Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Madison Baseball Field 20052 Madison School District Mills Concrete 08/17/2020 Cool and Sunny 5:00 AM 50.5 9:30 AM I arrived at the site at approximately 5:15 AM. I observed the contractor check the re-bar to make sure it was in good shape. I checked to see if all forms had re-bar. The truck showed up and we began our testing. The first truck had poured about 4 yards of concrete when we finished the air test. That truck failed the test with 3% air. They added air and continued on with the pour and used the concrete from that truck. The second truck also failed with 4% air but after adding air and a retest it passed with 5.5% air. I then observed the contractor finish the pour and smooth and float the top to finish it off. The contractor was in conformance with project documents. William Moffat Digitally signed by William Moffat Date: 2020.08.18 07:16:24 -06'00'8129697 Concrete Forums before pour Contractor beginning to pour concrete Concrete Forums before Pour L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: Concrete Placement Finishing top of Concrete