Loading...
HomeMy WebLinkAboutCONCRETE TEST 2 - 21-00119 - Adams Elementary School - AdditionFile Name 21020C09082021LC 15037C65-7434-4223-BA02-A4E7153E8F1F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Compressive Strength of Concrete Test Specimens Project Number: 21020 Cumulative Test Load Amount: 10.0 Project Name: Adam's Elementary Test Location: East side Of gymnasium Client: Madison School District Admixtures: Required 28 day Strength (psi): 3,500.0 Contractor: Mills Concrete Supplier: Idaho materials Mix Number: 3326104 Ticket #: 79110043 Date: 09/08/2021 Testing: Set #:Time Tested: Ticket #:Test Location: Ambient Temp. (°F): Unit Weight (PCF): Entrained Air (%): Entrained Air Spec. (%): Concrete Temp. (°F): Slump (in): Slump Spec. (in): 1 09:15 AM 79110043East side Of gymnasium 60 135.34 8.00 5.5 +- 1 63 5.75 6 Max Remarks: Arrived on site around 9 AM and met with Mills concrete foreman to test concrete for door aprons. Concrete reinforcement rebar was also inspected and observed to meet specification. Air content was tested as and observed to be 8% after first test. Air content was retested to ensure accuracy, yielding the same result of 8%. Concrete slump was tested and measured to be five and three-quarter inches. Mills concrete foreman was immediately informed of these test results. Concrete strength test specimens were made and left on site on the east side of the gymnasium. Finished testing Concrete and observing pour by 10:30 AM. Tested By: L. Clifford Signature: Date: 09/08/2021 Reviewed By: E. Vail Signature: Date: 09/08/2021