Loading...
HomeMy WebLinkAboutTRUSS SPECS - 20-00967 - 1228 Stone Dr - New SFRJob NEW PEAK - ROCKCHUCK1289 Truss A01 Truss Type Roof Special Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:29 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-ik9Lz9T8e1aiU5csYwm6YEMoGh7lrmo_AyWtXtzfAc0 Scale: 3/16"=1' T2 T3 B1 W8 W5 W4 W2 W1 W3 W6 W7T1 T4 B3B2A B C D E F G H L K J I 7x10 5x6 5x8 3x6 5x6 3x6 3x4 3x10 5x8 1.5x4 3x10 7-6-0 7-6-0 7-8-12 0-2-12 13-0-8 5-3-12 19-0-0 5-11-8 28-6-0 9-6-0 38-0-0 9-6-0 -2-0-0 2-0-0 7-8-12 7-8-12 13-0-8 5-3-12 19-0-0 5-11-8 25-4-0 6-4-0 31-8-0 6-4-0 38-0-0 6-4-0 0- 3 - 1 5 6- 7 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [F:0-4-0,0-3-4], [H:0-5-2,0-1-8], [I:0-4-0,0-3-0], [K:0-2-4,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.80 0.65 0.92 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.22 -0.38 0.07 0.13 (loc) H-I H-I H H-I l/defl >999 >965 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 165 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W5,W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 3-0-1 oc purlins. BOT CHORD Rigid ceiling directly applied or 5-0-13 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) L=2556/0-5-8 (min. 0-2-12), H=1334/Mechanical Max HorzL=135(LC 12) Max UpliftL=-777(LC 8), H=-308(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1128/1694, C-D=-838/233, D-E=-1389/368, E-F=-1403/360, F-G=-2788/692, G-H=-3352/876 BOT CHORD B-L=-1502/1161, K-L=-1427/1076, J-K=-39/742, I-J=-443/2195, H-I=-776/3120 WEBS C-L=-2399/1027, C-K=-942/2366, D-K=-1011/499, D-J=-330/664, E-J=-79/462, F-J=-1159/423, F-I=-110/624, G-I=-654/318 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) L=777, H=308. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss A02 Truss Type Roof Special Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:30 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-AwijAVUmPKjZ6FB35dHL4Rvz05VqaEb7PcGQ3KzfAc? Scale = 1:66.0 T2 T3 B1 W8 W5 W4 W2 W1 W3 W6 W7T1 T4 B3B2A B C D E F G H I M L K J 7x10 5x6 5x8 3x6 5x6 3x6 3x4 3x10 5x8 1.5x4 4x6 7-6-0 7-6-0 7-8-12 0-2-12 13-0-8 5-3-12 19-0-0 5-11-8 28-6-0 9-6-0 38-0-0 9-6-0 -2-0-0 2-0-0 7-8-12 7-8-12 13-0-8 5-3-12 19-0-0 5-11-8 25-4-0 6-4-0 31-8-0 6-4-0 38-0-0 6-4-0 40-0-0 2-0-0 0- 3 - 1 5 6- 7 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [F:0-4-0,0-3-4], [J:0-4-0,0-3-0], [L:0-2-4,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.80 0.53 0.89 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.20 -0.34 0.07 0.11 (loc) J-K J-K H J-K l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 168 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W5,W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 3-4-9 oc purlins. BOT CHORD Rigid ceiling directly applied or 5-0-13 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) M=2542/0-5-8 (min. 0-2-11), H=1523/0-5-8 (min. 0-1-10) Max HorzM=124(LC 16) Max UpliftM=-775(LC 8), H=-414(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1128/1694, C-D=-818/226, D-E=-1363/358, E-F=-1378/346, F-G=-2672/627, G-H=-3197/781 BOT CHORD B-M=-1502/1161, L-M=-1428/1101, K-L=-26/724, J-K=-362/2133, H-J=-635/2941 WEBS C-M=-2384/1022, C-L=-936/2346, D-L=-1005/497, D-K=-327/656, E-K=-75/448, F-K=-1115/409, F-J=-84/547, G-J=-570/290 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) M=775, H=414. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss B01 Truss Type Roof Special Girder Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:31 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-e6G5OrVOAerQjPmFfLoadfR5rUqWJkQGeG?zcmzfAc_ Scale = 1:54.0 W1 T1 W1 B1 W2 W1 W2 W1 W2 W1 W2 W1 W2 W1 W2 T1 B1 T2A B C D E F G N M L K J I H O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR 6x12 MT20HS 6x8 6x8 6x12 MT20HS8x12 1.5x4 6x8 2x4 8x12 1.5x4 6x8 2x4 1.5x4 8x12 5-2-3 5-2-3 10-2-9 5-0-7 15-3-0 5-0-7 20-3-7 5-0-7 25-3-13 5-0-7 30-6-0 5-2-3 5-2-3 5-2-3 10-2-9 5-0-7 15-3-0 5-0-7 20-3-7 5-0-7 25-3-13 5-0-7 30-6-0 5-2-3 3- 6 - 4 Plate Offsets (X,Y)-- [C:0-3-12,0-3-4], [E:0-3-12,0-3-4], [H:0-5-8,Edge], [K:0-6-0,0-5-4] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.98 0.63 0.66 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.44 -0.62 0.11 0.32 (loc) K K H K l/defl >830 >585 n/a >999 L/d 360 240 n/a 240 PLATES MT20 MT20HS Weight: 177 lb FT = 20% GRIP 220/195 165/146 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x6 DF 1800F 1.6E or 2x6 DF SS WEBS 2x4 DF Stud/Std *Except* W2: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 1-8-3 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-14 oc bracing. WEBS 1 Row at midpt A-N, G-H, C-M, E-I MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) N=2656/Mechanical, H=2769/Mechanical Max UpliftN=-899(LC 4), H=-946(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-N=-2566/912, A-O=-3697/1258, O-P=-3697/1258, B-P=-3697/1258, B-Q=-3697/1258, Q-R=-3697/1258, R-S=-3697/1258, C-S=-3697/1258, C-T=-6558/2234, T-U=-6558/2234, D-U=-6558/2234, D-V=-6558/2234, V-W=-6558/2234, W-X=-6558/2234, E-X=-6558/2234, E-Y=-3702/1260, Y-Z=-3702/1260, F-Z=-3702/1260, F-AA=-3702/1260, AA-AB=-3702/1260, AB-AC=-3702/1260, G-AC=-3702/1260, G-H=-2660/970 BOT CHORD M-AF=-2004/5875, AF-AG=-2004/5875, AG-AH=-2004/5875, L-AH=-2004/5875, L-AI=-2004/5875, AI-AJ=-2004/5875, K-AJ=-2004/5875, K-AK=-2004/5877, AK-AL=-2004/5877, AL-AM=-2004/5877, J-AM=-2004/5877, J-AN=-2004/5877, AN-AO=-2004/5877, I-AO=-2004/5877 WEBS A-M=-1454/4285, B-M=-814/421, C-M=-2569/879, C-L=0/346, C-K=-271/805, D-K=-757/391, E-K=-270/802, E-J=0/346, E-I=-2565/878, F-I=-818/423, G-I=-1454/4288 NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 2) Provide adequate drainage to prevent water ponding. 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) N=899, H=946. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. Continued on page 2 Job NEW PEAK - ROCKCHUCK1289 Truss B01 Truss Type Roof Special Girder Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:31 2020 Page 2 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-e6G5OrVOAerQjPmFfLoadfR5rUqWJkQGeG?zcmzfAc_ NOTES- 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 135 lb down and 108 lb up at 1-9-12, 135 lb down and 108 lb up at 3-9-12, 135 lb down and 108 lb up at 5-9-12, 135 lb down and 108 lb up at 7-9-12, 135 lb down and 108 lb up at 9-9-12, 135 lb down and 108 lb up at 11-9-12, 135 lb down and 108 lb up at 13-9-12, 135 lb down and 108 lb up at 15-9-12, 135 lb down and 108 lb up at 17-9-12, 135 lb down and 108 lb up at 19-9-12, 135 lb down and 108 lb up at 21-9-12, 135 lb down and 108 lb up at 23-9-12, 135 lb down and 108 lb up at 25-9-12, and 135 lb down and 108 lb up at 27-9-12, and 154 lb down and 112 lb up at 29-9-12 on top chord, and 67 lb down at 1-9-12, 67 lb down at 3-9-12, 67 lb down at 5-9-12, 67 lb down at 7-9-12, 67 lb down at 9-9-12, 67 lb down at 11-9-12, 67 lb down at 13-9-12, 67 lb down at 15-9-12, 67 lb down at 17-9-12, 67 lb down at 19-9-12, 67 lb down at 21-9-12, 67 lb down at 23-9-12, 67 lb down at 25-9-12, and 67 lb down at 27-9-12, and 75 lb down at 29-9-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 10) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: A-G=-84, H-N=-14 Concentrated Loads (lb) Vert: O=-135(B) P=-135(B) Q=-135(B) R=-135(B) S=-135(B) T=-135(B) U=-135(B) V=-135(B) W=-135(B) X=-135(B) Y=-135(B) Z=-135(B) AA=-135(B) AB=-135(B) AC=-154(B) AD=-28(B) AE=-28(B) AF=-28(B) AG=-28(B) AH=-28(B) AI=-28(B) AJ=-28(B) AK=-28(B) AL=-28(B) AM=-28(B) AN=-28(B) AO=-28(B) AP=-28(B) AQ=-28(B) AR=-31(B) Job