HomeMy WebLinkAboutSTAFF REVIEWS - 09-00269 - New Building - Beard/St. Clair Law Office1)
August 19, 2009
Crystal Homes LLC
Austin Crystal
342 Fire Thorn Dr
Idaho FaRs, ID 83404
Subject: Beard St. Clair Law Office
Permit #'s 09 00247 & 09 00269
Dear Austin,
{' I T S" 0 F
. . .. . ....... . ...............
CW .- . - 1..-
Amen_4a'; Family Commr-ality
.0
I
Site and building plans have been reviewed by all necessaq departments for the Beard St, Clair Building
located at 520 First American Circle. Below are the items that need to be addressed prior to iss«ance of a
building hermit.
Site Plan-.
1} Please provide. a flood plain certificate.
2) A smaller bush on the south side of the entrance needs to be added to help provide the required
buffer.
3) Three handicap parking stalls ate needed per the IBC 2006, Chapter 1 1. The parking stalls in the
southwest comer maybe too smaU for maneuvering. Cine plan notes 12 and the other notes 13.
Please verify the correct number.
4) Identify the internal accessible pedestrian walt�;ay to the -right of way Ulitliout using the driveway.
IThe I Mbe5) Concrete s'dewalks 'th alandscape strip need to be shown. sidewalk must w'stalled per City
standards along the cul-de-sac frontage,
6) Identify the location of the HVAC equipment and dumpstersuri�h7) Label all adjoining streets iPncluding the cul-de-sac. the required �e�cfng/screening.
8) Square footage of the building and all dimensions including the right of way and property lines need
to be labeled. Please include the distance to property lines.
9) Are there any existing or proposed casements?
1(3) All fie lanes must be marked as per the 2006 International Fire Code, Appendix D.
Building Plan:
1) Electrical, mechanical and plumbing contractor inforination including sig -natures is needed.
Estiznates Oabor &materials) are also needed.
2) Make sure that all '%Vlting complies xxq'th the 2008 NEC,
3) Plans show a 25,000 AI'C rating for the main panel; make sure, it is wired accordingly.
4)
5)
Energy comphance report as per the 2006 IECC needs to be submitted.
Special inspections are required on the foundation.
31 Nodb I-F� Eaff Re.�4iif% ID 834-4 0
N
P. 0. Box 280
None (208) 3593020 Fax (208) 35R.3022
=W.rVXh7'erg-0q
CITY OF
REXBURCj
Beard St. Clair Law Office Builchng Plan Review (cont"d)
01
�) Truss calculations must be provided prior to the fuming inspection.
All plumbing services including Nvater lines are required to be tested and inspected before covering
�} All drain lines are required to be installed to the 2043 Uniform Plumbing bode.
a) Fire extinguishers are required for this occupancy.
�} A Fire alarm system is not required according to the plates subrniitted.
Please submit your comments and 2 ca ies of re'vised plans for review to City Mall at 31 N 1ST E. If you
have questions cantactJaNell Hansen, Budding Safety Coorcinator, at 20$.372.2346 or
janellh@rexburg.org.
Sincere
Val Christensen
Community Development Director
jh
31 ATo l) 11 East Rtxburg ID 83440
R - . B z: 280
NOW (208)15 9.3020 Fax (208) 359, 3022
f�
w
i � 0 f� ' 1
CeaTY () F
-)UI�G
r r
-1
September 2, 2009
Review Action
Permit Number: 09 00247
Project Name: Beard St. Clair Office Bldg -Site Plan
Project Type: Site Plan Review
Review Item--,
Planning Staff Review
Approved Site Plan
Approved Site Pian
Approved Site Plan
Approved Site Plan
Approved Site Plan
Approved Site Plan
Approved Site Plan
Approved Site Pian
Approved Site Plan
Parcel #`S
RPROOOW3 010110
Acti
0
Please provide a Flood Plain Certificate.
Add a smaller bush on south side of entrance,
to help provide required buffer.
Chapter 11 of the International Building Code
requires three handicap accessible parking
spaces.
Please identify internal accessible pedestrian
walkway to Right of Way with out using
driveway.
Please show concrete sidewalks
wllandscaping strip; sidewalks must continue
through drive way.
Identify location of HVAC equipment &
dumpsters with required fencing/screening.
Please lobe! all adjoining streets including
culdesac.
Label square footage of building and all
dimensions, also label' Right of Way & Property
Lines with distance to property lines.
Are there any eXistirrg or proposed easements?
d
RO Box 280
Rexburg, Idaho 83440
Phone ('2a8) 359-3020
Fax (208) 359-3022
A P_prorred.
09/01/2009
09!01/2009
09/01/2009
09/01/2009
09/01/2009
09/01/2009
09/01/2009
ham.
I �+SAZ C 4--"
re
rLk
M
Y=
REXB_URG
� L
r mm Uni, fif
1
Review Action
September 2, 2009
Permit Number: 09 00247
Project Name: Beard St. Clair Office Bldg -Site Plan
Project Type: Site Plan Review
`ol
Rexburg, ;daho 83440
Phone (208) 359-302
fax (208) 359-3422
Review Item Actions Required for Approval r__.A��rt�ved-
Public
Works Review
Approved Site Plan I. Sidewalk must be installed per city
standards along cudesac frontage.
2. Water and sewer line sizing to be verified
upon building plan submittal.
3. Second lighting plan is acceptable.
4. Perking stalls in SW corner may be too
sma[I for manuevering, One plan notes 12 and
the other notes 13 stabs.
5. Where is the trash enclosure ?
1. Sidewalks to be per pity of Rexburg
Standards.
2. The second revision of the lighting pian �s
unacceptable. the first revision must be used.
3. Sidewalk must have landscape strip.
4. Street Fight must be installed near end of
cufdesac.
Parcel #'s RPROOOW3 0 10110 .0
09(02/2009
1 1' Y () F
R--EXBUR(-j
� OW - -
r !
September 2, 2009
Review Action
Permit Number: 09 00247
Project Name: Beard St. Clair Office Bldg -Site Plan
Project Type: Site Plan Review
Review Item.- Acfions Requir
Required Fire Flow
Existing Hydrants
Proposed Hydrants
Access to Hydrants
Firs Apparatus Access
Hydrant Flows Provided
Vicinity Map Provided
Fire Sprinkler System Required
Fire Leas Signage
Parcel #'s
RPROOOW301 01 10
V
U
ASI fire Panes must be marked as per the 2(305
code
Je
P-0 Box 280
Rexburg, Idaho 83440
Phone (2Q8) 359-3020
Fax (208) 359-3022
Approved
08/18/2009
08/18/2009
08/18/2009
08/18/2009
08/18/2009
08/18!2009
08/1 8120 0 9
a ! T Y
1�-t.-X—BURG._ ......................._.... ... .
-1y
r +
September 2, 2009
Permit Number: 09 00269
project Name:
Project Type:
Review item
Review Action
Beard St. Chair Law Office
Commercial New
Administrative Revi'
Permit Tech Nates
ParcelPs
RPROOOW30 10110
WO'
19 E. Main St.
Rexburg, Who 83440
Phone (208) 359-3020
Fax (208) 359-322
ions Reqmiredl for nroval Approve
Plumbing contractor signature and estimate is
needed when contractor has been determined
and before a permit is issued.
Electrical contractor signature and estimate is
needed when contractor has been determined
and before a permit is issued.
Mechanical contractor signature and estimate
is needed when contractor has been
determined and before a permit is issued..
;%
FU
Y 0 .F
-REXBURC-i
...
.......... ____ (_I -W _.---- ........:.
