HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 21-00119 - Adams Elementary School - AdditionInspection Date:
09/08/2021
File Name:
21020DFR09082021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
09/08/2021
CA3F0497-C0EA-4432-B5DF-5E8A726231EF 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
08:00 AM
Client:
Madison School District
Contractor:
Mills Concrete
End Time:
10:30 AM
Inspection Type(s):
Concrete Placement
Concrete Reinforcement
Location(s):
Concrete for Exterior Door apron pads around
addition and gymnasium
Observations/ Remarks:
Arrived on site around 9:00 AM and met with Mills Concrete foreman Jake to test concrete for door
aprons. Concrete reinforcement rebar was also inspected and observed to meet specification. Air
content was tested as and observed to be 8% after first test. Air content was retested to ensure
accuracy, yielding the same result of 8%. Concrete slump was tested and measured to be five and
three-quarter inches. Mills concrete foreman Jake was immediately informed of these test results.
Concrete strength test specimens were made and left on site on the east side of the gymnasium.
Finished testing Concrete and observing pour by 10:30 AM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
09/08/2021
File Name:
21020DFR09082021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
09/08/2021
CA3F0497-C0EA-4432-B5DF-5E8A726231EF 2
Inspection Date:
09/08/2021
File Name:
21020DFR09082021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
09/08/2021
CA3F0497-C0EA-4432-B5DF-5E8A726231EF 3