HomeMy WebLinkAboutSOIL DENSITY 5 - 19-00731 - The Grove at Thomson Farms PH2 - Hickory - 30 Unit Bldg 4In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Thompson Farms
20001
Stillwater Equity Partners
Hill and Son Excavation
05-15-2020 F Pelton
1:00 PM 5:30 PM
76562
693 2784
4Bottom of Slab 4.6
128
98%
Approximately 1.25 and A.55 of Building 6.
Bottom of Slab
3/4
96%
128
6
122.8
130.2
97%
128
3.5
124.1
128.5
3/4
Bottom of Slab
Approximately 1.25 and A.8 of Building 6.
95%
128
3.9
122
127.7
3/4
Bottom of Slab
Approximately 2 and A.3 of Building 6.
95%
128
4.9
122
127.9
3/4
Bottom of Slab
Approximately 2.4 and A.3 of Building 6.
96%
128
3.5
122.6
126.9
3/4
Bottom of Slab
Approximately 2.4 and A.8 of Building 6.
95%
128
5.3
121.4
127.9
3/4
Bottom of Slab
Approximately 2.65 and A.5 of Building 6.
Digitally signed by Jacob P
Christensen
Date: 2020.05.19 11:41:43 -06'00'
4
BS
BS
4
4
4
1
125
131Approximately 1.25 and A.2 of Building 6.
3/4
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
95%
128
4.1
121.1
126
3/4
Bottom of Slab
Approximately 2.65 and A.8 of Building 6.
128
96%
3.9
122.3
127.1
3/4
Bottom of Slab
Approximately 3.7 and A.8 of Building 6.
128
95%
4.3
121.9
127.2
3/4
Bottom of Slab
Approximately 3.5 and A.25 of Building 6.
128
95%
4.5
121.3
126.8
3/4
Bottom of Slab
Approximately 3.5 and A.25 of Building 6.
128
95%
4.8
122.2
128
3/4
Bottom of Slab
Approximately 3.8 and A.25 of Building 6.
128
95%
5.4
121.7
128.3
3/4
Bottom of Slab
Approximately 3.8 and A.5 of Building 6.
128
96%
4.5
122.8
128.3
3/4
Bottom of Slab
Approximately 3.2 and B.5 of Building 6.
128
96%
4.7
122.4
128.2
3/4
Bottom of Slab
Approximately 2.5 and B.75 of Building 6.
4
4
4
4
4
4
4
4
8
11
15
9
10
14
13
12