Loading...
HomeMy WebLinkAboutSTORTEK PROPOSAL - 21-00728 - 525 N 5th W - TWAS Tank Dome Cover.pdf Quote No: QL30326 Date: TO: ATTN: RE: City of Rexburg Aluminum Dome Cover Justin, We are pleased to offer our proposal for an aluminum dome cover to be placed on an existing 24’-7 3/8” diameter x 24’-9 13/16” H tank located in Rexburg, ID. We have included all materials, labor and equipment necessary for a complete installation. Please review the following pages for details of our offering. Respectfully, Kenny Wade Kenny Wade StorTek, LLC (208) 989-9409 kenny@stortekllc.com Manufactured By torTekS Liquid and Dry Storage Experts PROPOSAL StorTek, LLC - 10720 Scotch Pines Rd, Payette, ID 83661 R2 6/9/2021 City of Rexburg 35 N. 1st East Rexburg, ID 83440 Justin Beard Page 2 GEOMETRY / DESCRIPTION Quantity Geodesic Dome(s): 1 Materials of Construction: Mill finish aluminum Dome Mounted To: Bolted steel tank Tank Inside Diameter: 24.62 feet 7.50 meters Tank Sidewall Height: 24.82 feet 7.57 meters Existing Eave Angle / Wind Girder Width: 7 inches (assumed) 178 millimeters Pier Support Type: Sliding Estimated Number of Piers: 8 DESIGN CRITERIA Design Specifications: AWWA D108-10 Wind Loads per ASCE 7-05: Velocity = 90 mph 145 KPH Category = 3, Exposure: C, I=1.15 Roof Live Load: 20 pounds per square foot 98 kilograms per square meter Ground Snow Load: 50 pounds per square foot 122 kilograms per square meter Product Stored: Wastewater Design Pressure / Vacuum: Atmospheric Operating Pressure / Vacuum: Atmospheric Design Temperature: Up to 110° Fahrenheit Up to 43° Celsius CUSTOMER IS RESPONSIBLE FOR VERIFYING THE CODES & VALUES SHOWN MEET ALL NECESSARY STATE / LOCAL REQUIREMENTS. MATERIALS / FASTENERS / SEALANTS / GASKETS Struts: AA6005A-T6 or AA6061-T6 aluminum Panels: 0.050 Inch nominal thickness – AA3003-H16 or H14 aluminum sheet Perimeter Tension / Compression Ring: AA6005A-T6 or AA6061-T6 aluminum Fasteners: AA2024-T4 aluminum, AA7075-T73 aluminum or austenitic series 300 stainless steel as required by design Dormers, Doors, and Hatches: AA6061-T6, AA6005A-T6, AA3003-H14, AA3003-H16 or AA5052-H34 aluminum Pier Attachment Hardware: Series 300 stainless steel Connection Gussets: AA6061-T6 or AA5052-H34 Sealant: Low modulus silicone Gasket: Extruded silicone strip gasket DOME COMPONENTS / ACCESSORIES NOTE:  All quantities noted below are per dome unless noted otherwise Mark: Qty.: Description: --- 1 30” Square access hatch – aluminum construction --- 1 20” Diameter ventilator with aluminum bird screen --- Incl. Aluminum counterflashing to the top of tank – Apex Domes standard design --- Incl. Personal fall protection system (harness and lanyard not included) – Includes center hoist ring with swivel mechanism with 3/8” diameter stainless steel wire rope, cable grab and karabiner – designed for 5,000 pound lateral load Page 3 PRICING SUMMARY ALL PRICES ARE IN U.S. DOLLARS $ ITEM 1 TERMS OF PAYMENT 30% of material due upon order placement Net 30 30% of material due prior to release for fabrication Net 30 40% of material due upon 1st shipment (or upon manufacture of tank(s), if shipment is delayed by customer) Net 30 Installation will be billed progressively every 14 days based on percentage of completion Due on Receipt Freight is Prepaid and Add Due on Receipt  No retainage is applicable unless previously agreed upon  All terms of payment are subject to approval by our credit department  Past due invoices will incur a service charge of 1.5% per month.  We reserve the right to delay tank erection if invoices are not paid in accordance with stated terms SCHEDULE Approval drawing submittal: 2 to 3 weeks after order placement Dispatch from TC factory: 8 to 10 weeks after receipt of all approved drawings and details IF THIS SCHEDULE IS NOT SATISFACTORY, EVERY EFFORT WILL BE MADE TO MEET YOUR REQUIREMENTS. PRICING VALIDITY ALUMINUM COSTS: Pricing validity: Price in effect EXCEPTIONS AND CLARIFICATONS / PAYMENT TERMS / SCHEDULE DOME MATERIAL & FREIGHT DOME INSTALLATION TOTAL ITEMS NOT INCLUDED  Supply of any appurtenances not specified herein.  Extra labor and materials required if the tank dimensions or site conditions are different than specified above.  Modification, if required, to avoid interference with walkways, handrail, piping or other equipment.  Building permits, bonds, licenses, fees or taxes other than specified herein.  Double handling of equipment, components and materials during mobilization, assembly, disassembly and demobilization.  Hole-watch, fire watch, or any related safety stand-by personnel.  Any work of any other trades, such as electrical, pipefitting, painting, ductwork, or miscellaneous metalwork (e.g. guardrails, platforms, etc.) unless specifically noted.  Tank shell analysis and / or wind girder design.  Sidewalls to elevate the dome above the top of the tank.  All stairways, walkways, platforms, handrailing, walkway grating, stairway grating, checkered plate, etc., unless specifically noted. $13,405 $34,400 $20,995