HomeMy WebLinkAboutPA SUMMARY - 21-00684 - 1104 Cypress Loop - New SFRApplication
Summary
Application Number: 21-00684
BLD-SFR - New Single Family Residence
Received Date: 08/30/2021 RPRPNBK2030110 - New SFR
Address: RPRPNBK2030110 - Lot 11 Bloc
Property Information
PINE BROOK ESTATES DIVISION NO. 2RPRPNBK2030110
People Information
Applicant - TWebb Construction LLC 3470 Leihm Ln
twebbconstruction@gmail.com Idaho Falls, ID 83401
Mobile: 2083134960
Owner - Mike Bush Same
UT, UT 88888
Contractor Information
General Contractor - Twebb Construction LLC - Todd Webb RCE-30844 (09/28/2021)
twebbconstruction@gmail.com 3470 E Leihm
Idaho Falls, ID 83401
Mobile: 208-313-4960
Power Company - Rocky Mountain Power - Byron Borg NONE (12/31/2022)
byron.borg@pacificorp.com
Power Company - Rocky Mountain Power 2 - Dewey Smuin NONE2 (12/31/2022)
dewey.smuin@rockymountainpower.net
Gas Company - Intermountain Gas Company - Chad Darrington 0000 (06/08/2022)
IFPermits@intgas.com
Work: 800-548-3679
Page 1 of 3Print Date: 08/30/2021
Application
Summary
Application Number: 21-00684
BLD-SFR - New Single Family Residence
Received Date: 08/30/2021 RPRPNBK2030110 - New SFR
Address: RPRPNBK2030110 - Lot 11 Bloc
Application Information
Detail Description Quantity Value
YI understand building without the Building Permit signed by
the Building Administrator will result in double fees and the
project will be red tagged causing all construction to stop.
1,813.00New Living Space Square Feet - total of main & upper,
finished & unfinished basement
1,813.00
Rural Residential 1Zoning designation
236,741.54Square footage - Main and upper Levels 1,813.00
Applicable edition of code
47,741.68Square footage - Garage 931.00
Construction Type
Zoning explanation (if any)
YI understand the building cannot be occupied without
receiving a signed Certificate of Occupancy which may result
in citations and eviction.
YI understand if an inspection is not done, the inspector may
require any measures to allow him to correctly perform the
inspection. Call hotline at (208) 372-2344 not the inspector.
Description of work being done
Square footage - Unfinished basement 0.00
Use and Occupancy
Square footage - Finished basement at time of new
construction
0.00
YI understand approval from 1 inspector does not constitute
full City approval. Ultimately I must have a complete, signed
Building Permit or a Certificate of Occupancy.
YI understand it is my responsibility to inform anyone on my
project about building policies. These policies will be
enforced regardless of if this information is passed on or not.
Square footage - Finished basement at a time later than new
construction
YI understand that when the water meter and associated
equipment are delivered, the contractor shall be responsible
for this equipment until inspected for Certificate of
Occupancy.
1Water meter size
Water meter explanation (if any)
Other comments
Page 2 of 3Print Date: 08/30/2021
Application
Summary
Application Number: 21-00684
BLD-SFR - New Single Family Residence
Received Date: 08/30/2021 RPRPNBK2030110 - New SFR
Address: RPRPNBK2030110 - Lot 11 Bloc
Fee Information
Fee Code & Description Amount
$482.003/4" Water Meter Radio Read (WM-3/4"RAD)
$2,071.00Building - Building Permit (BLDBLP@@)
$1,415.00Sewer Connection - SFR (WWRICSFR)
$195.00Electrical - SFR by Sq. Ft. (BLDELSF@)
$195.00Mechanical - SFR by Sq. Ft. (BLDMESF@)
$195.00Plumbing - SFR by Sq. Ft. (BLDPLSF@)
$123.00Impact - Fire - Single Family Residence (FIRICSFR)
$242.00Impact - Police - Single Family Residenc (POLICSFR)
$1,195.00Impact - Parks - Single Family Residence (PRKICSFR)
$547.00Impact - Streets - Single Family Residen (STRICSFR)
$1,630.00Water Connection - SFR (WTRICSFR)
$207.00Building - Plan Review (BLDBLPCK)
$8,497.00
Payment Information
Payment AmountTender Type Reference InfoPayment Date
Page 3 of 3Print Date: 08/30/2021