HomeMy WebLinkAboutFire Dept Review ResponseReview
Report
Current --- Fire Department Review - Site Plan Status: APPROVED
Application Number: 20-00277Permit Details
Application Received Date: 04/30/2020
Civil Site Plan
Application Approved Date:
Application Approved Status: ACCEPTED
04/30/2020
2300 University Blvd
SITE PLAN - 2300 University Blvd - MHS Field House
Status of Plan Reviews Completed
05/04/2020--- Planning and Zoning Review - Site Plan REVISIONS
05/05/2020--- Fire Department Review - Site Plan COMPLETED
Permit Review Status
Plan Reviews Still in Progress
--- Public Works Review - Site Plan
DESCRIPTION COMMENTS STA TUS
*Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed!
Plans are approved for a footing/foundation
ONLY permit?
YES
Fire lanes exceeding 150' require a turn-around REVISIONSNeed a fire department turn around with in 150'
of the Fire Department connection located at
the street side of the building.
*Revisions Response :
Hydrant located within 150' from FDC REVISIONSWill need a Fire Hydrant located with in 150' of
the Fire Department Connection at the street
side of the building.
*Revisions Response :
30' inside radius and 45' outside radius COMPLETED
Building height >30' - fire lane to be 30' to 45'
from building
COMPLETED
Minimum fire lane clearance 13'6"COMPLETED
No hydrants within 40' of building COMPLETED
Fire Line Striping and/or Fire Lane Signs COMPLETED
Evaluate Hydrant access near parking spaces COMPLETED
Reviewed By: Stan Crittenden
Review Date: 05/05/2020
Plan Review Details
dale.pickering@rexburg.org
--- Fire Department Review - Site Plan Status: APPROVED
Page 1 of 1
Approval of plans does not constitute approval of variance from code
Parking lot has been revised to create hammer
head turn around. BAM, JRWA
Hydrants have been shown. An additional
hydrant added and FDC location proposed
BAM, JRWA