Loading...
HomeMy WebLinkAboutFire Dept Review ResponseReview Report Current --- Fire Department Review - Site Plan Status: APPROVED Application Number: 20-00277Permit Details Application Received Date: 04/30/2020 Civil Site Plan Application Approved Date: Application Approved Status: ACCEPTED 04/30/2020 2300 University Blvd SITE PLAN - 2300 University Blvd - MHS Field House Status of Plan Reviews Completed 05/04/2020--- Planning and Zoning Review - Site Plan REVISIONS 05/05/2020--- Fire Department Review - Site Plan COMPLETED Permit Review Status Plan Reviews Still in Progress --- Public Works Review - Site Plan DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Plans are approved for a footing/foundation ONLY permit? YES Fire lanes exceeding 150' require a turn-around REVISIONSNeed a fire department turn around with in 150' of the Fire Department connection located at the street side of the building. *Revisions Response : Hydrant located within 150' from FDC REVISIONSWill need a Fire Hydrant located with in 150' of the Fire Department Connection at the street side of the building. *Revisions Response : 30' inside radius and 45' outside radius COMPLETED Building height >30' - fire lane to be 30' to 45' from building COMPLETED Minimum fire lane clearance 13'6"COMPLETED No hydrants within 40' of building COMPLETED Fire Line Striping and/or Fire Lane Signs COMPLETED Evaluate Hydrant access near parking spaces COMPLETED Reviewed By: Stan Crittenden Review Date: 05/05/2020 Plan Review Details dale.pickering@rexburg.org --- Fire Department Review - Site Plan Status: APPROVED Page 1 of 1 Approval of plans does not constitute approval of variance from code Parking lot has been revised to create hammer head turn around. BAM, JRWA Hydrants have been shown. An additional hydrant added and FDC location proposed BAM, JRWA