HomeMy WebLinkAboutCOMCHECK - 21-0028 - 2907 Mendoza Dr - Mendoza shopGenerated by COMcheck-Web Software
Envelope Compliance Certificate
Section 1: Project Information
Energy Code: 20091ECC
Project Title:
Project Type: New Construction
Construction Site: Mendoza Farms
Building Location (for weather data):
Climate Zone:
Vertical Glazing / Wall Area Pct.:
Building Use: Activity Typgtsj
1-Warehouse : Nonresidential
Owner/Agent:
Rexburg, Idaho
6b
9%
Floor Area
6000
Designer/Contractor: MHB Construction, Inc.:
Section 2: Envelope Assemblies and Requirements Checklist
0
Envelope Assemblies:
Component Name/Description Gross Cavity Cont. R- Proposed Budget U-
Area or R-Value Value U-Factor Factorrat
Perimeter
Roof: Metal Building, Screw Down, [Bldg. Use 1 - Warehouse]
6000
0.0 30.0 0.032
0.049
Ext. Wall: Metal Building Wall, Single Layer Mineral Fiber
4800
0.0 19.0 0.050
0.069
(compressed at girt), [Bldg. Use 1 - Warehouse]
Door: Uninsulated Double -Layer Metal, Swinging, [Bldg. Use 1 -
42
--- --- 0.090
0.700
Warehouse]
Door: Insulated Metal, Non -Swinging, [Bldg. Use 1 - Warehouse]
392
--- --- 0.100
0.500
Floor: Unheated Slab -On -Grade, [Bldg. Use 1 - Warehouse]
340
--- --- ---
---
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
El 2. Windows, doors, and skylights certified as meeting leakage requirements.
O 3. Component R-values & U-factors labeled as cerfified.
El 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels.
O 5. 'Other' components have supporting documentation for proposed U-Factors.
El 6. Insulation installed according to manufacturers instructions, in substantial contact with the surface being insulated, and in a manner that
achieves the rated R-value without compressing the insulation.
El 7. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
8. Cargo doom and loading dock doors are weather sealed.
9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283, are sealed with gasket or caulk.
10.Building entrance doom have a vestibule equipped with self -closing devices.
Exceptions:
Building entrances with revolving doors.
Doors not intended to be used as a building entrance.
Doors that open directly from a space less than 3000 sq. ft. in area.
Doors used pnmanly to facilitate vehicular movement or materials handling and adjacent personnel doors.
Project Title: Report date: 10/12/21
Data filename: Page 1 of 7
Doors opening directly from a sleeping/dwe I ling unit.
Section 3: Compliance Statement
Compliance Statement The proposed envelope design represented in this document is consistentwith the building plans, specifications
and other calculafions submitted with this permit application. The proposed envelope system has been designed to meet the 2009 IECC
requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist.
Mike Byers - CEO, MHB Construction, Inc Michael &as October 12, 2021
Name - Title Signature Date
Project Title: Report date: 10/12/21
Data filename: Page 2 of 7