Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Madison Baseball Field 20052 Madison School District Mills Concrete 08-19-2020 Cloudy 1:00 PM 96.6 6:30 PM I arrived on site to begin my observation of the Concrete Reinforcement and of the Concrete Placement. I began my observation of the Concrete Reinforcement at the western dugout of the sw field and finished at the northern dugout of the se field. I observed that the Concrete Reinforcement was in general conformance with project documents. I then observed the Concrete Placement. I observed that they used the chute of the truck to place the concrete and that they used shovels and concrete placers to manually consolidate the concrete throughout the placement. I observed through the end of the placement. I observed that it was in general conformance with project documents. William Moffat Digitally signed by William Moffat Date: 2020.08.20 07:33:22 -06'00'8129697 Concrete Reinforcement for northern dugout in se field. Consolidation using shovels. Placement, consolidation and finishing. L. Camarillo Page 2 of 2 Description: Description: Description: Description: Additional Comments: