Loading...
HomeMy WebLinkAboutDOCS JULY 2009 - 08-00495 - WalMart - Remodel-••1 r-nNLL 11Vl.. 1405 Foote Drive Idaho Falls, Idaho 83402 Richard Stevenson (208) 523-2681 LICENSED ARCHITECT .N 'This Construction Change D-rective modifies T Y S 0 N H 0 thet �TAT� F IDAHO .7 V L A _jThe Contractor shall obtain approval of the Wal-Mart ConstruCtian Manager before beginning the Work defined in this Construction Changs Directive_ If applicabie, adjus tmen# to the Contract Sum may be based only on the method described in 7.3.3.1 of the contract. A response to the Construction Change Directive shall be returned to the Construction Manager within 21 days as required by the Construction Contract. SUMMARY- UPdate drawings per RFI. Add trench drains at cart storage. Add roll seal doors at Metal Canopy. This Addendum consists of Page 7 through 2 of this Narrative and Drawing Sheets Al, A1. 1 , A8, GC 1, S2.IVIp'!P1, P3, E2, end E4, ai) dated Jure 12, 2Q09, ARCHTECTURAL SHEET Al — FLOOR PLAN PLAN 1 — FLOOR PLAN • Add roll seal doors between 500 Metal Canopy and 501 Garden Center. • Add plumbing chase to front Sales floor as shown. DETAIL 2 — VENT CHASE • Add detail in its entirety. SHEET A1.1 — FLOOR FINISH PLAN PLAN 1 — FLOOR FINISH PLAN • Add french drains to ceramic tile area on Sales floor. DETAIL 7 —TRENCH DRAIN • Add detail in its entirety. SHEET A8 — DOOR SCHEDULE DOOR SCHEDULE • Revise door 157A Back Office Corridor to show a new door and new 9' high frame. SHEET GC1 — GARDEN CENTER PLANS AND DETAILS PLAN 1 — GARDEN CENTER PLAN � Add roll Seel doors between 500 Metes! Canopy and 501 Garden Center. Add plan notes as shown. STRUCTURAL SHEET S2 — FOUNDATION AND FRAMING PLANS AND DETAILS PLAN 3 -PARTIAL ROOF FRAMING PLAN • Plan blow up now reads 5-S2. PLAN 6 -PARTIAL FOUNDATION PLAN Plan locates the new trench drains DETAIL 7 -TRENCH DRAIN • Section details the size and reinforcement for the trench drain, OR VVt-'%L-1V1/AM I Z) I UHL NO. 1878 PROJECT: REXBURG ID 1 PROJECT N0. 0802 021 MECHANICAL SHEET MP1 - MECHANICAL AND PLUMBING PLAN PLAN 1 - MECHANICAL AND PLUMBING PLAN • Updated base per architectural updates. • Revised detail callout for 5/P1 SHEET P1 - ENLARGED PLUMBING PLANS PLAN 5 - ICE MACHINE PLUMBING PLAN • Updated base per architectural updates. • Revised plumbing to incorporate new trench drains. Sheet P3 - PLUMQING SCHEDULES FLOOR / ROOF DRAIN SCHEDULE • Added FDS to schedule. ELECTRICAL SHEET E2 - POWER PLAN PLAN 1 - POWER PLAN • Revised branch circuitry for RTU -2 per RFI#12. SHEET E4 - PARTIAL ELECTRICAL RISER DIAGRAM CONNECTED LOADS FABLE • Updated for revised loads per revised RTU load. ENE) OF CONSTRUCTION CHANGE DIRECTIVE NO. 5 BY: Trevor Tyson Holcomb Architect 2 JUNE 125 2009 CONSTRUCTION CHANGE—DIREC—T--- IVE N0.5 11 N. Record Street, Suite 222 Dallas, Texas, 75202 Telephone 214/749-0626 Fax 214/748-0656 TO., City of Rexburg Atte: JeNell Hansen 19 East Main Street Rexburg, ID $344Q 208-359-3020 WE ARE SENDING YOU ATTACHED LETTER OF TRANSMITTAL DATE: 7/16/09 JOB: 0802021 RE: # 1 8 i 8 Rexburg, ID Wal-Mart General Remodel El UNDER SEPARATE COVER THE FOLLOWING ITEMS- 0 P DRAWINGS PRINTSCEJ VIA El FOR YOUR USE FOR REVIEW & COMMENT [Z FOR OVAL FOR ACTION AS NOTFD EJ': Hi JaNeII! Please see the attached construction drawi If there is an AS REQUESTED AS REQUESid D BY: S for your review and a-p-prova.1 for the above referenced pro' 1 Ing else that You rived, please coo it t he sitate to contact me! IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE. SIGNED Trevor T. H01com