A�r.er ica P'ar. 7111 Cry?)I M, 01 In f�
September 2, 2009
Permit Number: 09 00269
Project Name:
Project Tyke:
Review Action
Beard St. Clair Law Office
Commercial New
Review Item
Budding Department Rev i O'W'
:-. ......,;
Electrical Energy Lighting Compliance Review
Electrical Circuits Review
Electrical Service Review
Building Code Fire Compliance Review
Mechanical Review
Accessibility Review
Structural Review
Interior Environment
Complies with approved Site Plan Review
Energy Conservation Compliancy Review
Exiting Review
Building Type Compliance
Height n Area Review
Plumbing Storm Drain Review
Water and Sewer Service
Waste Wader Application
Fasts Water Grease Trip Form
Plumbing Sewer Crain Review
Plumbing Potable Water Review
P,O Box 280
Rexburg, Idaho $3440
Phone (208} 359-3020
Fax �208) 359-3022
Actions Required for Ap.- rova.1 Aw3rovedl
Make sure that this is wired to the 2008 NEC.
25,000 ASC rating is spec'd out for the main
panel -make sure that this is wired according to
the plans that were submitted.
Special inspections required on foundation,
Provide truss talc's prior to framing inspection.
energy compliance report needs to be
submitted.
All plumbing services are required to be tested
and inspected before covering.
I
All drain lines are required to be installed to the
Uniform Plumbing Code 2003 Edition.
All water lines ars required to be tested and
08/1 212 00 9
WKIII-01
08/12/2009
08/1 4/2009
08/14/2009
08/14/2009
08/14/2009
08/14/2009
08/14!2009
08/14/2009
08(14/2009
08/14/200-9
08/14/2009
08/17/2009
08/17/2009
08/17/2009
08/17/2009
08(17/2009
�Fq .
F
1 5
C I T Y 0 F
,..... _....... a.__..... ............... ...._.-1--.n 1u ueu u•�r�m�.w�
REXBURG
September 2, 2009
Permit Number: 09 00269
Project Name:
Project Type:
Review Action
Beard St. Clair Law Office
Commercial New
RO Box 280
19 E- Main St.
Rexburg, Idaho 8344
Phone (2D8) 359-3020
Fax (208) 359-3022
Review Item .,_. Actions Required for Approval _ _. ApDroved
Parcel #'s
RPROOOW30101 10
inspected before covering.
I
-E
W
C' I T Y 0V
UR
OW11--111111111111".....
A i n e r ica-'5 Ramily Gommundry
0 e
September 2, 2009
Permit Number: 09 00269
Project Name:
Project Type:
Review Item
Review Action
Beard St. Clair Laver Office
Commercial New
RO Box 280
19 E. in St
Rexburg, Idaho 83440
Phone (206) 359-3020
Fax (208) 359-3022
____ Actions Required for Approval
0 - — Approved
Fire DePartment R-evia",.ens,_.
.::
Fire Extinguishers
Alarm Systems
Water Supply
Required Fire Flow
Fire Access Roads
Commercial Cooking
Standpipes
Automatic Fire Extinguishing Systems
Parcel #`s
RPR000 W 3
Fire extinguishers are required for this
occupancy.
Not required according to the plans submitted.
See site plan review.
See site plan review.
See site pear, review.
N/A
Not applicable.
Not required as submitted.
0
08/17/2009
08/17/2009
08/17/2009
08/17/2009
08/17/2009
08/17/2009
08/17/2009
08/17/2009
I
c. T Y 0
RE- — Tj'RG,
September 2, 2009
Permit Number: 09 00269
Project Name:
Project Type:
Review Item
I
Review Action
Beard St. flair Law Office
Commercial New
i,'n':"g
-staff
Review
......... .... .
Development Standards Review
Parcel'#'s
RPRO 0O
Actions Reruir
r
r ADDr
P.0 Box 280
19 E. Main St.
Rexburg, Idaho 8344D
Phone (208) 359-3020
Fax (2a8) 359-3022
At)r)rgved-
08/19/2009