Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 3 - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Madison Baseball Field 20052 Madison School District JM Masonry 09/04/2020 warm, sunny 9:30 AM 77 12:30 PM I arrived on site at approximately 9:50 AM. I then started my inspection on the re-bar. They placed re-bar every fourth hole and across on th top cinder blocks and around the corner. After the re-bar inspection they began to pour the grout. They vibrated the holes with the re-bar to consolidate the grout. They then finished off the top Digitally signed by Jacob P Christensen Date: 2020.09.13 14:49:27 -06'00' N. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: