Loading...
HomeMy WebLinkAboutCOMCHECK - 21-0028 - 2907 Mendoza Dr - Mendoza shopGenerated by COMcheck-Web Software Envelope Compliance Certificate Section 1: Project Information Energy Code: 20091ECC Project Title: Project Type: New Construction Construction Site: Mendoza Farms Building Location (for weather data): Climate Zone: Vertical Glazing / Wall Area Pct.: Building Use: Activity Typgtsj 1-Warehouse : Nonresidential Owner/Agent: Rexburg, Idaho 6b 9% Floor Area 6000 Designer/Contractor: MHB Construction, Inc.: Section 2: Envelope Assemblies and Requirements Checklist 0 Envelope Assemblies: Component Name/Description Gross Cavity Cont. R- Proposed Budget U- Area or R-Value Value U-Factor Factorrat Perimeter Roof: Metal Building, Screw Down, [Bldg. Use 1 - Warehouse] 6000 0.0 30.0 0.032 0.049 Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber 4800 0.0 19.0 0.050 0.069 (compressed at girt), [Bldg. Use 1 - Warehouse] Door: Uninsulated Double -Layer Metal, Swinging, [Bldg. Use 1 - 42 --- --- 0.090 0.700 Warehouse] Door: Insulated Metal, Non -Swinging, [Bldg. Use 1 - Warehouse] 392 --- --- 0.100 0.500 Floor: Unheated Slab -On -Grade, [Bldg. Use 1 - Warehouse] 340 --- --- --- --- (a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. El 2. Windows, doors, and skylights certified as meeting leakage requirements. O 3. Component R-values & U-factors labeled as cerfified. El 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. O 5. 'Other' components have supporting documentation for proposed U-Factors. El 6. Insulation installed according to manufacturers instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation. El 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. 8. Cargo doom and loading dock doors are weather sealed. 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk. 10.Building entrance doom have a vestibule equipped with self -closing devices. Exceptions: Building entrances with revolving doors. Doors not intended to be used as a building entrance. Doors that open directly from a space less than 3000 sq. ft. in area. Doors used pnmanly to facilitate vehicular movement or materials handling and adjacent personnel doors. Project Title: Report date: 10/12/21 Data filename: Page 1 of 7 Doors opening directly from a sleeping/dwe I ling unit. Section 3: Compliance Statement Compliance Statement The proposed envelope design represented in this document is consistentwith the building plans, specifications and other calculafions submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. Mike Byers - CEO, MHB Construction, Inc Michael &as October 12, 2021 Name - Title Signature Date Project Title: Report date: 10/12/21 Data filename: Page 2 of 7