Loading...
HomeMy WebLinkAboutSOIL DENSITY 4 - 19-00731 - The Grove at Thomson Farms PH2 - Hickory - 30 Unit Bldg 4In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Thompson Farms 20001 Stillwater Equity Partners 05/18/2020 F Pelton 3:45 6:45 867 1192 5177 12Bottom of Footing 5.011 132 98% Approximately A.75 and 1.25 of Building 6. Bottom of Footing Pit Run 97% 132 5.969 128.3 136 95% 132 4.953 126 132.2 Pit Run Bottom of Footing Approximately A.5 and 2.5 of Building 6. 96% 132 5.466 127.1 134.1 Pit Run Bottom of Footing Approximately A.25 and 3.75 of Building 6. 97% 132 5.226 128.1 134.8 Pit Run Bottom of Footing Approximately A.75 and 3.75 of Building 6. 96% 132 5.152 127 133.6 Pit Run Bottom of Footing Approximately C.25 and 3.75 of Building 6. 95% 132 5.72 125 132.2 Pit Run Bottom of Footing Approximately C.75 and 3.7 of Building 6. Digitally signed by Jacob P Christensen Date: 2020.05.19 11:43:53 -06'00' 12 10 12 12 12 12 1 129 135Approximately A.25 and 1.25 of Building 6. Pit Run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 96% 132 4.701 126.2 132.2 Pit Run Bottom of Footing Approximately C.75 and 1.25 of Building 6. 132 99% 4.875 130.1 136.4 Pit Run Bottom of Footing Approximately C.25 and 1.25 of Building 6. 132 98% 4.525 128.9 134.8 Pit Run Bottom of Footing Approximately C.35 and 2.5 of Building 6. 12 12 12 8 9 10