HomeMy WebLinkAboutSPECIAL INSPECTION - 21-00728 - City of Rexburg - TWAS Tank Dome CoverInspection Date:
12/01/2021
File Name:
21066DFR12012021JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and
protected from disclosure. This message and its content is intended only for the use of the addressee(s) and
may contain sensitive/ confidential information. If you are not the intended recipient, you are hereby notified
that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender
immediately.
6c77d085ef10af70-1638988838891 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
TWAS Tank Cover
Start Time:
11:00 AM
Client:
City of Rexburg
Contractor:
StorTek
End Time:
03:00 PM
Inspection Type(s):
Structural Steel and Bolting
Location(s):
TWAS tank aluminum cover
Observations/ Remarks:
I arrived on site and spoke with the contractor. They were still in process of drilling holes for the bolts.
I told them I would return later, around 1 pm. I came back at 1:00pm and observed the contractor
place the bolts and tighten them with an impact gun. I observed that the bolts were properly tensioned
to be within the project specifications. I notified the contractor of my observations prior to leaving.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspector's Signature:Inspector's Name:
Jacob Christensen
Reviewer's Signature:Reviewer's Name:
Jacob Christensen
Reviewed Date:
12/08/2021