Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 13 - 21-00119 - Adams Elementary School - AdditionInspection Date: 09/03/2021 File Name: 21020DFR09032021YK Inspector's Signature:Inspector's Name: Yannick kabwika Reviewer's Signature:Reviewer's Name: Steve Anderson Reviewed Date: 09/07/2021 345b909c5362d83b-1630698468048 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 11:25 AM Client: Madison School District Contractor: Thompson Excavation End Time: 03:00 PM Inspection Type(s): Earthwork Inspection Location(s): Subbase and base of the north sidewalk of the building extension. Observations/ Remarks: I was at the site from 11:22 AM to 12:32 PM. Then left to another project and came back from 1:36 PM to 3:00 PM. I first shot densities on subbase (pit run), and second on the base (3/4 base). They all passed. I reported the results to Thompson Excavation contractor and to the Headwaters superintendent. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 09/03/2021 File Name: 21020DFR09032021YK Inspector's Signature:Inspector's Name: Yannick kabwika Reviewer's Signature:Reviewer's Name: Steve Anderson Reviewed Date: 09/07/2021 345b909c5362d83b-1630698468048 2