HomeMy WebLinkAboutAPPLICATION & DOCS - 93-00002 - LDS Church Junior Seminary Building - Remodeld
7F
APPLICATION FOR BUILDi
CITY OF RE]CBURG r
a
NG PERMIT
pa�� Q� Application
229 1993 Permit Na. -
CONTRAC'T'OR
Name LDS Church mmmbammmv� -- Name_
271.0 West Sunrise
Street Address Rim Road Stree
Not selected yet
Mailing Address P.O. Box 15309 Mailing Address
City, State- Bo.is Idaho City State
r
Zig X37Telephone 208-342-2735Zip� �elephone-
0 5
Call, Nielson Bc & Assoc.
116
alls,�,-Jdaho :[Za. Lic. No.,,AR
Architect or Engineer.Lng
ACH T. D .
PTION
_(ATT ---COPY - I � M
Lot No Block. ion
j l west I Nora y_RexburL�
Idaho
informationproject
X E:duca-Eional Gov I t X Religiouf3
-Residence
r
Fence Patio carport Garage Awning
a l
NewX Remodel Addo
.r Repair
structure:
y -
1, 04
U U
0
I He 3*1 g
Total Floor Area 5 180 Number of Stories,�,..�:
MP
foot
70
�i
--� ;,Finish
d tpti
age4 3--
mhprko�
Whatw'11' structu
for (include re am
app
lSemin nits
use is
mul t l family(apartments)
Estimated cost
Use Classification
r E- Type
r III i h r s one
Building iL
pluming permit Fees
wazer u sz)e
signature 1
Signature
issued by
Plan Cheek Fees I�
Digging Permit Fee
Other Fees
0
A.
CALL, NELSON, BODILY
& ASSOCIATES., P.A.
ARCHITECTS
q.90JOHN ADAMS PKWY P,O. .SOX 221
'HO'DAHO FALLS, IDAHO 83403 PHONE 208152V877,9
01V1P0RTAN'T_N_0T
Lqmiblc� con_ciiioR_ f)
April 5, 1993
E: This is a fax addendum
ase call 522-8779
f 2
W,
TCC
o
If all Daae
ADDENDUM N0. 7
re not received *Q1
This addendum applicable to work designated herein shall be understood to be and is an
Addendum and as such shail be pari of and included in the Contract%r
To all bidders for furnishing all tabor and materials necessary for-,
Rexburg Junior Semi -nary
Rexburg Idaho
Failure its acknowledge receipt os this Addendum on the bld" proposal farm may result in
rejecl:ic�n of your bid.
W.
'id Openin;
%_j
Date.- April 80 1993
place Rexburg Junior Ser-nif-lary
3 e 112 W "r i'Y' of tf1
Rexburg, Idaho
T i m e.m 2.Oo p.m.
The owner his purchased the city building permit, plurnb"ng ��rrr���� ar�d paid Che city
plan rev" i�w fee. ASI ath�r permits,, fess etc. are the responsibility of the Contractor.
2. Rooms 103, 1 & 1 14 ars to reserve new 5I8" 9YPSum board ar•id acoustical tile o,-1
the ceiling per the reflected ceiling plan. The existir�� ��ilin� til is to be removed
to installing the new gYpsum board- (Roorr, finish schedule is incorrect).
'3. Roorn 11 a., the existing ceiling is to remain as is in this roam.
��. Grass 'in existing lawn are -as shah be removed and replaced with 2" new topsoil and
new lawn sod- Existing dawn is not to be repaired,
t � _
L
The following plumbing HVAC
sub -contractors have been r the owner for
bidding . No otherplumbing and/or HVAC subill be approved to do work9
on this project.
United Plumbing
J & R Plumbing
Contin Heating
& M Pimp/Htg
Commercial Metal Wrks
Rexburg, Idaho
Idaho Falls, Idaho
Idaho Fails, Idaho
Shelley, Idaho
Idaho Falls, Idaho
�. Sheet A- 1 mrair7 floor plam. Millwork elevation ked for offices 104, 105 & 1 -1, 6 should
be W/A-4 in lieu Of VSA -4
�.
CPM scheduling as described in, section 01 310 is not required for this project. See
the following section 01 :310 for revised schedule requirements,
PROGRESS SCHEDULE
..
Immediately after being awarded the Contract., prepare and submit for review an
estimated progress schedule for the Work. progress schedule stiall be. in sufficient
detail, to include but not be limited to:
a. Significant elements of the Work,
b. Time frame for each element of work with a beginning and ending point.
C. Percentage of progress of �varlc placed or to be placed ;ri a monthly period" of
time.
d. Vaiue:3 of the ellernents of work and relationship of elements of work one to the
other for the total work under the Contract.
2_ Progress schedule shall be updated monthly and submitted v+rrth each periodic estimate
for partial pad, and shall show the original proqress schedule or revised progres.:J-
schedule one entry for each itern of 'work as follows:
a. Progress or work placed prior to period of partial payment thin tieing requested.
b. Pr -ogress during period of partial payment being requested.
