Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Madison Baseball Field 20052 Madison School District J. W. Masonry 08/28/2020 Sunny 11:30 AM 82 2:00 PM I arrived at the site at approximately 12:00 PM and began my observations. The grout placement did not start for about half hour due to the workers being on a break. Once the grout was being place I observed the placement by the method of a pump, and the consolidation with the use of a vibrator. I also observed that there were reinforcements place every fourth hole in the blocks and the the re-bar was in the middle, not directly touching the blocks. I observed the contractor stay withing conformance to the project documents throughout the duration of the pour. Digitally signed by Jacob P Christensen Date: 2020.09.01 09:45:11 -06'00'8129697 grout placement grout reinforcement grout placement L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: grout placement