: 05 00265
0 Project Name:
Project Type:
USDA Building
Site Plan Review
Review Item
...........
... ...............
r. -
'a,". 8- P , .7� 1
x ey
L)
Setbacks and Propertly Lines
Number of Parking Spaces
Parking Configuration
Snow Storage
Fire Separation
Miscellaneous
Plumbing Review
Parcel #:s RPRRXBP203005Q
No. 1025 F. 1/4
RO Box 280
19 E Main St.
't
Review Action
Actions
equired for A
rovall
.
W
Meets zoning ordinance requirements-,
17 required. 44 provided.
Meets zoning ordinance requirements.
Meets zoning ordinance requirements.
Back of building must be over 10'from property
Gni fQ atloid being rated. The plans show 1 0'4-
112
Provide sidewalk along front of property.
Provide access to the public right-of-way
without using a driveway.
Rexburg, Idaho 83440
Phone (2(38} 359-3020
Fax (208) 359-3022
Approved
08/03/2005
08/03/2005
08103/2005
08/03/2005
Aug, 9, 2P 0
2, 44PM No.
fzk- EX B! l.1RG
August 9, 2005
Permit Number: 05 0-0265
Project dame:
Project Type:
USDA Building
Site Plan Review
Review Action
102 5 F , 2 /1
P.0 Box 280
19 E Main St.
Rexburg, Idaho 83440
Fh
on (208" 359-3020
Fax (208) 359-3022
Review Item Actions F ®ti ,
Required for pproved
roved
----------
........ .........
pa.
..........
............
. ..tin i -.9 V
ti=..........
.0
Water Supply
Fire Access Road
dire Lang Signage
dition2l Comments
Parcel #'s
ri
RPRRXB-P2030050
SITE PLAN SHOWS NO HYDRANTS, 07/31/2005
REQUIRED SPACING IS 450 FEET FROM
STRUCTURE WITH MINIUMUM FLOW OF
1500 GPM/TWO HOURS.
ESTABLISHED 07131/2-005
07/31/2005
LOCK BOX NOT REQUIRED BUT 07/31/2005
STRONGLY RECOMMENDED. PLEASE
CONTACT THE FIRE DEPARTMENT FOR
DETAILS.