HomeMy WebLinkAboutSPECIAL INSPECTION - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Madison Baseball Field
20052
Madison School District
Mills Concrete 08/26/2020
Clear
8:00 AM
59
10:00 AM
I arrived on site at approximately 8:00 AM and observed that the steel reinforcement placement for the
East dugout on the North West field and the North dugout on the South West field was in general
accordance to project documents. I then observed the grout pour for the same two dugouts for the duration
of the pour. I observed that the grout was vibrated for each and every vertical steel reinforcement in
general conformance to project documents.
William Moffat Digitally signed by William Moffat Date: 2020.08.27 08:09:31 -06'00'8129697
Reinforcement spaced every 32" Horizontal Reinforcement Grout vibration at vertical
reinforcement
W. Moffat
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Finished grout