NEW PEAK - ROCKCHUCK1289 Truss B02 Truss Type Roof Special Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:31 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-e6G5OrVOAerQjPmFfLoadfR72UtDJj7GeG?zcmzfAc_ Scale = 1:51.9 T1 T2 W5 B1 W1 W2 W5 W2 W5 W2 W5 W2 W4 W3 T3 B3B2 A B C D E F L K J I H G 6x8 5x6 3x6 3x6 4x6 5x8 1.5x4 5x8 1.5x4 6x8 1.5x4 5x6 5-6-0 5-6-0 11-7-4 6-1-4 17-10-4 6-3-0 24-1-4 6-3-0 30-6-0 6-4-12 5-6-0 5-6-0 11-7-4 6-1-4 17-10-4 6-3-0 24-1-4 6-3-0 30-6-0 6-4-12 2- 9 - 1 5 4- 6 - 4 4- 7 - 1 5 4- 6 - 4 4.00 12 Plate Offsets (X,Y)-- [D:0-4-0,0-3-0], [H:0-3-12,0-3-0], [J:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.84 0.40 0.74 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.17 -0.26 0.06 0.10 (loc) I-J I-J G I-J l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 159 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W2: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 3-8-6 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 8-0-6 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) G=1480/Mechanical, L=1480/Mechanical Max HorzL=69(LC 12) Max UpliftG=-370(LC 8), L=-355(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-1678/436, B-C=-2567/700, C-D=-2564/698, D-E=-1817/478, E-F=-1817/478, F-G=-1437/408, A-L=-1445/401 BOT CHORD J-K=-453/1557, I-J=-700/2630, H-I=-700/2630 WEBS B-K=-654/228, B-J=-310/1307, C-J=-591/224, D-H=-982/268, E-H=-572/228, F-H=-568/2158, A-K=-393/1658 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) G=370, L=355. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss B03 Truss Type Roof Special Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:31 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-e6G5OrVOAerQjPmFfLoadfR6pUn?JlpGeG?zcmzfAc_ Scale = 1:51.9 T1 T2 T3 B1 W3 W2 W1 W2 W4 W6W7 W5 T4 B2 A B C D E F J I H G 2x4 4x6 6x8 7x10 5x6 3x10 3x6 1.5x4 6x8 3x10 8-6-0 8-6-0 14-6-0 6-0-0 22-6-0 8-0-0 30-6-0 8-0-0 4-3-0 4-3-0 8-6-0 4-3-0 14-6-0 6-0-0 22-6-0 8-0-0 30-6-0 8-0-0 2- 9 - 1 5 5- 6 - 4 5- 7 - 1 5 0- 3 - 1 5 5- 6 - 4 4.00 12 Plate Offsets (X,Y)-- [F:0-5-2,0-1-8], [H:0-2-8,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.92 0.79 0.63 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.27 -0.40 0.11 0.16 (loc) F-G F-G F F-G l/defl >999 >901 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 141 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W1,W4: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-9-15 oc bracing. WEBS 1 Row at midpt E-H, B-J MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) J=1484/Mechanical, F=1484/Mechanical Max HorzJ=-153(LC 13) Max UpliftJ=-308(LC 8), F=-340(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1864/568, C-D=-1719/566, D-E=-2403/699, E-F=-3731/1031 BOT CHORD I-J=-273/1331, H-I=-465/2161, G-H=-912/3437, F-G=-910/3443 WEBS B-I=-95/626, D-I=-712/190, D-H=-99/532, E-H=-1344/470, E-G=0/298, B-J=-1813/545 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) J=308, F=340. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss B04 Truss Type Roof Special Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:32 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-7JqTbBW0wyzHLZLRD2Kp9s_MRu8W27YQtwlX7CzfAbz Scale = 1:49.4 T1 T2 B1 W4 W2 W1 W3 W6 W7 W8 W5 T3 B3B2 A B C D E F J I H G 4x6 5x8 3x6 3x4 4x6 5x8 5x8 1.5x4 5x6 3x10 5-6-8 5-6-8 11-6-0 5-11-8 21-0-0 9-6-0 30-6-0 9-6-0 5-6-8 5-6-8 11-6-0 5-11-8 17-10-0 6-4-0 24-2-0 6-4-0 30-6-0 6-4-0 2- 9 - 1 5 6- 7 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [D:0-4-0,0-3-4], [F:0-5-2,0-1-8], [G:0-4-0,0-3-0], [H:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.61 0.71 0.92 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.25 -0.41 0.10 0.14 (loc) F-G F-G F F-G l/defl >999 >889 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 141 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 2-8-8 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-7-5 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) J=1484/Mechanical, F=1484/Mechanical Max HorzJ=-172(LC 13) Max UpliftJ=-283(LC 8), F=-324(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-1732/522, B-C=-1865/608, C-D=-1876/605, D-E=-3255/936, E-F=-3814/1117, A-J=-1443/452 BOT CHORD H-I=-336/1583, G-H=-675/2642, F-G=-1004/3557 WEBS B-I=-649/252, B-H=-164/346, C-H=-179/664, D-H=-1158/423, D-G=-107/622, E-G=-649/312, A-I=-483/1697 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) J=283, F=324. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss C01 Truss Type Roof Special Qty 4 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:32 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-7JqTbBW0wyzHLZLRD2Kp9s_K3uCp280QtwlX7CzfAbz Scale = 1:43.4 T1 T2 B1 W1 W3 W5 W6 W4 W2 T3 B2 A B C D E F I H G 5x6 5x8 1.5x4 5x8 3x10 1.5x4 5x6 4x6 5-11-8 5-11-8 15-5-8 9-6-0 24-11-8 9-6-0 5-11-8 5-11-8 12-3-8 6-4-0 18-7-8 6-4-0 24-11-8 6-4-0 26-11-8 2-0-0 4- 8 - 2 6- 7 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [C:0-4-0,0-3-4], [G:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.76 0.50 0.89 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.15 -0.27 0.06 0.08 (loc) G E-G E G-H l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 118 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 3-7-8 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 8-2-9 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) I=1196/0-5-8 (min. 0-1-8), E=1405/0-5-8 (min. 0-1-8) Max HorzI=-241(LC 9) Max UpliftI=-245(LC 9), E=-374(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-991/312, B-C=-1010/314, C-D=-2313/619, D-E=-2844/784, A-I=-1165/376 BOT CHORD G-H=-362/1787, E-G=-659/2609 WEBS C-H=-1120/409, C-G=-86/556, D-G=-580/289, A-H=-296/1062 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) I=245, E=374. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss C02 Truss Type Roof Special Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:33 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-bVOrpXWehF58zjwenmr2i4XVmIWqnazZ5aU4fezfAby Scale = 1:41.0 T1 T2 B1 W1 W3 W5 W6 W4 W2 T3 B2 A B C D E H G F 5x6 5x8 1.5x4 5x8 3x10 1.5x4 5x6 4x6 5-11-8 5-11-8 15-5-8 9-6-0 24-11-8 9-6-0 5-11-8 5-11-8 12-3-8 6-4-0 18-7-8 6-4-0 24-11-8 6-4-0 4- 8 - 2 6- 7 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [C:0-4-0,0-3-0], [F:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.76 0.58 0.91 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.17 -0.30 0.06 0.10 (loc) E-F E-F E E-F l/defl >999 >972 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 115 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 3-4-9 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 7-9-13 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) H=1205/0-5-8 (min. 0-1-8), E=1205/0-5-8 (min. 0-1-8) Max HorzH=-215(LC 13) Max UpliftH=-250(LC 9), E=-264(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-998/315, B-C=-1017/317, C-D=-2371/643, D-E=-2910/818, A-H=-1172/379 BOT CHORD F-G=-399/1813, E-F=-719/2695 WEBS C-G=-1143/418, C-F=-104/601, D-F=-620/305, A-G=-300/1070 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) H=250, E=264. