Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Madison Baseball Field
20052
Madison School District
J. W. Masonry 08/28/2020
Sunny
11:30 AM
82
2:00 PM
I arrived at the site at approximately 12:00 PM and began my observations. The grout placement did not
start for about half hour due to the workers being on a break. Once the grout was being place I observed
the placement by the method of a pump, and the consolidation with the use of a vibrator. I also observed
that there were reinforcements place every fourth hole in the blocks and the the re-bar was in the middle,
not directly touching the blocks. I observed the contractor stay withing conformance to the project
documents throughout the duration of the pour.
Digitally signed by Jacob P Christensen
Date: 2020.09.01 09:45:11 -06'00'8129697
grout placement grout reinforcement grout placement
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
grout placement