Loading...
HomeMy WebLinkAboutCONCRETE TEST 4 - 21-00119 - Adams Elementary School - AdditionFile name: 21020SB10062021EV BEBBBBE3-0026-496C-BAD1-9ED29AD9E180 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 21020 Cumulative Test Load Amount: 5.5 Project Name: Adam's Elementary Test Location: Interior slab around few spots inside the building Client: Madison School District Admixtures: NA Ticket Number: 9977 Contractor: Mills Concrete Supplier: Idaho Materials Mix Number: 3325605 Date: 9/7/2021 Cylinder Log #: 564 Field Test Results: Set #: 1 Slump (inches): 3.8 Slump Maximum (in): Entrained Air (%): 1.40 Entrained Air Spec. (%): Concrete Temperature (°F): 62 Ambient Temperature (°F): 45 Unit Weight (PCF): 146.14 Tested By: Y. Kabwika Date: 9/7/2021 Picked Up By: Yannick Kabwika Date: 9/7/2021 Time: 12:00 PM Max, Min Temperature 0 Previous Test Results: Cylinder ID: Break Age:Break Date: Diameter (in): Area (in^2: Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 9/14/2021 4.00 12.56 52800 4203.82 3,500.00 Type 6 Current Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: B 28 10/5/2021 4.00 12.6 70,485.0 5594.0 3,500.0 Type 2 C 28 10/5/2021 4.00 12.6 67,895.0 5388.5 3,500.0 Type 2 D 28 10/5/2021 4.00 12.6 69,795.0 5539.3 3,500.0 Type 2 Second Break Average: 5507 Date: 10/08/2021 Reviewed By: E. Vail Signature: