Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 21-00119 - Adams Elementary School - AdditionInspection Date: 09/08/2021 File Name: 21020DFR09082021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 09/08/2021 CA3F0497-C0EA-4432-B5DF-5E8A726231EF 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 08:00 AM Client: Madison School District Contractor: Mills Concrete End Time: 10:30 AM Inspection Type(s): Concrete Placement Concrete Reinforcement Location(s): Concrete for Exterior Door apron pads around addition and gymnasium Observations/ Remarks: Arrived on site around 9:00 AM and met with Mills Concrete foreman Jake to test concrete for door aprons. Concrete reinforcement rebar was also inspected and observed to meet specification. Air content was tested as and observed to be 8% after first test. Air content was retested to ensure accuracy, yielding the same result of 8%. Concrete slump was tested and measured to be five and three-quarter inches. Mills concrete foreman Jake was immediately informed of these test results. Concrete strength test specimens were made and left on site on the east side of the gymnasium. Finished testing Concrete and observing pour by 10:30 AM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 09/08/2021 File Name: 21020DFR09082021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 09/08/2021 CA3F0497-C0EA-4432-B5DF-5E8A726231EF 2 Inspection Date: 09/08/2021 File Name: 21020DFR09082021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 09/08/2021 CA3F0497-C0EA-4432-B5DF-5E8A726231EF 3