Loading...
HomeMy WebLinkAboutSOIL DENSITY 2 - 21-00119 - Adams Elementary School - AdditionFile Name: 21020D09082021LC 49963490-AC3D-46C0-87D5-82F10EA2AA11 1 4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 21020 Contractor: Headwaters Construction Project Name: Adam's Elementary Instrument ID 78652 Daily Standardization: Client: Madison School District Date: 09/08/2021 MS: 2460 DS: 685 Time Start: 02:30 PM Time End: 05:00 PM Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 Southernmost section of replacement sidewalk along east side of 2nd east Top of subbase BS 137.9 130.2 5.9 135.7 Material Type 3/4" Base 96 2 Next section north of first test Top of subbase BS 138.3 128.4 7.7 135.7 Material Type 3/4" Base 95 3 North side of site entrance on 2nd east Top of subbase BS 138.4 131.6 5.1 135.7 Material Type 3/4" Base 97 Remarks: Arrived on site around 2:30 PM to test density of subbase for sidewalk replacement along east side of 2nd east. After initial testing additional fill material and compaction was needed. Later testing yielded passing density test results. Test results were recorded but no one was on site to report results to in person. Left site around 4:30 PM. Tested By: L. Clifford Signature: Date: 09/08/2021 Reviewed By: E. Vail Signature: Date: 09/08/2021