HomeMy WebLinkAboutCONCRETE TEST 2 - 21-00119 - Adams Elementary School - AdditionFile Name
21020C09082021LC
15037C65-7434-4223-BA02-A4E7153E8F1F 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Compressive Strength of Concrete Test Specimens
Project Number:
21020
Cumulative Test Load Amount:
10.0
Project Name:
Adam's Elementary
Test Location:
East side Of gymnasium
Client:
Madison School District
Admixtures:
Required 28 day Strength
(psi):
3,500.0
Contractor:
Mills Concrete
Supplier:
Idaho materials
Mix Number:
3326104
Ticket #:
79110043
Date:
09/08/2021
Testing:
Set #:Time
Tested:
Ticket #:Test
Location:
Ambient
Temp.
(°F):
Unit Weight
(PCF):
Entrained
Air (%):
Entrained
Air
Spec.
(%):
Concrete
Temp.
(°F):
Slump
(in):
Slump
Spec.
(in):
1 09:15
AM
79110043East side
Of
gymnasium
60 135.34 8.00 5.5 +- 1 63 5.75 6 Max
Remarks:
Arrived on site around 9 AM and met with Mills concrete foreman to test concrete for door aprons. Concrete
reinforcement rebar was also inspected and observed to meet specification. Air content was tested as and
observed to be 8% after first test. Air content was retested to ensure accuracy, yielding the same result of 8%.
Concrete slump was tested and measured to be five and three-quarter inches. Mills concrete foreman was
immediately informed of these test results. Concrete strength test specimens were made and left on site on the
east side of the gymnasium. Finished testing Concrete and observing pour by 10:30 AM.
Tested By:
L. Clifford
Signature:
Date:
09/08/2021
Reviewed By:
E. Vail
Signature:
Date:
09/08/2021