Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 20-00765 - Madison High School - Baseball-Softball DugoutsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description:Description:Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: MHS Baseball Field 20052 Madison School District Thompson Excavation 08/13/2020 Slightly Cloudy 5:00 AM 55 11:00 AM I arrived on site at approximately 5:45 AM. I tested the first truck and found that the entrained air content was low. I informed the contractor and the concrete truck driver and they added air. I tested the mix with the added air and found it to be within project specifications. I stayed for the duration of the concrete pour. I observed the contractor utilizing a vibrator to achieve compaction. William Moffat Digitally signed by William Moffat Date: 2020.08.14 07:14:30 -06'00'8129697 ● D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: