HomeMy WebLinkAboutAUDITORIUM FFKR DOCS - 06-00627 - BYUI Auditorium/I CenterTRANSMITTAL
FFKR
Date: 7/8/2009 #: 818
To:. Quinton Owens
City of Rexburg
.12 N. Center Rexburg, Idaho
83440
Phone: (208) 359-3020
Fax:
Alt:
Sent by: Hand Delivered
From: James Moore
Enclosed: Date # of Description
copies / pages
08 -Jul -09 1 IB -A4294 & IB -A-#242 Auditorium Bridge
Remarks:
Printed: Wednesday, July 08, 2009
Project: BYU - Idaho Auditorium
Bogue Building
730 Pacific Avenue
Salt Lake City
UT 84104
Arch Project #: 06047
P 801.521.6186
1801.539.1916
Contractor: Okland Construction
w .ffkr.conn
Date: 7/8/2009 #: 818
To:. Quinton Owens
City of Rexburg
.12 N. Center Rexburg, Idaho
83440
Phone: (208) 359-3020
Fax:
Alt:
Sent by: Hand Delivered
From: James Moore
Enclosed: Date # of Description
copies / pages
08 -Jul -09 1 IB -A4294 & IB -A-#242 Auditorium Bridge
Remarks:
Printed: Wednesday, July 08, 2009
Description: This IB addresses Items that came up in RFI's 271 and 290. It also clarifies areas
deemed unclear in the architectural and structural sheets and enlarges east retaining
wall for Low -voltage access.
Changes were made to the following sheets. See clouded areas. These full size
PDF's can be found on FFKR's FTP site:
ftpJ/auditoriumeftp.ffkr.mnVAuditoriurr/Conswctim Administration/Information
Builetins4B A-0294 Bridge updates/.
Architectural:
AD440 Bridge Demo Plan
AE240 Bridge Exterior Elevations
AE340 Bridge Sections
AE341 Bridge Sections
AE440 Enlarged Bridge Plan
AE440A Footing Foundation Plan and Details
AE744 Interior Elevations Bridge
AF440 Enlarged Bridge Plan (Finish Plan)
Structural:
SE440 Bridge Framing
SE440A Bridge Framing
SE441 Bridge Braces
SE442 Bridge Details
SE443 Bridge Details
SE444 Bridge Details
Reason for Update Bridge Architectural and Structural Drawings
Instruction:
Supporting Clouded ares of full size drawing sheets found on FTP site:
Documents: Architectural:
AD440 Bridge Demo Plan
AE240 Bridge Exterior Elevations
AE340 Bridge Sections
AE341 Bridge Sections
AE440 Enlarged Bridge Plan
AE440A Footing Foundation Plan and Details
AE744 Interior Elevations Bridge
AF440 Enlarged Bridge Plan (Finish Plan)
Structural:
SE440 Bridge Framing
SE440A Bridge Framing
SE441 Bridge Braces
SE442 Bridge Details
SE443 Bridge Details
SE444 Bridge Details
INFORMATION BULLETIN
A-0294
Bogue awlding
Project: BYU - Idaho Auditorium Date: 6/30/2009
730 Paclec Avenue
Haft Lake Cfty
UT 84104
P 801.621.6186
Arch Project M 06047
(801'539'1916
contractor: Okland Construction
,.Ifkr.mm
ASI: Architects Supplemental Instruction
The Work shall be carred out in accordance with the following instructions issued in accordance with the
Contract Documents without change in Contract Sum or Contract Time. Prior to proceeding in accordance with
these instructions, indicate your acceptance of these instructions for mina change to the Work as consistent with
the Contract Documents and return a copy to the Architect.
Description: This IB addresses Items that came up in RFI's 271 and 290. It also clarifies areas
deemed unclear in the architectural and structural sheets and enlarges east retaining
wall for Low -voltage access.
Changes were made to the following sheets. See clouded areas. These full size
PDF's can be found on FFKR's FTP site:
ftpJ/auditoriumeftp.ffkr.mnVAuditoriurr/Conswctim Administration/Information
Builetins4B A-0294 Bridge updates/.
