Loading...
HomeMy WebLinkAboutASPHALT DENSITY REPORT - 21-00119 - Adams Elementary School - Addition562665EB-4DE9-47BE-A96A-01A193BEDC97 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com In Place Density of Asphalt by Nuclear Methods ASTM D2950 Project Number: 21020 Contractor: Thompson Construction Project Name: Adam's Elementary Instrument ID 78652 Daily Standardization: Client: Madison School District Date: 10/23/2021 MS: 664 DS: 2469 Time Start: 07:30 AM Time End: 03:00 PM Details Test #: Location:Lift: Material:Wet:Marshall #: % Marshall: Pass Fail 1 Southwest corner 10 feet from building 1 Asphalt Marshall 139.8 151.8 92 2 South east corner of gym 1 Asphalt Marshall 139.2 151.8 92 3 South west corner 20 feet south of gym 1 Asphalt Marshall 139.1 151.8 92 4 South east corner of Gym 20 feet from gym 1 Asphalt Marshall 139.4 151.8 92 5 30 feet east of gym, 50 feet north of building 1 Asphalt Marshall 138.9 151.8 92 6 50 feet east of gym, 70 feet north of building 1 Asphalt Marshall 139.1 151.8 92 7 30 feet east of gym 90 feet north of building 1 Asphalt Marshall 140.0 151.8 92 8 50 feet east of gym 110 feet north of building 1 Asphalt Marshall 140.2 151.8 92 9 50 feet east of gym 130 feet north of building 1 Asphalt Marshall 139.9 151.8 92 10 30 feet east of gym 130 feet north of building 1 Asphalt Marshall 139.8 151.8 92 11 North east corner of gym 10 feet north of building 1 Asphalt Marshall 141.7 151.8 93 12 North west corner of gym 1 Asphalt Marshall 139.7 151.8 92 13 100 feet east of north east corner of gym 1 Asphalt Marshall 143.5 151.8 95 14 North west corner of gym 20 feet north of gym 1 Asphalt Marshall 143.2 151.8 94 15 North east corner of gymnasium 20 feet north of building 1 Asphalt Marshall 140.9 151.8 93 16 100 feet west of north east corner of site 1 Asphalt Marshall 139.7 151.8 92 562665EB-4DE9-47BE-A96A-01A193BEDC97 2 Test #: Location:Lift: Material:Wet:Marshall #: % Marshall: Pass Fail 17 North east corner of site 1 Asphalt Marshall 141.0 151.8 93 Remarks: Arrived on site around 8 AM and tested base density prior to asphalt paving. Began paving around 9 AM. Met with Josh from Thompson for density testing of asphalt paving. All passing density test results were immediately reported to the compaction crew and to the foreman. Left site around 2:30 PM. Tested By: L. Clifford Signature: Date: 10/23/2021 Reviewed By: E. Vail Signature: Date: 10/25/2021