Loading...
HomeMy WebLinkAboutPublic Works Review ResponseReview Report Current --- Public Works Review - Site Plan Status: REVISIONS Application Number: 20-00277Permit Details Application Received Date: 04/30/2020 Civil Site Plan Application Approved Date: Application Approved Status: ACCEPTED 04/30/2020 2300 University Blvd SITE PLAN - 2300 University Blvd - MHS Field House Status of Plan Reviews Completed 05/04/2020--- Planning and Zoning Review - Site Plan REVISIONS 05/05/2020--- Fire Department Review - Site Plan COMPLETED 05/14/2020--- Public Works Review - Site Plan REVISIONS Permit Review Status Plan Reviews Still in Progress DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Plans are approved for a footing/foundation ONLY permit? YES Checked for linked cases YES Water : Valve placement REVISIONSIf water meter is inside structure, a gate valve is required outside of structure. If existing valve on 12" water line is as shown, it will need to be changed to a post indicator type valve. *Revisions Response : Site Lighting : Photometric layout. Make sure lighting plan is submitted. REVISIONSWhat light is to be used in the parking lot? *Revisions Response : Parking Lot: Accessibility/layout REVISIONSNorth stalls do not have turn around bump out. A turn around is required so vehicles are not backing full distance. *Revisions Response : Miscellaneous Review REVISIONS *Revisions Response : Dumpsters: 1 per 20 Units (non-dorm) or 1 per 50 beds (Dorm)? REVISIONSWhat is to be done with the trash? *Revisions Response : Reviewed By: Joel Gray Review Date: 05/14/2020 Plan Review Details joel.gray@rexburg.org --- Public Works Review - Site Plan Status: REVISIONS Page 1 of 2 Approval of plans does not constitute approval of variance from code Drawing has been revised to replace existing valve with a PIV type. BAM, JRWA Lithonia RSX LED P3 40K R5 MVOLT SPA CBA NLTAIR2 PIRHN SSS28 6G CBA. BAM, JRWA Fire apparatus turn around added to north side of parking lot creating turn around bump out. BAM, JRWA Dumpster will be placed at north end of parking lot. BAM, JRWA --- Public Works Review - Site Plan (Continued) D ESCRIPTIO N CO MMEN TS STATUS Street : Street wdith/cross slove/running slope N/A Street : Entrance placement N/A Sewer: Line size/slope/type materials N/ASanitary sewer service only. Sewer: Connection to mainline COMPLETED Water : Connection to main line COMPLETED Water : Services to lot(s)COMPLETED Storm : Drainage calcs COMPLETED Storm : On-site retention COMPLETED Storm : Infiltrators COMPLETED Parking Lot : Drainage COMPLETED Page 2 of 2 Approval of plans does not constitute approval of variance from code