HomeMy WebLinkAboutSPECIAL INSPECTION FRAMING - 21-00208 - Goldenwest Credit Union - Branch Office1594 Park Circle
Ogden, Utah 84404
801.782.6008, Fax 782.4656
arwengineers.com
Construction Observation Report # 2
Project GWCU – Rexburg Branch Project Number 20446
Location HWY 191 and University Blvd Date & Time 11/3/2021 3:30 p.m.
Architect BPA Weather Sunny, clear
Contractor R&O Observer Barry Arnold
Persons Present:
Project Status Summary: The perimeter walls have been framed and sheathed. The roof trusses have been
erected.
Items of Note:
Item No.: Item: Follow-Up / Action Required: Initials Photo:
2-1 The installation of the trusses is ongoing.
See Detail 6/S2.5 indicates that Simpson
SUR/SUL26 are to be used for the connection
of the jack trusses to the hip trusses and that
the connection is to be a Deferred submittal.
Additional hardware for the connection of the
trusses to the frame walls and beams are
shown throughout the structural plans and
details.
1, 2,
and 3
2-2
Detail 8/S2.5 installation at the
intersection of Gridline 3 and Gridlines G
and F.
Contractor to confirm Detail 8/S2.5 has been
installed at the intersection of Gridline 3 and
Gridlines G and F.
N/A
2-3 Special inspection reports for shearwall
nailing have not been provided.
Provide all Special Inspection reports for
review. 4
2-4 Hold-downs at girder trusses Contractor to verify that hold-downs are located
below girder trusses. See detail 1/S2.4. 5
2-5 Detail 4/S2.6 installation at the
intersection of Gridline 4 and B.
Contractor to confirm the straps in detail 4/S2.6
are provided at the intersection of Gridline 4
and Gridline B.
N/A
End of Report
_______________________________ _______________________________
Prepared By: Barry Arnold Reviewed By: Brent L. White, PE
Corrective Action Summary
Items above requiring corrective action must be satisfactorily completed prior to being inaccessible or being covered. The Project
Superintendent and/or subcontractor responsible shall verify the work by initialing in the space above describing the action required. The
project superintendent is requested to sign below upon completion and provide a copy via fax or e-mail to the Architect and Engineer.
Superintendent Signature
Date
Distribution
Construction Observation Report
GWCU- Rexburg Branch
Page 2 of 5
[X] Project File [X] Architect [] Contractor [] Other (list)
20446_COR#2_20211103.docx
This Observation Report is the file record of the above noted site visit by ARW Engineers personnel. The Observation Visit was made in
accordance with the ARW Engineers/Client agreement for services and/or governing building codes. Observation Visits are not intended
to be comprehensive inspections. Observation visits and associated reports are not an approval or warrantee of the contractors work nor
is the Observation a Special Inspection. Means, methods and sequencing of construction as well as job site safety were not addressed or
reviewed and are not the responsibility of ARW Engineers.
Construction Observation Report
GWCU- Rexburg Branch
Page 3 of 5
Photograph 1
Photograph 2
Construction Observation Report
GWCU- Rexburg Branch
Page 4 of 5
Photograph 3
Photograph 4
Construction Observation Report
GWCU- Rexburg Branch
Page 5 of 5
Photograph 5