Architectural:
AD440 Bridge Demo Plan
AE240 Bridge Exterior Elevations
AE340 Bridge Sections
AE341 Bridge Sections
AE440 Enlarged Bridge Plan
AE440A Footing Foundation Plan and Details
AE744 Interior Elevations Bridge
AF440 Enlarged Bridge Plan (Finish Plan)
Structural:
SE440 Bridge Framing
SE440A Bridge Framing
SE441 Bridge Braces
SE442 Bridge Details
SE443 Bridge Details
SE444 Bridge Details
Reason for Update Bridge Architectural and Structural Drawings
Instruction:
Supporting Clouded ares of full size drawing sheets found on FTP site:
Documents: Architectural:
AD440 Bridge Demo Plan
AE240 Bridge Exterior Elevations
AE340 Bridge Sections
AE341 Bridge Sections
AE440 Enlarged Bridge Plan
AE440A Footing Foundation Plan and Details
AE744 Interior Elevations Bridge
AF440 Enlarged Bridge Plan (Finish Plan)
Structural:
SE440 Bridge Framing
SE440A Bridge Framing
SE441 Bridge Braces
SE442 Bridge Details
SE443 Bridge Details
SE444 Bridge Details
Approved by: Acknowledged by: Accepted by:
BYU Idaho FFIYR Architects Okland Construction
Owner
James Moore
2009.07.01
19:12:47 -
06'00'
Contractor
Date Date Date
Page 2 of 2
Pir-
INFORMATION BULLETIN
®
A-0242
Project- BYU - Idaho Auditorium Dale: 5/8/2009
Bogue Building
730 Pacific Avenue
'
Salt Lake City
UT 84104
Arch Project #- 06047
p801'521.6186
tltols39.1916
Contractor. Okland Construction
wwx.fAecom
ASI: Architects Supplemental Instruction
The Work shall be canied out in accordance with the following instructions issued in accordance with the
Contract Time. Prior to proceeding in accordance with
Contract Documents without change in Contract Sum or
these instructions, indicate your acceptance of these instructions for minor change to the Work as consistent
with the Contract Documents and return a copy to the Architect
Description: This Information Bulletin reissues the drawing sheets that are directly related to the
Auditorium / Hart Building Bridge. These sheets have all been substantially
updated and are listed below. Because of this update, only the sheet number has
been clouded. Some sheets are new and are Identified accordingly below.
Disregard all previously issued sheets.
PDF's for this IB are located on our FTP site =
ftpJ/flp.ffkr.wm/Auditorium/Construction AdministrationAmormation Bulletins/lB A-
0242 Bridge Backup/
_
They are in folders by discipline.
ARCHITECTURAL:
AD440 Bridge Demo Plan
AE240 Bridge Exterior Elevations
AE340 Bridge Sections
AE341 Bridge Sections and Details
AE440 Enlarged Bridge Plans
New Sheet- AE440A Footing & Foundation Plan and Details
AE441 Bridge Reflected Gelling Plans
AE442 Bridge Roof Plan
New Sheet- AE640 Hart Bridge & Stair Windows
AE706 Interior Elevations Bridge
AE744 Interlor Elevations Bridge
AF440 Finish Plan Bridge
STRUCTURAL:
SE440 Bridge Framing
SE440A Bridge Framing
SE442 Bridge Braces
SE443 Bridge Details
SE444 Bridge Details
MECHANICAL:
MH407 Large Scale Bridge Plans
PL404 Bridge Plumbing Plans
ELECTRICAL:
EE706 Bridge Floor Plan Electrical
Items to be changed for sheets not relssued:
MECHANICAL:
MH005: Change the Balance Alrflow Cooling CFM for VAVR-B105 to 250.
Reason for 100% Construction Document Set
Instruction:
Supporting See Bridge Drawings Iist above.
Documents:
Approved by: Acknowledged by: Accept by:
BYU Idaho FFKR Architects Okland Construction
James
n Moore
Owner Av�2009.05.13 Contractor
v 16:13:26 -
W OO
Date Date Date
Date Date Date
INFORMATION BULLETIN
®
A-0241
Project: BYU - Idaho Auditorium Date: 5/6/2009
Bogue Building
730 Pacific Avenue
Salt Lake City
UT 84104
Arch Project #: 06047
P 801.521.6186
f801.539.1916
Contractor: Okland Construction
wvw.flkr.com
ASI: Architects Supplemental Instruction
The Work shall be carried out in accordance with the following instructions issued in accordance with the
Contract Documents without change in Contract Sum or Contract Time. Prior to proceeding in accordance with
these instructions, indicate your acceptance of these instructions for mina change to the Work as comistent
with the Contract Documents and return a copy to the Architect
De,criptiom See attached drawing for infromation relating to the transition between ceiling and
GFRG column wraps.
Reason for
Instruction:
Supporting D6/AE505 - Ceiling to GFRG Transition
Documents:
Approved by: Acknowledged by: Accepted by:
BYU Idaho FPhR Architects Okland Construction
2009.06.29
-- 14:13:15 -
06'00'
Owner Architect Contractor
Date Date Date
IB -0241
5-6-09
D6/AE505
93
12
----------------------------- - 82 Ag
112' 89
124 125
CEILING TO GFRG
D6 1, = V -V