Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION FRAMING - 21-00208 - Goldenwest Credit Union - Branch Office1594 Park Circle Ogden, Utah 84404 801.782.6008, Fax 782.4656 arwengineers.com Construction Observation Report # 2 Project GWCU – Rexburg Branch Project Number 20446 Location HWY 191 and University Blvd Date & Time 11/3/2021 3:30 p.m. Architect BPA Weather Sunny, clear Contractor R&O Observer Barry Arnold Persons Present: Project Status Summary: The perimeter walls have been framed and sheathed. The roof trusses have been erected. Items of Note: Item No.: Item: Follow-Up / Action Required: Initials Photo: 2-1 The installation of the trusses is ongoing. See Detail 6/S2.5 indicates that Simpson SUR/SUL26 are to be used for the connection of the jack trusses to the hip trusses and that the connection is to be a Deferred submittal. Additional hardware for the connection of the trusses to the frame walls and beams are shown throughout the structural plans and details. 1, 2, and 3 2-2 Detail 8/S2.5 installation at the intersection of Gridline 3 and Gridlines G and F. Contractor to confirm Detail 8/S2.5 has been installed at the intersection of Gridline 3 and Gridlines G and F. N/A 2-3 Special inspection reports for shearwall nailing have not been provided. Provide all Special Inspection reports for review. 4 2-4 Hold-downs at girder trusses Contractor to verify that hold-downs are located below girder trusses. See detail 1/S2.4. 5 2-5 Detail 4/S2.6 installation at the intersection of Gridline 4 and B. Contractor to confirm the straps in detail 4/S2.6 are provided at the intersection of Gridline 4 and Gridline B. N/A End of Report _______________________________ _______________________________ Prepared By: Barry Arnold Reviewed By: Brent L. White, PE Corrective Action Summary Items above requiring corrective action must be satisfactorily completed prior to being inaccessible or being covered. The Project Superintendent and/or subcontractor responsible shall verify the work by initialing in the space above describing the action required. The project superintendent is requested to sign below upon completion and provide a copy via fax or e-mail to the Architect and Engineer. Superintendent Signature Date Distribution Construction Observation Report GWCU- Rexburg Branch Page 2 of 5 [X] Project File [X] Architect [] Contractor [] Other (list) 20446_COR#2_20211103.docx This Observation Report is the file record of the above noted site visit by ARW Engineers personnel. The Observation Visit was made in accordance with the ARW Engineers/Client agreement for services and/or governing building codes. Observation Visits are not intended to be comprehensive inspections. Observation visits and associated reports are not an approval or warrantee of the contractors work nor is the Observation a Special Inspection. Means, methods and sequencing of construction as well as job site safety were not addressed or reviewed and are not the responsibility of ARW Engineers. Construction Observation Report GWCU- Rexburg Branch Page 3 of 5 Photograph 1 Photograph 2 Construction Observation Report GWCU- Rexburg Branch Page 4 of 5 Photograph 3 Photograph 4 Construction Observation Report GWCU- Rexburg Branch Page 5 of 5 Photograph 5