'This Construction Change D-rective modifies T Y S 0 N H 0
thet �TAT� F IDAHO
.7 V L A _jThe Contractor shall obtain approval of the Wal-Mart ConstruCtian Manager before beginning the Work defined in
this Construction Changs Directive_ If applicabie, adjus tmen# to the Contract Sum may be based only on the
method described in 7.3.3.1 of the contract. A response to the Construction Change Directive shall be returned
to the Construction Manager within 21 days as required by the Construction Contract.
SUMMARY-
UPdate
drawings per RFI.
Add trench drains at cart storage.
Add roll seal doors at Metal Canopy.
This Addendum consists of Page 7 through 2 of this Narrative and Drawing Sheets Al, A1. 1 , A8, GC 1, S2.IVIp'!P1, P3, E2, end E4, ai) dated Jure 12, 2Q09,
ARCHTECTURAL
SHEET Al — FLOOR PLAN
PLAN 1 — FLOOR PLAN
• Add roll seal doors between 500 Metal Canopy and 501 Garden Center.
• Add plumbing chase to front Sales floor as shown.
DETAIL 2 — VENT CHASE
• Add detail in its entirety.
SHEET A1.1 — FLOOR FINISH PLAN
PLAN 1 — FLOOR FINISH PLAN
• Add french drains to ceramic tile area on Sales floor.
DETAIL 7 —TRENCH DRAIN
• Add detail in its entirety.
SHEET A8 — DOOR SCHEDULE
DOOR SCHEDULE
• Revise door 157A Back Office Corridor to show a new door and new 9' high frame.
SHEET GC1 — GARDEN CENTER PLANS AND DETAILS
PLAN 1 — GARDEN CENTER PLAN
� Add roll Seel doors between 500 Metes! Canopy and 501 Garden Center.
Add plan notes as shown.
STRUCTURAL
SHEET S2 — FOUNDATION AND FRAMING PLANS AND DETAILS
PLAN 3 -PARTIAL ROOF FRAMING PLAN
• Plan blow up now reads 5-S2.
PLAN 6 -PARTIAL FOUNDATION PLAN
Plan locates the new trench drains
DETAIL 7 -TRENCH DRAIN
• Section details the size and reinforcement for the trench drain,
OR
VVt-'%L-1V1/AM I Z) I UHL NO. 1878
PROJECT: REXBURG ID
1
PROJECT N0. 0802 021
MECHANICAL
SHEET MP1 - MECHANICAL AND PLUMBING PLAN
PLAN 1 - MECHANICAL AND PLUMBING PLAN
• Updated base per architectural updates.
• Revised detail callout for 5/P1
SHEET P1 - ENLARGED PLUMBING PLANS
PLAN 5 - ICE MACHINE PLUMBING PLAN
• Updated base per architectural updates.
• Revised plumbing to incorporate new trench drains.
Sheet P3 - PLUMQING SCHEDULES
FLOOR / ROOF DRAIN SCHEDULE
• Added FDS to schedule.
ELECTRICAL
SHEET E2 - POWER PLAN
PLAN 1 - POWER PLAN
• Revised branch circuitry for RTU -2 per RFI#12.
SHEET E4 - PARTIAL ELECTRICAL RISER DIAGRAM
CONNECTED LOADS FABLE
• Updated for revised loads per revised RTU load.
ENE) OF CONSTRUCTION CHANGE DIRECTIVE NO. 5
BY: Trevor Tyson Holcomb Architect
2
JUNE 125 2009
CONSTRUCTION CHANGE—DIREC—T---
IVE N0.5
11 N. Record Street, Suite 222
Dallas, Texas, 75202
Telephone 214/749-0626
Fax 214/748-0656
TO., City of Rexburg
Atte: JeNell Hansen
19 East Main Street
Rexburg, ID $344Q
208-359-3020
WE ARE SENDING YOU ATTACHED
LETTER OF TRANSMITTAL
DATE: 7/16/09 JOB: 0802021
RE:
# 1 8 i 8 Rexburg, ID
Wal-Mart General Remodel
El UNDER SEPARATE COVER
THE FOLLOWING ITEMS- 0 P DRAWINGS PRINTSCEJ
VIA
El FOR YOUR USE FOR REVIEW & COMMENT
[Z FOR OVAL FOR ACTION AS NOTFD
EJ':
Hi JaNeII!
Please see the attached construction drawi
If there is an
AS REQUESTED
AS REQUESid D BY:
S for your review and a-p-prova.1 for the above referenced pro'
1
Ing else that You rived, please coo it t he
sitate to contact me!
IF ENCLOSURES ARE NOT AS NOTED,
KINDLY NOTIFY US AT ONCE.
SIGNED Trevor T. H01com