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss C03 Truss Type Roof Special Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:33 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-bVOrpXWehF58zjwenmr2i4XVjIWTnalZ5aU4fezfAby Scale = 1:41.0 T1 T2 B1 W1 W3 W5 W6 W4 W2 T3 B2 A B C D E H G F 5x6 5x8 1.5x4 5x8 3x10 1.5x4 5x6 4x6 5-11-8 5-11-8 15-5-8 9-6-0 24-11-8 9-6-0 5-11-8 5-11-8 12-3-8 6-4-0 18-7-8 6-4-0 24-11-8 6-4-0 4- 8 - 2 6- 7 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [C:0-4-0,0-3-0], [E:0-1-6,Edge], [F:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.77 0.60 0.92 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.18 -0.33 0.06 0.11 (loc) E-F E-F E E-F l/defl >999 >906 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 115 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 3-3-3 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 7-8-6 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) H=1213/0-5-8 (min. 0-1-8), E=1213/Mechanical Max HorzH=-215(LC 13) Max UpliftH=-252(LC 9), E=-267(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-1006/317, B-C=-1024/319, C-D=-2415/654, D-E=-2982/838, A-H=-1180/382 BOT CHORD F-G=-405/1837, E-F=-741/2771 WEBS C-G=-1162/423, C-F=-112/631, D-F=-661/318, A-G=-302/1080 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) H=252, E=267. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss C04 Truss Type Roof Special Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:34 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-3hyE0tXGSZD?asUqKTMHEH3fwiqPWAgjKEEeC5zfAbx Scale = 1:41.4 W5 T1 T2 B1 W1 W1 W2 W3 W4 T3 B2 A B C D E H G FI J 3x6 1.5x4 4x8 7x10 3x4 7x10 1.5x4 3x10 8-11-8 8-11-8 16-11-8 8-0-0 24-11-8 8-0-0 4-7-8 4-7-8 8-11-8 4-4-0 16-11-8 8-0-0 24-11-8 8-0-0 5- 6 - 4 5- 7 - 1 5 0- 3 - 1 5 5- 6 - 4 4.00 12 Plate Offsets (X,Y)-- [E:0-5-2,0-1-8], [G:0-4-12,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.80 0.69 0.37 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.21 -0.34 0.07 0.13 (loc) E-F E-F E E-F l/defl >999 >883 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 114 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std *Except* W3: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 2-7-4 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 8-2-0 oc bracing. WEBS 1 Row at midpt B-H, D-G MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) H=1213/0-5-8 (min. 0-1-8), E=1213/Mechanical Max HorzH=-215(LC 13) Max UpliftH=-320(LC 9), E=-274(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1378/416, C-D=-1563/391, D-E=-2891/739 BOT CHORD H-I=-41/863, I-J=-41/863, G-J=-41/863, F-G=-635/2644, E-F=-634/2649 WEBS B-H=-1302/420, B-G=-214/773, D-G=-1348/490, D-F=0/270 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 7.0psf. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) H=320, E=274. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss C05 Truss Type Roof Special Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:34 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-3hyE0tXGSZD?asUqKTMHEH3dMipmW7FjKEEeC5zfAbx Scale = 1:41.7 W5 T1 T2 B1 W1 W5 W1 W2 W3 W4 B2 A B C D E I H G F 4x4 2x4 4x6 3x10 3x10 1.5x4 5x8 3x4 1.5x4 6-1-8 6-1-8 11-11-8 5-10-0 16-11-8 5-0-0 24-11-8 8-0-0 6-1-8 6-1-8 11-11-8 5-10-0 16-11-8 5-0-0 24-11-8 8-0-0 4- 6 - 4 4- 7 - 1 5 0- 3 - 1 5 4- 6 - 4 4.00 12 Plate Offsets (X,Y)-- [E:0-5-2,0-1-8], [G:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.90 0.73 0.52 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.22 -0.34 0.07 0.13 (loc) E-F E-F E E-F l/defl >999 >867 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 114 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Sheathed or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 8-1-10 oc bracing. WEBS 1 Row at midpt B-I MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) I=1213/0-5-8 (min. 0-1-8), E=1213/Mechanical Max HorzI=-174(LC 13) Max UpliftI=-312(LC 9), E=-282(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1775/528, C-D=-1954/535, D-E=-2857/739 BOT CHORD H-I=-202/1385, G-H=-202/1385, F-G=-630/2611, E-F=-630/2611 WEBS B-I=-1666/473, B-G=-163/474, D-G=-950/337 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) I=312, E=282. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss C06 Truss Type Roof Special Girder Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:35 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-XuWcDCYuDtLrC030uBtWnVcob6DAFWGsZu_BkXzfAbw Scale = 1:41.4 W1 T1 W1 B1 W2 W1 W2 W1 W2 W1 W2 W1 W2 T2 B2 A B C D E F L K J I H G M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ 4x12 5x8 3x4 6x8 6x12 1.5x4 5x8 2x4 7x10 1.5x4 2x4 5x8 5-0-15 5-0-15 10-0-2 4-11-3 14-11-6 4-11-3 19-10-9 4-11-3 24-11-8 5-0-15 5-0-15 5-0-15 10-0-2 4-11-3 14-11-6 4-11-3 19-10-9 4-11-3 24-11-8 5-0-15 3- 6 - 4 Plate Offsets (X,Y)-- [C:0-4-0,0-3-4], [G:Edge,0-4-4], [I:0-5-0,0-4-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.94 0.46 0.73 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.21 -0.30 0.06 0.16 (loc) I-J I-J G I-J l/defl >999 >975 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 146 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x6 DF 1800F 1.6E or 2x6 DF SS WEBS 2x4 DF Stud/Std *Except* W2: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 2-10-4 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 7-1-10 oc bracing. WEBS 1 Row at midpt E-G MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) L=2192/0-5-8 (min. 0-2-5), G=2179/Mechanical Max UpliftL=-745(LC 4), G=-739(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-L=-2104/763, A-M=-2867/976, M-N=-2867/976, B-N=-2867/976, B-O=-2867/976, O-P=-2867/976, P-Q=-2867/976, C-Q=-2867/976, C-R=-4231/1441, R-S=-4231/1441, D-S=-4231/1441, D-T=-4231/1441, T-U=-4231/1441, U-V=-4231/1441, E-V=-4231/1441, F-G=-297/146 BOT CHORD K-AA=-1453/4259, AA-AB=-1453/4259, AB-AC=-1453/4259, J-AC=-1453/4259, J-AD=-1453/4259, AD-AE=-1453/4259, I-AE=-1453/4259, I-AF=-985/2889, AF-AG=-985/2889, AG-AH=-985/2889, H-AH=-985/2889, H-AI=-985/2889, AI-AJ=-985/2889, G-AJ=-985/2889 WEBS A-K=-1129/3332, B-K=-802/415, C-K=-1651/566, C-J=0/335, D-I=-726/373, E-I=-541/1592, E-H=0/363, E-G=-3364/1143 NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) L=745, G=739. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 135 lb down and 108 lb up at 1-4-12 , 135 lb down and 108 lb up at 3-4-12, 135 lb down and 108 lb up at 5-4-12, 135 lb down and 108 lb up at 7-4-12, 135 lb down and 108 lb up at 9-4-12, 135 lb down and 108 lb up at 11-4-12, 135 lb down and 108 lb up at 13-4-12, 135 lb down and 108 lb up at 15-4-12, 135 lb down and 108 lb up at 17-4-12, 135 lb down and 108 lb up at 19-4-12, and 135 lb down and 108 lb up at 21-4-12, and 135 lb down and 108 lb up at 23-4-12 on top chord, and 67 lb down at 1-4-12, 67 lb down at 3-4-12, 67 lb down at 5-4-12, 67 lb down at 7-4-12, 67 lb down at 9-4-12, 67 lb down at 11-4-12, 67 lb down at 13-4-12, 67 lb down at 15-4-12, 67 lb down at 17-4-12, 67 lb down at 19-4-12, and 67 lb down at 21-4-12, and 67 lb down at 23-4-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) StandardContinued on page 2 Job NEW PEAK - ROCKCHUCK1289 Truss C06 Truss Type Roof Special Girder Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:35 2020 Page 2 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-XuWcDCYuDtLrC030uBtWnVcob6DAFWGsZu_BkXzfAbw LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: A-F=-84, G-L=-14 Concentrated Loads (lb) Vert: M=-135(F) N=-135(F) O=-135(F) P=-135(F) Q=-135(F) R=-135(F) S=-135(F) T=-135(F) U=-135(F) V=-135(F) W=-135(F) X=-135(F) Y=-28(F) Z=-28(F) AA=-28(F) AB=-28(F) AC=-28(F) AD=-28(F) AE=-28(F) AF=-28(F) AG=-28(F) AH=-28(F) AI=-28(F) AJ=-28(F) Job NEW PEAK - ROCKCHUCK1289 Truss CJ01 Truss Type Diagonal Hip Girder Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:35 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-XuWcDCYuDtLrC030uBtWnVcn?6F2FbbsZu_BkXzfAbw Scale = 1:22.5 T1 W1 B1 W3 W2 HW1 A B C D E F I H G J K L M N O P Q 4x4 3x6 4x6 3x4 3x4 1.5x4 0-2-0 0-0-9 0-0-9 5-4-5 5-3-13 10-8-11 5-4-5 -3-7-4 3-7-4 5-4-5 5-4-5 10-8-11 5-4-5 0- 7 - 1 5 3- 7 - 1 0 3.33 12 Plate Offsets (X,Y)-- [B:0-3-9,0-3-2] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.97 0.34 0.39 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.03 -0.06 0.01 0.02 (loc) H-I H-I H H-I l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 51 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 2-8-11 BRACING- TOP CHORD Sheathed or 5-8-6 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) H=614/Mechanical, B=908/0-8-13 (min. 0-1-8) Max HorzB=171(LC 4) Max UpliftH=-206(LC 8), B=-336(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-913/198, C-J=-824/205, D-J=-779/203, E-H=-283/139 BOT CHORD B-N=-277/767, I-N=-277/767, I-O=-277/767, O-P=-277/767, P-Q=-277/767, H-Q=-277/767 WEBS D-I=0/255, D-H=-747/271 NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) H=206, B=336. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 24 lb down and 38 lb up at 3-6-6, 69 lb down and 111 lb up at 3-6-9, 23 lb down and 51 lb up at 5-11-6, and 85 lb down and 112 lb up at 7-1-10, and 52 lb down and 93 lb up at 8-4-4 on top chord, and 11 lb down at 3-6-6, 4 lb down at 3-6-9, 14 lb down at 5-11-6, and 59 lb down at 7-1-10, and 37 lb down at 8-4-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: A-E=-84, E-F=-84, B-G=-14 Concentrated Loads (lb) Vert: J=18(F) L=-85(B) M=-52(F) N=-1(B) O=-6(F) P=-24(B) Q=-15(F) Job NEW PEAK - ROCKCHUCK1289 Truss D01 Truss Type HIP GIRDER Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:36 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-?44_RYZX_ATiqAeCSuOlKi92kVXP_2d0nYjkGzzfAbv Scale = 1:43.9 T1 T2 T1 B1 W4 W3 W2 W1 W2 W3 W4 B2 A B C D E F G H L K J I M N 6x8 4x6 5x8 3x4 2x4 4x4 7x10 3x4 2x4 5x8 5-11-4 5-11-4 10-0-0 4-0-12 13-0-0 3-0-0 17-0-12 4-0-12 23-0-0 5-11-4 -2-0-0 2-0-0 5-11-4 5-11-4 10-0-0 4-0-12 13-0-0 3-0-0 17-0-12 4-0-12 23-0-0 5-11-4 25-0-0 2-0-0 0- 3 - 1 5 3- 6 - 4 3- 7 - 1 5 0- 3 - 1 5 3- 6 - 4 4.00 12 Plate Offsets (X,Y)-- [B:0-4-2,0-0-0], [G:0-4-2,0-0-0], [J:0-4-8,0-4-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.59 0.59 0.40 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.29 -0.40 0.10 0.19 (loc) J-K J-K G K l/defl >947 >671 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 116 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x6 DF 1800F 1.6E or 2x6 DF SS WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Sheathed or 2-6-7 oc purlins. BOT CHORD Rigid ceiling directly applied or 7-2-7 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) B=2128/0-5-8 (min. 0-2-4), G=2128/0-5-8 (min. 0-2-4) Max HorzB=70(LC 8) Max UpliftB=-684(LC 4), G=-684(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-5094/1508, C-D=-4664/1483, D-M=-4354/1424, E-M=-4354/1424, E-F=-4667/1483, F-G=-5093/1509 BOT CHORD B-L=-1404/4749, K-L=-1404/4749, K-N=-1317/4351, J-N=-1317/4351, I-J=-1340/4748, G-I=-1340/4748 WEBS C-K=-464/238, D-K=-234/915, E-J=-213/911, F-J=-464/242 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) B=684, G=684. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 168 lb down and 126 lb up at 10-0-0 , and 135 lb down and 126 lb up at 11-6-0, and 168 lb down and 126 lb up at 13-0-0 on top chord, and 616 lb down and 220 lb up at 10-0-0, and 67 lb down at 11-6-0, and 616 lb down and 220 lb up at 12-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: A-D=-84, D-E=-84, E-H=-84, B-G=-14 Concentrated Loads (lb) Vert: D=-135(F) E=-135(F) K=-616(F) J=-616(F) M=-135(F) N=-28(F) Job NEW PEAK - ROCKCHUCK1289 Truss D02 Truss Type Roof Special Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:36 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-?44_RYZX_ATiqAeCSuOlKi95SVaR_4W0nYjkGzzfAbv Scale = 1:42.5 T1 T1 B1 W1 W2 W1 W2 B2 A B C D E F G I H 4x6 3x6 5x6 1.5x4 3x4 1.5x4 3x6 7-8-0 7-8-0 15-4-0 7-8-0 23-0-0 7-8-0 -2-0-0 2-0-0 5-9-0 5-9-0 11-6-0 5-9-0 17-3-0 5-9-0 23-0-0 5-9-0 25-0-0 2-0-0 0- 3 - 1 5 4- 1 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [B:0-3-14,0-1-8], [F:0-3-14,0-1-8], [H:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.42 0.39 0.28 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.18 -0.27 0.07 0.09 (loc) H-I H-I F H-I l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 91 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Sheathed or 3-11-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 8-6-4 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) B=1296/0-5-8 (min. 0-1-8), F=1296/0-5-8 (min. 0-1-8) Max HorzB=80(LC 12) Max UpliftB=-338(LC 8), F=-338(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-2581/739, C-D=-2202/638, D-E=-2202/638, E-F=-2581/739 BOT CHORD B-I=-600/2365, H-I=-338/1578, F-H=-621/2365 WEBS D-H=-145/642, E-H=-517/246, D-I=-145/642, C-I=-517/246 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) B=338, F=338. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss D03 Truss Type ROOF SPECIAL GIRDER Qty 1 Ply 3 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:37 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-TGeMeua9lUbZRKDP0bv_swhGovrUjMW90CTIoQzfAbu Scale = 1:36.4 T1 T1 B1 W1 W2 W3 W4 W5 W2W3 W4W5 B1 A B C D E F G L K J I H M N O P Q R S T U V 4x12 5x6 4x12 7x10 3x6 8x12 3x4 2x4 3x6 8x12 3x4 2x4 3-10-0 3-10-0 7-8-0 3-10-0 11-6-0 3-10-0 15-4-0 3-10-0 19-2-0 3-10-0 23-0-0 3-10-0 3-10-0 3-10-0 7-8-0 3-10-0 11-6-0 3-10-0 15-4-0 3-10-0 19-2-0 3-10-0 23-0-0 3-10-0 0- 3 - 1 5 4- 1 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [A:0-6-0,0-1-11], [G:0-6-0,0-1-11], [I:0-3-8,0-4-0], [J:0-5-0,0-4-8], [K:0-3-8,0-4-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.44 0.73 1.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.32 -0.44 0.11 0.16 (loc) J-K J-K G J-K l/defl >857 >619 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 348 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x6 DF 1800F 1.6E or 2x6 DF SS WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Sheathed or 5-4-14 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) A=6655/0-5-8 (min. 0-2-6), G=7236/0-5-8 (min. 0-2-9) Max HorzA=-67(LC 32) Max UpliftA=-1328(LC 4), G=-1440(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-17650/3503, B-C=-15041/2986, C-D=-11360/2256, D-E=-11360/2256, E-F=-15125/3001, F-G=-17826/3536 BOT CHORD A-M=-3335/16664, L-M=-3335/16664, L-N=-3335/16664, K-N=-3335/16664, K-O=-2805/14252, O-P=-2805/14252, J-P=-2805/14252, J-Q=-2771/14331, Q-R=-2771/14331, I-R=-2771/14331, I-S=-3318/16834, S-T=-3318/16834, H-T=-3318/16834, H-U=-3318/16834, U-V=-3318/16834, G-V=-3318/16834 WEBS D-J=-1324/6818, E-J=-4315/922, E-I=-600/3169, F-I=-2668/578, F-H=-271/1561, C-J=-4220/905, C-K=-585/3090, B-K=-2573/558, B-L=-264/1511 NOTES- 1) Special connection required to distribute bottom chord loads equally between all plies. 2) 3-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 3 rows staggered at 0-4-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 3) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 4) Unbalanced roof live loads have been considered for this design. 5) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) A=1328, G=1440. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1056 lb down and 215 lb up at 2-0-12, 1056 lb down and 215 lb up at 4-0-12, 1056 lb down and 215 lb up at 6-0-12, 1064 lb down and 216 lb up at 8-0-12, 1064 lb down and 216 lb up at 10-0-12, 1064 lb down and 216 lb up at 12-0-12, 1064 lb down and 216 lb up at 14-0-12, 1064 lb down and 216 lb up at 16-0-12, 1064 lb down and 216 lb up at 18-0-12, and 1064 lb down and 216 lb up at 20-0-12, and 1066 lb down and 214 lb up at 22-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) StandardContinued on page 2 Job NEW PEAK - ROCKCHUCK1289 Truss D03 Truss Type ROOF SPECIAL GIRDER Qty 1 Ply 3 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:37 2020 Page 2 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-TGeMeua9lUbZRKDP0bv_swhGovrUjMW90CTIoQzfAbu LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: A-D=-84, D-G=-84, A-G=-14 Concentrated Loads (lb) Vert: L=-1056(B) M=-1056(B) N=-1056(B) O=-1064(B) P=-1064(B) Q=-1064(B) R=-1064(B) S=-1064(B) T=-1064(B) U=-1064(B) V=-1066(B) Job NEW PEAK - ROCKCHUCK1289 Truss E01 Truss Type Common Supported Gable Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:38 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-xTBksEanWojQ3UobZJRDP7ETKJMOS10IFsCrLszfAbt Scale = 1:41.3 T1 T1 B1 ST5 ST4 ST3 ST2 ST1 ST4 ST3 ST2 ST1HW1 HW1B1 A B C D E F G H I J K L M N O X W V U T S R Q P 4x4 3x4 3x4 5x6 3x4 3x4 22-0-0 22-0-0 -2-0-0 2-0-0 11-0-0 11-0-0 22-0-0 11-0-0 24-0-0 2-0-0 0- 7 - 1 5 6- 1 - 1 5 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-2-0,0-0-6], [N:0-2-0,0-0-6], [T:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.26 0.04 0.09 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.03 -0.04 0.00 (loc) O O N l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 115 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E OTHERS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 1-7-6, Right 2x4 DF Stud/Std -l 1-7-6 BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 22-0-0. (lb) - Max HorzB=115(LC 12) Max Uplift All uplift 100 lb or less at joint(s) B, U, V, W, X, S, R, Q, P, N Max Grav All reactions 250 lb or less at joint(s) T, U, V, W, X, S, R, Q, P except B=381(LC 1), N=381(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) B, U, V, W, X, S, R, Q, P, N. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss E02 Truss Type Common Qty 4 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:38 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-xTBksEanWojQ3UobZJRDP7EROJH0S?AIFsCrLszfAbt Scale = 1:38.1 T1 T2 B1 W1 W2 W1 W2 HW1 HW1 B2 A B C D E F G H J I 4x6 4x6 4x4 4x6 4x4 5x6 1.5x4 3x4 1.5x4 8-0-0 8-0-0 14-0-0 6-0-0 22-0-0 8-0-0 -2-0-0 2-0-0 5-6-0 5-6-0 11-0-0 5-6-0 16-6-0 5-6-0 22-0-0 5-6-0 0- 7 - 1 5 6- 1 - 1 5 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-3-8,0-1-6], [H:0-3-8,0-1-6], [I:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.39 0.32 0.21 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.07 -0.13 0.04 0.03 (loc) H-I H-I H I-J l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 102 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 3-0-4, Right 2x4 DF Stud/Std -l 3-0-4 BRACING- TOP CHORD Sheathed or 4-10-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) H=1070/Mechanical, B=1260/0-5-8 (min. 0-1-8) Max HorzB=127(LC 16) Max UpliftH=-201(LC 13), B=-260(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1757/500, C-D=-1557/520, D-E=-1450/487, E-F=-1471/496, F-G=-1584/531, G-H=-1759/516 BOT CHORD B-J=-368/1433, I-J=-167/1019, H-I=-384/1469 WEBS E-I=-141/473, F-I=-425/236, E-J=-124/438, D-J=-395/223 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) H=201, B=260. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss E03 Truss Type Common Qty 8 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:39 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-Pfl73abPH5rHheNn70ySxLndZjeTBSQSUWyOtIzfAbs Scale = 1:37.0 T1 T1 B1 W1 W2 W1 W2 HW1 HW1 B2 A B C D E F G I H 4x6 3x4 4x6 4x6 3x4 5x6 1.5x4 3x4 1.5x4 8-0-0 8-0-0 14-0-0 6-0-0 22-0-0 8-0-0 5-6-0 5-6-0 11-0-0 5-6-0 16-6-0 5-6-0 22-0-0 5-6-0 0- 7 - 1 5 6- 1 - 1 5 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [A:0-3-0,0-1-6], [G:0-3-8,0-1-6], [H:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.36 0.31 0.21 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.07 -0.13 0.04 0.03 (loc) A-I A-I G I l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 99 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 3-0-4, Right 2x4 DF Stud/Std -l 3-0-4 BRACING- TOP CHORD Sheathed or 4-10-12 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) A=1078/0-5-8 (min. 0-1-8), G=1078/Mechanical Max HorzA=103(LC 16) Max UpliftA=-202(LC 12), G=-202(LC 13) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-1775/523, B-C=-1601/538, C-D=-1487/502, D-E=-1487/502, E-F=-1600/538, F-G=-1775/523 BOT CHORD A-I=-389/1483, H-I=-173/1034, G-H=-389/1483 WEBS D-H=-138/472, E-H=-425/236, D-I=-138/472, C-I=-425/236 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) A=202, G=202. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss G02 Truss Type Common Supported Gable Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:39 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-Pfl73abPH5rHheNn70ySxLne3jiYBVkSUWyOtIzfAbs Scale = 1:33.6 T1 T1 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 HW1 HW1 B1 A B C D E F G H I J K L M T S R Q P O N 4x4 3x4 3x4 5x6 3x4 3x4 17-3-0 17-3-0 -2-0-0 2-0-0 8-7-8 8-7-8 17-3-0 8-7-8 19-3-0 2-0-0 0- 7 - 1 5 4- 1 1 - 1 1 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-2-0,0-0-6], [H:0-0-0,0-0-0], [I:0-0-0,0-0-0], [J:0-0-0,0-0-0], [L:0-2-0,0-0-6], [L:0-0-0,0-0-0], [Q:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.26 0.05 0.06 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.03 -0.04 0.00 (loc) M M L l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 86 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E OTHERS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 1-6-6, Right 2x4 DF Stud/Std -l 1-6-6 BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 17-3-0. (lb) - Max HorzB=94(LC 12) Max Uplift All uplift 100 lb or less at joint(s) B, R, S, T, P, O, N, L Max Grav All reactions 250 lb or less at joint(s) Q, R, S, T, P, O, N except B=368(LC 1), L=368(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) B, R, S, T, P, O, N, L. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss G03 Truss Type Common Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:40 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-urJVHwc12Pz8Ioy_hkThUYJpp7yQwwDbiAhyPlzfAbr Scale = 1:33.6 T1 T1 B1 W1 W2W2 HW1 HW1 B1 A B C D E F G H I J 4x6 4x6 3x4 5x8 1.5x4 1.5x4 4x6 3x4 8-7-8 8-7-8 17-3-0 8-7-8 -2-0-0 2-0-0 4-3-12 4-3-12 8-7-8 4-3-12 12-11-4 4-3-12 17-3-0 4-3-12 19-3-0 2-0-0 0- 7 - 1 5 4- 1 1 - 1 1 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-3-4,0-1-6], [H:0-0-0,0-0-0], [H:0-3-4,0-1-6], [J:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.26 0.33 0.17 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.07 -0.13 0.03 0.02 (loc) B-J B-J H J l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 81 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 2-4-1, Right 2x4 DF Stud/Std -l 2-4-1 BRACING- TOP CHORD Sheathed or 5-11-7 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) B=1019/0-5-8 (min. 0-1-8), H=1019/0-5-8 (min. 0-1-8) Max HorzB=94(LC 16) Max UpliftB=-215(LC 12), H=-215(LC 13) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1296/368, C-D=-1201/382, D-E=-952/292, E-F=-952/292, F-G=-1200/382, G-H=-1296/368 BOT CHORD B-J=-217/1037, H-J=-230/1037 WEBS E-J=-87/392, F-J=-337/186, D-J=-337/186 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) B=215, H=215. