Loading...
HomeMy WebLinkAboutPA SUMMARY - 21-00864 - 241 S 3rd E - Mechanical ElectricalApplication Summary Application Number: 21-00864 BLD-MECHR - Residential Mechanical Misc. Received Date: 11/02/2021 241 S 3rd E - Mechanical/Electrical Address: 241 S 3rd E Property Information 241 S 3rd E RIGBY ADDITION TO REXBURGRPR000R0102840 People Information Applicant - Mike Holden 3020 Teton holdenelectric15@gmail.com Idaho Falls, ID 83406 Work: 208-716-4624 Owner - Lucinda Lemon 241 S 3 E Rexburg, ID 83440 Mobile: 208-356-8778 Contractor Information Mechanical Contractor - Holden Electric and HVAC Service - Mike Holden 022335 (04/30/2024) holdenelectric15@gmail.com 3020 Teton St Ammon, ID 83406Work: 208-529-5815 Power Company - Rocky Mountain Power - Byron Borg NONE (12/31/2022) byron.borg@pacificorp.com Power Company - Rocky Mountain Power 2 - Dewey Smuin NONE2 (12/31/2022) dewey.smuin@rockymountainpower.net Gas Company - Intermountain Gas Company - Chad Darrington 0000 (06/08/2022) IFPermits@intgas.com Work: 800-548-3679 Page 1 of 2Print Date: 11/03/2021 Application Summary Application Number: 21-00864 BLD-MECHR - Residential Mechanical Misc. Received Date: 11/02/2021 241 S 3rd E - Mechanical/Electrical Address: 241 S 3rd E Application Information Detail Description Quantity Value Additional Inspections Required Please describe the mechanical work being done replace bath fans and install timer 0.00Number of Furnaces being installed? ($65 per furnace) 0.00 0.00Number of Air Conditioning units being installed? ($65 for 1st + $10/additional HVAC equipment) 0.00 0.00Are any gas lines being installed/replaced? No = 0 Yes = 1 ($65 for 1st + $10/additional HVAC equipment) 0.00 0.00Number of water heaters being installed/replaced ($65 for 1st + $10/additional HVAC equipment) 0.00 0.00Number of free-standing fireplaces being installed? ($65 for 1st + $10/additional HVAC equipment) 0.00 0.00Number of built-in fireplaces being installed? ($65 for 1st + $10/additional HVAC equipment) 0.00 0.00Are you installing in-floor heating zones? (hydronic heating) No = 0 Yes = 1 ($65 for 1st + $10/additional HVAC equipment) 0.00 1.00Number of other additional HVAC equipment not listed above ($65 for 1st + $10/additional HVAC equipment) 1.00 NBy checking this box, I acknowledge the requirement for contractors to be registered with the State and/or claim exemption from this requirement as a homeowner working on my own home. Comments Fee Information Fee Code & Description Amount $65.00Mechanical - Misc. $65 base + $10 per ea (BLDMEWRK2) $65.00Electrical - Misc. $65 base + $10 per ea (BLDELWRK2) $130.00 Payment Information Payment AmountTender Type Reference InfoPayment Date 10/31/2021 Credit Card 109129169 $130.00 $130.00 Page 2 of 2Print Date: 11/03/2021