Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 10 - 21-00119 - Adams Elementary School - AdditionInspection Date: 08/23/2021 File Name: 21020DFR08232021DC Inspector's Signature:Inspector's Name: Damon Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/24/2021 ed818ec10318243b-1629730044309 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 08:30 AM Client: Madison School District Contractor: Elite Steel End Time: 05:30 PM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): North facing entrance south of gymnasium on the east side. West side furthest south entrance and west side middle entrance. Observations/ Remarks: Arrived at jobsite and spoke with Dennis from Elite Steel to coordinate inspections for the day. Observed drilling of holes, cleaning of holes with a wire clean out and air, and observed installation of epoxy. Also checked epoxy packaging for expiration, found ok. Started awning at Southern west entrance and discovered that it requires 3" tube spacers in between so put on hold and moved to center west gymnasium entrance. All holes drilled and inspected and 2 all-thread bolts epoxied and installed. Contractor asked for inspection again on 8/24 at 6:30 am. Items observed are in general conformance with approved project documents and jurisdictional requirements.