HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Madison Baseball Field
20052
Madison School District
Mills Concrete 08-19-2020
Cloudy
1:00 PM
96.6
6:30 PM
I arrived on site to begin my observation of the Concrete Reinforcement and of the Concrete Placement. I
began my observation of the Concrete Reinforcement at the western dugout of the sw field and finished at
the northern dugout of the se field. I observed that the Concrete Reinforcement was in general
conformance with project documents.
I then observed the Concrete Placement. I observed that they used the chute of the truck to place the
concrete and that they used shovels and concrete placers to manually consolidate the concrete throughout
the placement. I observed through the end of the placement. I observed that it was in general conformance
with project documents.
William Moffat Digitally signed by William Moffat Date: 2020.08.20 07:33:22 -06'00'8129697
Concrete Reinforcement for northern
dugout in se field.
Consolidation using shovels. Placement, consolidation and
finishing.
L. Camarillo
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: