HomeMy WebLinkAboutAPPLICATION - 21-00814 - 2943 W 3800 S - Strong Shed with Living SpaceMADISON COUNTY
Building Permit
Application Packet
Things to consider before Setting your building permit
Is your property buildable? Be sure to check with the Madison County Planning &
Zoning office that you can build your desired structure on your property. Factors like
acreage, zoning, structures, and land use can all affect what can or can't be built on your
property.
➢ Contact Madison County's Planning & Zoning Office at (208) 359-6259 for more
information
➢ Review the Madison County Code Book online at:
2. Is your property located in the county flood plain? Be sure to check FEMA's official
Madison County Flood Plain Map or meet with the Madison County Planning and
Zoning office to check if your property is in a flood plain. Flood plains can change the
way your structure may need to be built as well as your insurance premiums, so it is
crucial to know a) if your property is located in a flood plain and b) which flood zone.
➢ Checkout Idaho's official flood plain map:
➢ For more information on flood plains visit:
Are you able to obtain a septic permit? Be sure to visit with Eastern Idaho Public
Health Department to verify your septic system will be approved.
➢ Contact Eastern Idaho Public Health Department at (208) 356-3239 or visit their
office at 314 North 3rd East Rexburg, ID 83440
➢ For more information and resources, visit Eastern Idaho Public Health's website
at:
4. What are my setback requirements? Be sure you know what your property setbacks
requirements are. This information can be obtained from the Madison County Planning &
Zoning office, as your zoning can affect your setback requirements.
➢ Contact Madison County's Planning & Zoning Office at (208) 359-6259 for more
information
➢ Review the Madison County Code Book online at:
5. Do my building plans need to be engineered AND do they meet IRC requirements?
Depending on your structure type and building plans, you may be required to submit
engineered building plans for review. Visit with Madison County's building inspector if
you have any questions or concerns about your building plan requirements.
Contact Madison County's Building Inspector, David Decker, at (208) 521-3391
➢ Contact Madison County's Planning & Zoning Office at (208) 359-6259
➢ Review the IRC 2012 requirements at:
BUILDING PERMIT CHECKLIST
The following items are required to apply for a building permit:
Flood Plain — Verify if property is in flood plain. If yes, the following will be required:
l' Flood Plain Development Permit - must be obtained from and submitted to the Planning and
Zoning Department
A Preliminary Elevation Certificate is required to be submitted before you receive your building
permit. Before a Certificate of Occupancy is issued, a Final Elevation Certificate must also be
submitted. Contact an engineering fam to complete this.
,L2' Recorded Warranty Deed — this information can be obtained from the Clerk's Office
Approved Driveway Access Permit - can be obtained from the Madison County Road & Bridge Office All+
Approved Septic Permit —can be obtained from Easter Idaho Public Health Office
Three Sets of Plans —one electronic copy (PDF format) and two physical copies (must be drawn to scale
of no smaller than 1/8" = F plans must be 11" x 17" or larger)
JZ( Cross Sections
Elevations
Full Foundation drawing //
Electrical Plan showing the location of smoke awrias/detectors �7 b U t
Window & door schedule
Pr Include Engineered Truss Design
pr ` Include Engineered Floor Layout Design
j2r Site Plan— showing setbacks, well, septic, property lines, driveway, etc.
Copy of the Building Contractor's State Registration
Res Check Compliance Certificate or Climate 6 Prescriptive Method -required for all homes. Res
Check Certificate can be obtained from your insulator.
�i Permit Fee Payment — due upon receiving Building Permit
The review process will require up to ten (10) working days (net including the day the application is submitted). Once
approved, our office will notify you when the permit is ready. Payment, in full, for the building permit is required at
the time the permit is picked up.
The inspector also requires a minimum of twenty-four (24) hour advance notice for all inspections.
To schedule an inspection, please call Madison County's Building Department at (208) 359-6259
Other Contacts and State Inspectors Contact Information:
Madison County Road & Bridge — (208) 356-3101— for access permit information
Easter Idaho Public Health— (208) 356-3239 — for septic permit information
Idaho Department of Water Resources — (208) 525-7161—for well drilling information
Mechanical Inspections — City of Rexburg (208) 372-2344
State Plumbing Inspector —Bryce Colark (208) 821-1312
State Electrical Inspector —Aaron Reynolds (208) 360-2502
MADISON COUNTY PLANNING & ZONING
134 E Main Street Suite 208 Rexburg Idaho 83440
Phone:(208)359-6259 Fax:(208)356-6308
BUILDING PERMIT APPLICATION
SUBNIITTALS:
The review process will require up to 10 working days (not including the day the application is submitted). All
information called for on this form shall be required for a complete application and no incomplete application will
begin the review process.
GENERAL INFORMATION
Building Permit No:
Issue Date: By:
Proposed Use of Permit:
Surfaces: (shall include the dxterior wall measurements of the building)
Residential: *An" 3101AO
Finished Basement:
Bonus Room Finished:
Garage:
Unfinished Basement:
Bonus Room Unfinished:
Closed Shop: 1400 Open Shop/Shed:
Commercial:
Other (specify):
Value: $ ; I
PARCEL INFORMATION
Parcel Number:
Property Address (if applicable): 1-�rj `.a 3,&Wc, Sov�
City: R--e "a State: VD Zip: ` 'SLk 10
MADISON COUNTY PLANNING & ZONING
134 E Main Street Suite 208 Rexburg Idaho 83440
Phone:(208)359-6259 Fax:(208)356-6308
Quarter: Section:
Township:
Range:
Are you located in a subdivision? Yes J No
If yes, does your subdivision have covenants? Yes V (Please Provide a Dopy) No
Subdivision: Vwq,v.,e5 �� Lot: G Block:
By signing here, you herby certify thatyour building project does not violate any covenants set by your subdivision.
I understand that Madison County is not liable for any building project that violates said covenants.
Owner Signature Date
Zone: t-G% o f Area of City Impact:
Total Acreage:
Are there slopes more than 25%? N
Are there slopes 15-30%? A,/Dt
Are wetlands contained on the Property? A/,/,A
Does the property contain any streams, rivers or lakes?
Are you in a floodplain? A/ /A If yes, which zone?
Flood Plain Permit #:
If you desire to build in a flood zone you must obtain a Flood Elevation Certificate and a Flood Plain
DevelopmentPermitfrom the Building Department, have your land surveyed to determine the flood
elevation, and submit the completed certificate, signed by the surveyor. A review process will be
conducted by Madison County's Flood Plain Administrator, to obtain his approval and signature. Once
that process it completed and you have the Flood Plain Administrator's approval, you will be granted a
building permit.
CONTACT INFORMATION
OWNER:
Name
Address: 33f, Al 1A
City: %tm State:'_ Zip: K ,W e,
Phone: �,�-ate,- I SC&
Email: iv.[. SS Cows
MADISON COUNTY PLANNING & ZONING
134 E Main Street Suite 208 Rexburg Idaho 83440
Phone:(208)359-6259 Fax:(208)356-6308
CONTRACTOR:
+r 96-ITWTMWFIAM = W -
License No.: _ ACE - rj Exp. Date:
Address: /31)S S. /Z-A,
City:
Phone:
Email: /ak,%Q
State: �_ Zip: 19 WO
Applicant's signature certification and authorization:
Under penalty of perjury, I hereby certify that I have read this application and state that the
information herein is correct and I swear that any information which may hereafter be given by
me in hearing before the Madison County Building Department shall be truthful and correct. I
agree to comply with all County regulations and State laws relating to the subject matter of this
application and hereby authorize representative of Madison County to enter upon the above-
mentiioned propertyfor inspection purposes. NOTE. The building official may revoke a permit on
approval issued under the provisions of the 2012 International Codes in case of arty false
statements or misrepresentation offact in the application on which the permit or approval was
based
Owner Signature Date
d� i0 7-Z,82-1
Contractor Signature Date
Building Department Date