Daily Field Report
Project Name:
Adam's Elementary
Start Time:
07:30 AM
Client:
Madison School District
Contractor:
Thompson Excavation
End Time:
03:00 PM
Inspection Type(s):
Asphalt Densities
Other
Location(s):
Base and asphalt densities for rear parking lot
Observations/ Remarks:
Adams Elementary School. Several areas were reportedly affected by recent rain and did not meet
95% compaction. These results were reported to the foreman immediately. Asphalt paving followed as
scheduled. Began paving around 9 AM. Met with Josh from Thompson for density testing of asphalt
paving. All passing density test results were immediately reported to the compaction crew and to the
foreman. Left site around 2:30 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
10/23/2021
File Name:
21020DFR10232021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
10/25/2021
B1E42D87-D457-4991-B8C3-0989B6725287 2