HomeMy WebLinkAboutSOIL DENSITY 3 - 21-00119 - Adams Elementary School - AdditionFile Name:
21020D09032021YK
345b909c5362d83b-1630691539305 1
4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
21020
Contractor:
Thompson Excavation
Project Name:
Adam's Elementary
Instrument ID
78652
Daily Standardization:
Client:
Madison School District
Date:
09/03/2021
MS:
684
DS:
2472
Time Start:
11:45 AM
Time End:
11:30 AM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 30 ft from the
northwest coner of
the building
Subbase 8 144.2 136.9 5.3 138.9
Material
Type
Pit Run
99
2 20 ft from Northeast
coner of the building
Subbase 8 143.9 137.8 4.4 138.9
Material
Type
Pit Run
99
3 Approximately 20ft
from northwest
coner of the building
Base 8 139.5 134.6 3.6 136.0
Material
Type
3/4" Base
99
4 Approximately 40 ft
from the northeast
coner of the building.
Base 8 132.7 128.7 3.1 136.0
Material
Type
3/4" Base
95
Remarks:
Tested By:
Yannick Kabwika
Signature:
Date:
09/03/2021
Reviewed By:
E. Vail
Signature:
Date:
09/08/2021