Loading...
HomeMy WebLinkAboutUTILITY PLACEMENT PLAN - 21-00791 - E 7TH N - MOVE HH TO ALIGN WITH BOX, SPLICE AND BURY CABLEE 7th North Note: Need to move HH to align with the X Box Need to splice bury the cable and remove ped 3 and 6 on the South side of the road Move ped 4 back 6” Move ped 5 back 1’ and raise 7th North, Rexburg CMS21138646 SHEET 1 OF 1 Splice bury the cable and remove peds Move 6” back N Move 1’ back and raise it Move HH to west of the X box SPEAKER NAME / Presentation 10/11/2021 3:00:05 PM 1