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss G04 Truss Type Common Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:40 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-urJVHwc12Pz8Ioy_hkThUYJpp7yNww2biAhyPlzfAbr Scale = 1:31.2 T1 T2 B1 W1 W2W2 HW1 HW1 B1 A B C D E F G H I 4x6 4x6 3x4 4x6 3x4 5x8 1.5x4 1.5x4 8-7-8 8-7-8 17-3-0 8-7-8 -2-0-0 2-0-0 4-3-12 4-3-12 8-7-8 4-3-12 12-11-4 4-3-12 17-3-0 4-3-12 0- 7 - 1 5 4- 1 1 - 1 1 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-0-0,0-0-0], [B:0-3-4,0-1-6], [H:0-3-4,0-1-6], [I:0-4-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.26 0.33 0.18 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.07 -0.13 0.03 0.02 (loc) B-I H-I H H-I l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 78 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 2-4-1, Right 2x4 DF Stud/Std -l 2-4-1 BRACING- TOP CHORD Sheathed or 5-10-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) H=835/0-5-8 (min. 0-1-8), B=1029/0-5-8 (min. 0-1-8) Max HorzB=106(LC 16) Max UpliftH=-157(LC 13), B=-216(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-1317/386, C-D=-1222/400, D-E=-974/311, E-F=-977/312, F-G=-1188/412, G-H=-1325/396 BOT CHORD B-I=-272/1055, H-I=-290/1098 WEBS E-I=-109/418, F-I=-384/205, D-I=-336/184 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) H=157, B=216. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss G05 Truss Type COMMON GIRDER Qty 1 Ply 2 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:41 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-M2ttUGdfpj5?wxXAFR_w1mssLWAxfHMlxqRVxBzfAbq Scale = 1:31.2 T1 T2 B1 W1 W2 W3 W4 W5 W2W3 W4W5 HW2 B2 HW1 A B C D E F G H I N M L K J O P Q R 4x6 7x10 7x10 6x8 7x10 7x10 4x6 4x4 2x4 4x6 6x8 3x4 2x4 3-0-6 3-0-6 6-0-12 3-0-6 8-7-8 2-6-12 11-2-4 2-6-12 14-2-10 3-0-6 17-3-0 3-0-6 -2-0-0 2-0-0 3-0-6 3-0-6 6-0-12 3-0-6 8-7-8 2-6-12 11-2-4 2-6-12 14-2-10 3-0-6 17-3-0 3-0-6 0- 7 - 1 5 4- 1 1 - 1 1 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-0-14,0-1-11], [I:1-0-10,0-5-8], [I:0-1-13,0-1-12], [I:0-5-8,0-2-12], [K:0-5-0,0-4-8], [L:0-5-0,0-4-4], [M:0-3-8,0-4-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.79 0.88 0.56 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.13 -0.18 0.06 0.08 (loc) K-L K-L I L-M l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 213 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x6 DF 1800F 1.6E or 2x6 DF SS WEBS 2x4 DF Stud/Std *Except* W1: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEDGE Left: 2x4 DF Stud/Std SLIDER Right 2x6 DF SS or 1800F 1.6E -l 1-6-0 BRACING- TOP CHORD Sheathed or 3-2-15 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) I=6817/0-5-8 (min. 0-3-10), B=4972/0-5-8 (min. 0-2-10) Max HorzB=107(LC 12) Max UpliftI=-1673(LC 9), B=-1360(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-8299/2243, C-D=-8771/2422, D-E=-7151/1921, E-F=-7176/1919, F-G=-8942/2276, G-H=-10032/2489, H-I=-10025/2460 BOT CHORD B-N=-1927/6936, M-N=-1927/6936, M-O=-2139/7803, L-O=-2139/7803, L-P=-1958/8000, K-P=-1958/8000, K-Q=-2103/8663, J-Q=-2103/8663, J-R=-2103/8663, I-R=-2103/8663 WEBS E-L=-1641/6114, F-L=-2665/640, F-K=-548/2558, G-K=-816/189, G-J=-292/1417, D-L=-2346/842, D-M=-812/2377, C-M=-336/1058 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-3-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) I=1673, B=1360. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 2754 lb down and 960 lb up at 6-0-12, 1466 lb down and 384 lb up at 8-0-12, 1470 lb down and 354 lb up at 10-0-12, 1470 lb down and 338 lb up at 12-0-12, and 1470 lb down and 338 lb up at 14-0-12, and 1320 lb down and 321 lb up at 16-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) StandardContinued on page 2 Job NEW PEAK - ROCKCHUCK1289 Truss G05 Truss Type COMMON GIRDER Qty 1 Ply 2 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:41 2020 Page 2 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-M2ttUGdfpj5?wxXAFR_w1mssLWAxfHMlxqRVxBzfAbq LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: A-E=-84, E-I=-84, B-I=-14 Concentrated Loads (lb) Vert: J=-1470(F) M=-2754(F) O=-1466(F) P=-1470(F) Q=-1470(F) R=-1320(F) Job NEW PEAK - ROCKCHUCK1289 Truss H01 Truss Type Common Supported Gable Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:41 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-M2ttUGdfpj5?wxXAFR_w1ms_ZWN?fPTlxqRVxBzfAbq Scale = 1:27.0 T1 T1 B1 ST3 ST2 ST1 ST2 ST1 HW1 HW1 A B C D E F G H I J K P O N M L 4x4 3x4 3x4 3x4 3x4 13-0-0 13-0-0 -2-0-0 2-0-0 6-6-0 6-6-0 13-0-0 6-6-0 15-0-0 2-0-0 0- 7 - 1 5 3- 1 0 - 1 5 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-2-0,0-0-6], [J:0-2-0,0-0-6] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.26 0.05 0.05 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.03 -0.04 0.00 (loc) K K J l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 62 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E OTHERS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 1-6-6, Right 2x4 DF Stud/Std -l 1-6-6 BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 13-0-0. (lb) - Max HorzB=-75(LC 17) Max Uplift All uplift 100 lb or less at joint(s) B, J, O, P, M, L Max Grav All reactions 250 lb or less at joint(s) N, O, P, M, L except B=364(LC 23), J=364(LC 24) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) B, J, O, P, M, L. 10) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) J. 11) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss H02 Truss Type Common Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:42 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-qERFicdHa0DsY56Mo9V9ZzP5LwfzOrwuAUA3UdzfAbp Scale = 1:24.5 T1 T2 B1 W1 HW1 HW1A B C D E F G 3x6 3x4 3x4 4x6 3x6 3x4 3x4 1.5x4 6-6-0 6-6-0 13-0-0 6-6-0 6-6-0 6-6-0 13-0-0 6-6-0 15-0-0 2-0-0 0- 7 - 1 5 3- 1 0 - 1 5 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [A:0-2-12,0-1-14], [E:0-3-4,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.52 0.26 0.10 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.06 -0.08 0.01 0.03 (loc) A-G A-G E A-G l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 55 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 3-6-14, Right 2x4 DF Stud/Std -l 3-6-14 BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) A=623/0-5-8 (min. 0-1-8), E=824/0-5-8 (min. 0-1-8) Max HorzA=-87(LC 17) Max UpliftA=-117(LC 12), E=-178(LC 13) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-845/246, B-C=-691/259, C-D=-691/263, D-E=-856/252 BOT CHORD A-G=-90/618, E-G=-90/618 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) A=117, E=178. