Loading...
HomeMy WebLinkAboutREVISIONS - 21-00589 - Madison Armory Indoor Gun Range.pdfAuthor Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Tawnya Grover Tawnya.Grover@rexburg.org 208-372-2167 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Description : Madison Armory - Indoor Gun Range Address : 870 N 2nd E Application Type : Document Filename : MADISON ARMORY NFC 7-28-21.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 5 SITE PLAN Callout Stan Crittenden : Fire Open 5 Min. Fire Department access road width is 20'. IFC 2018 Appendix D 5 SITE PLAN Callout Kyle Baldwin : P&Z Open 5 Internal sidewalks must be connected to sidewalk in right of way. See section 6.00.090,B 5 SITE PLAN Free text Kyle Baldwin : P&Z Open 5 Please provide breakdown of square footage specifying warehouse sq ft; range sq ft; retail sq ft. etc. in order to determine parking stall requirement 5 SITE PLAN Callout Kyle Baldwin : P&Z Open 5 This area of drive aisle must be labeled and signed as "One Way" if width falls below 24' 5 SITE PLAN Callout Kyle Baldwin : P&Z Open 5 Please show required screening between 2nd East and building. See section 3.04.060,A,5,c 5 SITE PLAN Free text Kyle Baldwin : P&Z Open 5 Please show required snow storage areas 5 SITE PLAN Callout Joel Gray : PW Open 5 What is cross section of roadway? Must extend past pathway on road edge. # 21-00589 New Commercial Building Report Date: 08.19.2021 Approval of plans does not constitute approval of variance from code Page 1 of 2 Adjusted to meet 20' min. Corrected to add connection See Architectural plan for sq.ft. breakdown Signs Added Trees & Note Added Added Cross Section Added Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 5 SITE PLAN Callout Joel Gray : PW Open 5 Rotate north along curb for right hand pickup. 5 SITE PLAN Callout Joel Gray : PW Open 5 No overnight parking allowed due to dumpster location. 5 SITE PLAN Callout Joel Gray : PW Open 5 No parking in Easement. 5 SITE PLAN Free text Joel Gray : PW Open 5 Where will truck loading/unloading area be? DEQ Approval required for water line extension. 5 SITE PLAN Callout Joel Gray : PW Open 5 Fire hydrant required at end of line. 5 SITE PLAN Callout Joel Gray : PW Open 5 Where is runoff going from street? 5 SITE PLAN Free text Joel Gray : PW Open 5 Is Fire Line required to building? Where will water meter be located? Report Date: 08.19.2021 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org) Moved North Signs Added Parking Removed Loading & Unloading is in the rear. Need will serve for DEQ approval. Moved F.H. to end of line To the C.B. & then to our pond. No Fire line required. Meter pit location added.