Loading...
HomeMy WebLinkAboutSOIL DENSITY 5 - 19-00731 - The Grove at Thomson Farms PH2 - Hickory - 30 Unit Bldg 4In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Thompson Farms 20001 Stillwater Equity Partners Hill and Son Excavation 05-15-2020 F Pelton 1:00 PM 5:30 PM 76562 693 2784 4Bottom of Slab 4.6 128 98% Approximately 1.25 and A.55 of Building 6. Bottom of Slab 3/4 96% 128 6 122.8 130.2 97% 128 3.5 124.1 128.5 3/4 Bottom of Slab Approximately 1.25 and A.8 of Building 6. 95% 128 3.9 122 127.7 3/4 Bottom of Slab Approximately 2 and A.3 of Building 6. 95% 128 4.9 122 127.9 3/4 Bottom of Slab Approximately 2.4 and A.3 of Building 6. 96% 128 3.5 122.6 126.9 3/4 Bottom of Slab Approximately 2.4 and A.8 of Building 6. 95% 128 5.3 121.4 127.9 3/4 Bottom of Slab Approximately 2.65 and A.5 of Building 6. Digitally signed by Jacob P Christensen Date: 2020.05.19 11:41:43 -06'00' 4 BS BS 4 4 4 1 125 131Approximately 1.25 and A.2 of Building 6. 3/4 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 95% 128 4.1 121.1 126 3/4 Bottom of Slab Approximately 2.65 and A.8 of Building 6. 128 96% 3.9 122.3 127.1 3/4 Bottom of Slab Approximately 3.7 and A.8 of Building 6. 128 95% 4.3 121.9 127.2 3/4 Bottom of Slab Approximately 3.5 and A.25 of Building 6. 128 95% 4.5 121.3 126.8 3/4 Bottom of Slab Approximately 3.5 and A.25 of Building 6. 128 95% 4.8 122.2 128 3/4 Bottom of Slab Approximately 3.8 and A.25 of Building 6. 128 95% 5.4 121.7 128.3 3/4 Bottom of Slab Approximately 3.8 and A.5 of Building 6. 128 96% 4.5 122.8 128.3 3/4 Bottom of Slab Approximately 3.2 and B.5 of Building 6. 128 96% 4.7 122.4 128.2 3/4 Bottom of Slab Approximately 2.5 and B.75 of Building 6. 4 4 4 4 4 4 4 4 8 11 15 9 10 14 13 12