HomeMy WebLinkAboutSPECIAL INSPECTION 10 - 21-00119 - Adams Elementary School - AdditionInspection Date:
08/23/2021
File Name:
21020DFR08232021DC
Inspector's Signature:Inspector's Name:
Damon Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/24/2021
ed818ec10318243b-1629730044309 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
08:30 AM
Client:
Madison School District
Contractor:
Elite Steel
End Time:
05:30 PM
Inspection Type(s):
Epoxy Embeds/ Anchors
Location(s):
North facing entrance south of gymnasium on the
east side.
West side furthest south entrance and west side
middle entrance.
Observations/ Remarks:
Arrived at jobsite and spoke with Dennis from Elite Steel to coordinate inspections for the day.
Observed drilling of holes, cleaning of holes with a wire clean out and air, and observed installation of
epoxy.
Also checked epoxy packaging for expiration, found ok. Started awning at Southern west entrance and
discovered that it requires 3" tube spacers in between so put on hold and moved to center west
gymnasium entrance. All holes drilled and inspected and 2 all-thread bolts epoxied and installed.
Contractor asked for inspection again on 8/24 at 6:30 am.
Items observed are in general conformance with approved project documents and jurisdictional requirements.