HomeMy WebLinkAboutSOIL DENSITY 2 - 21-00119 - Adams Elementary School - AdditionFile Name:
21020D09082021LC
49963490-AC3D-46C0-87D5-82F10EA2AA11 1
4103 E. 605 N. Sute. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com
In Place Density of Soils ASTM D2922 & D3017
Project Number:
21020
Contractor:
Headwaters Construction
Project Name:
Adam's Elementary
Instrument ID
78652
Daily Standardization:
Client:
Madison School District
Date:
09/08/2021
MS:
2460
DS:
685
Time Start:
02:30 PM
Time End:
05:00 PM
Details
Test
#:
Location:Elevation: Depth:Wet:Dry:% M:Proctor #:%
Proctor:
Pass Fail
1 Southernmost
section of
replacement
sidewalk along east
side of 2nd east
Top of
subbase
BS 137.9 130.2 5.9 135.7
Material
Type
3/4" Base
96
2 Next section north of
first test
Top of
subbase
BS 138.3 128.4 7.7 135.7
Material
Type
3/4" Base
95
3 North side of site
entrance on 2nd east
Top of
subbase
BS 138.4 131.6 5.1 135.7
Material
Type
3/4" Base
97
Remarks:
Arrived on site around 2:30 PM to test density of subbase for sidewalk replacement along east side of 2nd east.
After initial testing additional fill material and compaction was needed. Later testing yielded passing density test
results. Test results were recorded but no one was on site to report results to in person. Left site around 4:30 PM.
Tested By:
L. Clifford
Signature:
Date:
09/08/2021
Reviewed By:
E. Vail
Signature:
Date:
09/08/2021