Current --- Public Works Review - Site Plan Status: REVISIONS
Application Number: 20-00277Permit Details
Application Received Date: 04/30/2020
Civil Site Plan
Application Approved Date:
Application Approved Status: ACCEPTED
04/30/2020
2300 University Blvd
SITE PLAN - 2300 University Blvd - MHS Field House
Status of Plan Reviews Completed
05/04/2020--- Planning and Zoning Review - Site Plan REVISIONS
05/05/2020--- Fire Department Review - Site Plan COMPLETED
05/14/2020--- Public Works Review - Site Plan REVISIONS
Permit Review Status
Plan Reviews Still in Progress
DESCRIPTION COMMENTS STA TUS
*Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed!
Plans are approved for a footing/foundation
ONLY permit?
YES
Checked for linked cases YES
Water : Valve placement REVISIONSIf water meter is inside structure, a gate valve
is required outside of structure. If existing valve
on 12" water line is as shown, it will need to be
changed to a post indicator type valve.
*Revisions Response :
Site Lighting : Photometric layout. Make sure
lighting plan is submitted.
REVISIONSWhat light is to be used in the parking lot?
*Revisions Response :
Parking Lot: Accessibility/layout REVISIONSNorth stalls do not have turn around bump out.
A turn around is required so vehicles are not
backing full distance.
*Revisions Response :
Miscellaneous Review REVISIONS
*Revisions Response :
Dumpsters: 1 per 20 Units (non-dorm) or 1 per
50 beds (Dorm)?
REVISIONSWhat is to be done with the trash?
*Revisions Response :
Reviewed By: Joel Gray
Review Date: 05/14/2020
Plan Review Details
joel.gray@rexburg.org
--- Public Works Review - Site Plan Status: REVISIONS
Page 1 of 2
Approval of plans does not constitute approval of variance from code
Drawing has been revised to replace
existing valve with a PIV type. BAM, JRWA
Lithonia RSX LED P3 40K R5 MVOLT SPA CBA NLTAIR2
PIRHN SSS28 6G CBA. BAM, JRWA
Fire apparatus turn around added to north
side of parking lot creating turn around
bump out. BAM, JRWA
Dumpster will be placed at north end of
parking lot. BAM, JRWA
--- Public Works Review - Site Plan (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Street : Street wdith/cross slove/running slope N/A
Street : Entrance placement N/A
Sewer: Line size/slope/type materials N/ASanitary sewer service only.
Sewer: Connection to mainline COMPLETED
Water : Connection to main line COMPLETED
Water : Services to lot(s)COMPLETED
Storm : Drainage calcs COMPLETED
Storm : On-site retention COMPLETED
Storm : Infiltrators COMPLETED
Parking Lot : Drainage COMPLETED
Page 2 of 2