Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 18 - 21-00119 - Adams Elementary School - AdditionInspection Date: 10/23/2021 File Name: 21020DFR10232021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 10/25/2021 B1E42D87-D457-4991-B8C3-0989B6725287 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 07:30 AM Client: Madison School District Contractor: Thompson Excavation End Time: 03:00 PM Inspection Type(s): Asphalt Densities Other Location(s): Base and asphalt densities for rear parking lot Observations/ Remarks: Adams Elementary School. Several areas were reportedly affected by recent rain and did not meet 95% compaction. These results were reported to the foreman immediately. Asphalt paving followed as scheduled. Began paving around 9 AM. Met with Josh from Thompson for density testing of asphalt paving. All passing density test results were immediately reported to the compaction crew and to the foreman. Left site around 2:30 PM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 10/23/2021 File Name: 21020DFR10232021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 10/25/2021 B1E42D87-D457-4991-B8C3-0989B6725287 2