HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Madison Baseball Field
20052
Madison School District
Mills Concrete 08/17/2020
Cool and Sunny
5:00 AM
50.5
9:30 AM
I arrived at the site at approximately 5:15 AM. I observed the contractor check the re-bar to make sure it
was in good shape. I checked to see if all forms had re-bar. The truck showed up and we began our
testing. The first truck had poured about 4 yards of concrete when we finished the air test. That truck failed
the test with 3% air. They added air and continued on with the pour and used the concrete from that truck.
The second truck also failed with 4% air but after adding air and a retest it passed with 5.5% air. I then
observed the contractor finish the pour and smooth and float the top to finish it off. The contractor was in
conformance with project documents.
William Moffat Digitally signed by William Moffat Date: 2020.08.18 07:16:24 -06'00'8129697
Concrete Forums before pour Contractor beginning to pour concrete Concrete Forums before Pour
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Concrete Placement Finishing top of Concrete