Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 14 - 21-00119 - Adams Elementary School - AdditionInspection Date: 09/07/2021 File Name: 21020DFR09072021YK Inspector's Signature:Inspector's Name: Yannick kabwika Reviewer's Signature:Reviewer's Name: Steve Anderson Reviewed Date: 09/07/2021 345b909c5362d83b-1631024443062 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 05:35 AM Client: Madison School District Contractor: Mills Concrete End Time: 08:45 AM Inspection Type(s): Concrete Placement Location(s): Interior slab at few spots in the extension building as shown on the pictures. Observations/ Remarks: I arrived at the side at 5:55 AM. The pouring didn't start until 6:50 AM. The results were reported to both the Mills Concrete supervisor and the truck driver. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 09/07/2021 File Name: 21020DFR09072021YK Inspector's Signature:Inspector's Name: Yannick kabwika Reviewer's Signature:Reviewer's Name: Steve Anderson Reviewed Date: 09/07/2021 345b909c5362d83b-1631024443062 2 Inspection Date: 09/07/2021 File Name: 21020DFR09072021YK Inspector's Signature:Inspector's Name: Yannick kabwika Reviewer's Signature:Reviewer's Name: Steve Anderson Reviewed Date: 09/07/2021 345b909c5362d83b-1631024443062 3