HomeMy WebLinkAboutSOIL DENSITY 6 - 19-00731 - The Grove at Thomson Farms PH2 - Hickory - 30 Unit Bldg 4In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Thompson Farms
20001
Stillwater Equity Partners
Hill and Son Excavation
05/14/2020 F Pelton
2:00 PM 6:00 PM
3743
747 2718
12 1 ft below bottom of finish grade 5.4
132
96%
Approximately 1.25 and A.8 of building 6.
1 ft below bottom of finish grade
Pit Run
99%
132
4.9
130.2
136.6
97%
132
4.4
128.1
133.7
Pit Run
1 ft below bottom of finish grade
Approximately 2.5 and A.5 of building 6.
98%
132
6
129.1
136.8
Pit Run
1 ft below bottom of finish grade
Approximately 3.75 and A.2 of building 6.
98%
132
5.9
129.1
136.7
Pit Run
1 ft below bottom of finish grade
Approximately 3.75 and A.7 of building 6.
97%
132
5.5
128.6
135.6
Pit Run
Bottom of finish grade
Approximately 1.8 and B.5 of building 6.
98%
132
6.7
129.1
137.7
Pit Run
Bottom of finish grade
Aproximately 2.5 and B.25 of building 6.
Digitally signed by Jacob P
Christensen
Date: 2020.05.19 11:36:03 -06'00'
12
12
12
12
12
12
1
127
134.2Approximately 1.25 and A.2 of building 6.
Pit Run
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
97%
132
5.5
127.4
134.4
Pit Run
Bottom of finish grade
Approximately 3.75 and B.5 of building 6.
128