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss H03 Truss Type COMMON GIRDER Qty 1 Ply 2 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:42 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-qERFicdHa0DsY56Mo9V9ZzP3jwXhOg2uAUA3UdzfAbp Scale = 1:24.5 T1 T2 B1 W1 W2 W3W2W3A B C D E F I H GJ K L M 5x6 4x4 5x6 7x10 3x6 3x10 3x6 3x10 3-3-0 3-3-0 6-6-0 3-3-0 9-9-0 3-3-0 13-0-0 3-3-0 3-3-0 3-3-0 6-6-0 3-3-0 9-9-0 3-3-0 13-0-0 3-3-0 15-0-0 2-0-0 0- 7 - 1 5 3- 1 0 - 1 5 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [H:0-5-0,0-4-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.69 0.79 0.79 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.06 -0.08 0.03 0.04 (loc) H-I H-I E H-I l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 137 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x6 DF 1800F 1.6E or 2x6 DF SS WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Sheathed or 5-7-3 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) A=4425/0-5-8 (min. 0-2-6), E=2760/0-5-8 (min. 0-1-8) Max HorzA=-89(LC 9) Max UpliftA=-1121(LC 8), E=-767(LC 9) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD A-B=-6222/1617, B-C=-4394/1252, C-D=-4392/1259, D-E=-4403/1210 BOT CHORD A-J=-1378/5240, J-K=-1378/5240, I-K=-1378/5240, I-L=-1378/5240, H-L=-1378/5240, H-M=-976/3661, G-M=-976/3661, E-G=-976/3661 WEBS C-H=-1035/3587, D-H=-184/394, B-H=-1600/383, B-I=-384/1854 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-4-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) A=1121, E=767. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1201 lb down and 279 lb up at 0-11-4, 1199 lb down and 288 lb up at 2-11-4, and 1199 lb down and 296 lb up at 4-11-4, and 2165 lb down and 753 lb up at 6-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: A-C=-84, C-F=-84, A-E=-14 Continued on page 2 Job NEW PEAK - ROCKCHUCK1289 Truss H03 Truss Type COMMON GIRDER Qty 1 Ply 2 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:42 2020 Page 2 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-qERFicdHa0DsY56Mo9V9ZzP3jwXhOg2uAUA3UdzfAbp LOAD CASE(S) Standard Concentrated Loads (lb) Vert: J=-1201(F) K=-1199(F) L=-1199(F) M=-2165(F) Job NEW PEAK - ROCKCHUCK1289 Truss HF-B1 Truss Type GABLE Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:43 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-IQ?dvxewLKLj9FhZMs0O6BxLaK267He2O8wc03zfAbo Scale = 1:50.8 W1 T1 T2 T3 T4 W2 B1 ST5 ST4 ST3 ST2 ST1ST1 ST4 ST3 ST6 ST6 ST6 ST6 ST6 ST6 ST6 B2 A B C D E F G H I J K L M N O P Q R S AJ AI AH AG AF AE AD AC AB AA Z Y X W V U T 2x4 2x4 3x4 4x4 3x4 5x6 30-6-0 30-6-0 4-4-8 4-4-8 11-6-0 7-1-8 16-6-12 5-0-12 30-6-0 13-11-4 1- 4 - 0 2- 1 0 - 8 6- 7 - 1 2 2- 1 0 - 8 8.94 12 Plate Offsets (X,Y)-- [AB:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-R 0.23 0.07 0.13 DEFL. Vert(LL) Vert(CT) Horz(CT) in n/a n/a -0.00 (loc) - - T l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 146 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std OTHERS 2x4 DF Stud/Std BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 30-6-0. (lb) - Max HorzAJ=133(LC 9) Max Uplift All uplift 100 lb or less at joint(s) T, AE, AG, AC, AB, AA, Z, Y, X, W, V, U except AJ=-102(LC 10), AF=-103(LC 12), AH=-101(LC 8), AI=-182(LC 12) Max Grav All reactions 250 lb or less at joint(s) AJ, T, AD, AE, AF, AG, AH, AI, AC, AB, AA, Z, Y, X, W, V, U FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Provide adequate drainage to prevent water ponding. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) T, AE, AG, AC, AB, AA, Z, Y, X, W, V, U except (jt=lb) AJ=102, AF=103, AH=101, AI=182. 9) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss J01 Truss Type Jack-Open Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:43 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-IQ?dvxewLKLj9FhZMs0O6BxJ7K2w7Jg2O8wc03zfAbo Scale = 1:11.6 T1 B1 A B C D 2x4 3-11-12 3-11-12 -2-0-0 2-0-0 3-11-12 3-11-12 0- 3 - 1 5 1- 7 - 1 4 1- 3 - 1 1 1- 7 - 1 4 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.32 0.08 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.01 -0.02 -0.00 0.00 (loc) B-D B-D C B l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 14 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BRACING- TOP CHORD Sheathed or 3-11-12 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) C=96/Mechanical, B=431/0-5-8 (min. 0-1-8), D=26/Mechanical Max HorzB=90(LC 8) Max UpliftC=-49(LC 12), B=-174(LC 8) Max GravC=96(LC 1), B=431(LC 1), D=63(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) C except (jt=lb) B=174. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss J02 Truss Type Jack-Open Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:44 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-mdZ06HfY6eTanPFlwaXdeOUPtkL6smvBdof9YWzfAbn Scale = 1:17.1 T1 B1 W1 A B C E D2x4 3x4 3x4 0-2-0 6-11-12 6-11-12 -2-0-0 2-0-0 6-9-12 6-9-12 6-11-12 0-2-0 0- 3 - 1 5 2- 7 - 1 4 2- 3 - 1 1 2- 7 - 1 4 4.00 12 Plate Offsets (X,Y)-- [C:0-2-13,0-0-8] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.58 0.28 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.09 -0.15 -0.00 0.00 (loc) B-E B-E C B l/defl >861 >507 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 25 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) B=540/0-5-8 (min. 0-1-8), E=50/Mechanical, C=237/Mechanical Max HorzB=127(LC 8) Max UpliftB=-186(LC 8), C=-109(LC 12) Max GravB=540(LC 1), E=120(LC 3), C=237(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) B=186, C=109. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss J03 Truss Type Jack-Open Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:44 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-mdZ06HfY6eTanPFlwaXdeOUUpkP7smvBdof9YWzfAbn Scale = 1:11.8 T1 B1 HW1 A B C D E2x4 3x4 1-11-10 1-11-10 -2-0-0 2-0-0 1-11-10 1-11-10 0- 7 - 1 5 1- 7 - 1 2 1- 3 - 1 1- 7 - 1 2 6.00 12 Plate Offsets (X,Y)-- [B:0-1-8,0-0-6] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.26 0.02 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.00 -0.00 -0.00 0.00 (loc) B B-E D B l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 11 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E SLIDER Left 2x4 DF Stud/Std -l 1-5-3 BRACING- TOP CHORD Sheathed or 1-11-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) D=-10/Mechanical, B=361/0-5-8 (min. 0-1-8), E=14/Mechanical Max HorzB=78(LC 12) Max UpliftD=-17(LC 12), B=-93(LC 12) Max GravD=13(LC 8), B=361(LC 1), E=33(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) D, B. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss J04 Truss Type Jack-Open Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:44 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-mdZ06HfY6eTanPFlwaXdeOUUpkPTsmvBdof9YWzfAbn Scale = 1:15.0 T1 B1 HW1 A B C D E 2x4 3x4 3-3-10 3-3-10 -2-0-0 2-0-0 3-3-10 3-3-10 0- 7 - 1 5 2- 3 - 1 2 6.00 12 Plate Offsets (X,Y)-- [B:0-1-8,0-0-6] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.26 0.06 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.01 -0.01 0.00 0.00 (loc) B-E B-E D B l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 15 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E SLIDER Left 2x4 DF Stud/Std -l 1-10-6 BRACING- TOP CHORD Sheathed or 3-3-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) D=81/Mechanical, B=387/0-5-8 (min. 0-1-8), E=23/Mechanical Max HorzB=104(LC 12) Max UpliftD=-57(LC 12), B=-89(LC 12) Max GravD=81(LC 1), B=387(LC 1), E=55(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) D, B. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss J05 Truss Type Jack-Open Qty 2 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:45 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-Ep6OKdgAsxcRPZqxUH3sBc1fY8jcbD9KsSPj4yzfAbm Scale = 1:18.2 T1 B1 HW1 A B C D E3x4 3x4 4-7-10 4-7-10 -2-0-0 2-0-0 4-7-10 4-7-10 0- 7 - 1 5 2- 1 1 - 1 2 2- 7 - 1 2- 1 1 - 1 2 6.00 12 Plate Offsets (X,Y)-- [B:0-1-8,0-0-6] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.26 0.13 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.02 -0.04 0.01 0.00 (loc) B-E B-E D B l/defl >999 >999 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 20 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E SLIDER Left 2x4 DF Stud/Std -l 2-7-5 BRACING- TOP CHORD Sheathed or 4-7-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) D=153/Mechanical, B=437/0-5-8 (min. 0-1-8), E=32/Mechanical Max HorzB=131(LC 12) Max UpliftD=-91(LC 12), B=-93(LC 12) Max GravD=153(LC 1), B=437(LC 1), E=78(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) D, B. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss J06 Truss Type Jack-Open Qty 30 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:46 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-i?gmXzhodFkI0jP71_a5kpZneX2GKgPU568GdOzfAbl Scale = 1:21.5 T1 B1 HW1 A B C D E3x4 3x4 3x4 6-0-0 6-0-0 -2-0-0 2-0-0 6-0-0 6-0-0 0- 7 - 1 5 3- 7 - 1 5 3- 3 - 4 3- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-1-8,0-0-6] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-P 0.50 0.23 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.07 -0.11 0.02 0.00 (loc) B-E B-E D B l/defl >999 >643 n/a **** L/d 360 240 n/a 240 PLATES MT20 Weight: 25 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E SLIDER Left 2x4 DF Stud/Std -l 3-4-8 BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) D=219/Mechanical, B=495/0-5-8 (min. 0-1-8), E=42/Mechanical Max HorzB=159(LC 12) Max UpliftD=-123(LC 12), B=-99(LC 12) Max GravD=219(LC 1), B=495(LC 1), E=101(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) Refer to girder(s) for truss to truss connections. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) B except (jt=lb) D=123. 7) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss K01 Truss Type Common Supported Gable Qty 1 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:46 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-i?gmXzhodFkI0jP71_a5kpZqIX51KgkU568GdOzfAbl Scale = 1:26.9 T1 T2 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1HW1 HW1 A B C D E F G H I J Q P O N M L K 4x4 3x6 3x6 4x8 4x8 14-6-0 14-6-0 -2-0-0 2-0-0 7-3-0 7-3-0 14-6-0 7-3-0 0- 7 - 1 5 4- 3 - 7 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-1-8,0-0-6], [J:0-1-8,0-3-6] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.26 0.06 0.04 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.00 -0.01 0.00 (loc) A A J l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 68 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E OTHERS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 1-3-1, Right 2x4 DF Stud/Std -l 1-3-1 BRACING- TOP CHORD Sheathed or 6-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 14-6-0. (lb) - Max HorzB=94(LC 12) Max Uplift All uplift 100 lb or less at joint(s) B, O, P, Q, M, L, K Max Grav All reactions 250 lb or less at joint(s) J, N, O, P, Q, M, L, K except B=382(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 1.5x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) B, O, P, Q, M, L, K. 10) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss K02 Truss Type Common Qty 4 Ply 1 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:47 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-ABE8lJhQOZs8es_Kbi5KG16vWxL736zdJmuq9rzfAbk Scale = 1:26.9 T1 T2 B1 W1 HW1 HW1 A B C D E F G 4x6 4x6 3x4 3x4 4x6 3x4 3x4 1.5x4 7-3-0 7-3-0 14-6-0 7-3-0 -2-0-0 2-0-0 7-3-0 7-3-0 14-6-0 7-3-0 0- 7 - 1 5 4- 3 - 7 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-3-8,0-1-6], [F:0-3-8,0-1-6] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.68 0.32 0.11 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.09 -0.12 0.01 0.05 (loc) F-G F-G F F-G l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 61 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E WEBS 2x4 DF Stud/Std SLIDER Left 2x4 DF Stud/Std -l 3-11-14, Right 2x4 DF Stud/Std -l 3-11-14 BRACING- TOP CHORD Sheathed or 5-9-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) F=698/0-5-8 (min. 0-1-8), B=896/0-5-8 (min. 0-1-8) Max HorzB=94(LC 16) Max UpliftF=-131(LC 13), B=-192(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-966/271, C-D=-789/284, D-E=-789/281, E-F=-956/266 BOT CHORD B-G=-132/705, F-G=-132/705 WEBS D-G=0/267 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) F=131, B=192. 6) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. LOAD CASE(S) Standard Job NEW PEAK - ROCKCHUCK1289 Truss K03 Truss Type COMMON GIRDER Qty 1 Ply 2 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:47 2020 Page 1 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-ABE8lJhQOZs8es_Kbi5KG16wYxF131AdJmuq9rzfAbk Scale = 1:26.9 T1 T2 B1 W1 W2 W3W2W3 HW2 A B C D E F G J I HK L M N 4x6 3x10 7x10 6x8 7x10 3x6 3x10 3x4 2x4 3-7-8 3-7-8 7-3-0 3-7-8 10-10-8 3-7-8 14-6-0 3-7-8 -2-0-0 2-0-0 3-7-8 3-7-8 7-3-0 3-7-8 10-10-8 3-7-8 14-6-0 3-7-8 0- 7 - 1 5 4- 3 - 7 0- 7 - 1 5 6.00 12 Plate Offsets (X,Y)-- [B:0-0-0,0-2-8], [G:0-9-5,0-0-12], [G:0-2-7,0-4-5], [G:0-3-15,0-0-0], [I:0-5-0,0-4-12] LOADING (psf) TCLL TCDL BCLL BCDL 35.0 7.0 0.0 * 7.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2015/TPI2014 CSI. TC BC WB Matrix-SH 0.62 0.71 0.42 DEFL. Vert(LL) Vert(CT) Horz(CT) Wind(LL) in -0.09 -0.13 0.04 0.06 (loc) I-J I-J G I-J l/defl >999 >999 n/a >999 L/d 360 240 n/a 240 PLATES MT20 Weight: 157 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E BOT CHORD 2x6 DF 1800F 1.6E or 2x6 DF SS WEBS 2x4 DF Stud/Std *Except* W1: 2x4 DF 1800F 1.6E or 2x4 DF No.1&Btr or 2x4 DF-N 1800F 1.6E SLIDER Right 2x4 DF Stud/Std -l 1-9-11 BRACING- TOP CHORD Sheathed or 4-2-13 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) G=6333/0-5-8 (min. 0-3-6), B=3761/0-5-8 (min. 0-2-0) Max HorzB=95(LC 31) Max UpliftG=-1460(LC 9), B=-1026(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD B-C=-6497/1770, C-D=-6006/1642, D-E=-5977/1629, E-F=-7790/1920, F-G=-7833/1898 BOT CHORD B-J=-1523/5457, J-K=-1523/5457, I-K=-1523/5457, I-L=-1611/6751, L-M=-1611/6751, H-M=-1611/6751, H-N=-1611/6751, G-N=-1611/6751 WEBS D-I=-1343/4896, E-I=-1678/324, E-H=-305/1882, C-J=-188/591 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-7-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-3-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-10; Vult=115mph (3-second gust) Vasd=91mph; TCDL=4.2psf; BCDL=4.2psf; h=25ft; Cat. II; Exp C; Enclosed; MWFRS (envelope) gable end zone; cantilever left and right exposed ; Lumber DOL=1.33 plate grip DOL=1.33 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) G=1460, B=1026. 8) This truss is designed in accordance with the 2015 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 2642 lb down and 913 lb up at 6-0-12, 1466 lb down and 369 lb up at 8-0-12, 1470 lb down and 322 lb up at 10-0-12, and 1470 lb down and 297 lb up at 12-0-12, and 1476 lb down and 291 lb up at 14-3-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Continued on page 2 Job NEW PEAK - ROCKCHUCK1289 Truss K03 Truss Type COMMON GIRDER Qty 1 Ply 2 Job Reference (optional) Run: 8.330 s Jan 22 2020 Print: 8.330 s Jan 22 2020 MiTek Industries, Inc. Mon Mar 2 09:48:47 2020 Page 2 BMC WEST (IDAHO FALLS), IDAHO FALLS, ID 83402 ID:gdKf_yLvVfbGEP0bObcpddzfCxy-ABE8lJhQOZs8es_Kbi5KG16wYxF131AdJmuq9rzfAbk LOAD CASE(S) Standard Uniform Loads (plf) Vert: A-D=-84, D-G=-84, B-G=-14 Concentrated Loads (lb) Vert: G=-1476(B) K=-2642(B) L=-1466(B) M=-1470(B) N=-1470(B)