G. Remaining work to bre done by each item of work and for total work remaining
under the Contractd
P-1- - - -
ELECTRICAL ADDENDUM %F.M..q
X 1 Eftfta-06 Ir-m-ftmo
SUBJECT-, R i'K_NrnURG -SEMINARY
APPIZOVED
F
Copia
4PS2G-_52-.2 120
GeMeza€ RIWAxic RP'U7S 1
Q)Immbia 6111-0-2-24-,1-120�AK
COluMbiLa X111-.52-142-120LEw OAK
N...
- CALL, NIELSON, BODILY
-& ASSOCIATES, P.A.
ARCHITECTS
990 JOHN ADAMS PKWY • P.O. BOX 2212
IDAHO FALLS. IDAHO 83403 PHONE 208/522-8779
TO:
City of Rexburg
Planning and Zoning
P.O. Box 280
Rexburg, Idaho 83440
TRANSMITTED HEREWITH:
D SHIP DRAWINGS
D TRACINGS
0 PRINTS
D COPY OF LETTER
OTHER
TRANSMITTAL
D SPECIFICATIONS
C FOR,APPROVAL
Q FOR YOUR USE
AS REQUESTED
❑ REVIEW & COMMENT
REMARKS:
COMMENTS
FS FURNISH AS SUBMITTED
RR REVISE & RESUBMIT
R REJECTED
FC FURNISH AS CORRECTED
FOR CALL, NIELSON, BODILY}
ASSOCIATES, P.A.
ARCHITECTS i
�C
Is
I
CALL, NIELSON, BODILY
& ASSOCIATES, P.A.
ARCHITECTS
990 JOHN ADAMS PKWY P.O.BOX 2212
IDAHO FALLSF IDAHO 83403 PHONE 208152218779
April 5, 1993
IMPORTANT NOTE: This is a fax addendum of 2
leaible condition n#ease_calf 522-$779
acres.
If all
ADDENDUM NO. t
r-0116- M a
received in
This Addendum applicable to work designated herein shill be understood to be and is an
Addendum and as such shad be pari of and included in the Contract..
To all bidders for furnishing all labor and materials necessary for:
Rexburg Junior Semi -nary
Rexburg Idaho
Failure to acknowledge receipt of this Addendum on the bid proposal form may result in
rejection of your bid.
Bid, Opening
Date: April 8, 1993
Place: Rexburg Junior Seminary
31 1/2 W 1 North
Rexburg, Idaho
Time: 2:00 p.m.
� • The owner has purchased the city building permit, plumbing permit and paid the city,
pian review fee. All other permits, flees etc. are the respflnsibiiity of the Con rac or.
2. Rooms 103, 1 & 114 are to receive new 5/$" gypsum board and acoustical file on
the ceding per the reflected ceiling plan. The existing ceiling file is to be removed prior
to installing the new gypsum board. (Room finish schedule is incorrect),
3
k 0 . doom 118 r the xi ifi rr-i
4- Grass in existing lawn ares shad be removed and
new lawn sod. Existing lawn is not to be repaired.
replaced with 2" new topsoil and
r
Ir
5. The fol'lowi*ng plumbing HVAC sub -contractors have been approved by the owner dor
bidding, No other plumbing and/or HVAC sub -contractors will be approved to do work
on this project,
United Plumbing
J & R Plumbing
Cavan Heating
M &. M Plmg/Htg
Commercial Meda[ Wrks
Rexburg, Idaho
Idaho Falls, Idaho
Idaho Falls, Idaho
Shelley, Idaho
Idaho Falls., Idaho
6. Sheet A-1 main floor pian: Millwork elevation key for offices 104,, 105 & 116 should
be W/A-4in lieu of V/A-4
7. QPM scheduling as described
in section
01 310 is
not required for this prol'act. See
the following section 0 1 310
for revised
schedule
requirements.
01 310
PROGRESS SCHEDULE
1.
Immediately after being awarded the 'Contract. prepare and submit for review an
estimated progress schedule for the Work. Progress schedule shall be in sufficient
detail to include but not be limited to:
a. Significant elements of �he Work.
b. Time frame for each element of work with a beginning and ending poi nt.
C. percentage of progress of work pl<acted or to he placed in a monthly period of
time.
d. Value of the elements of work and relationship of elements of work one to the
other for the total work under the Contract.
2. Progress schedule shall be updated monthly and submitted with each periodic estimate
for partial. pay, and sail show the original progress schedule or revised progress
schedule one entry for each idem of work as follows:
a. Progress or work placed prior to period of partial payment then being requested.
b. Progress during period of partial payment being requested.
C . Remaining work to be done by each item of work and for fatal work remaining
ender the Contract.
04 Lftl_ W k, I
F-7
F"3
F-9
Calumbin.
3:
'S2C-r-3i 12
Z:qr. F,ffiv"
,a
Columbia 6111-52-2120LE-0AK
Cobumbz�. `111-`42-142-120 -0AX
r
s
�`- CALL, NIELSON, BODILY
_& ASSOCIATES, P.A.
ARCHITECTS
990 JOHN ADAMS PKWY P.O. BOX 221
IDAHO FALLS, IDAHO 83403 PZ 208152218779
April 71 1993
IMPORTANT NOTE:This is a fax ad
condition please call 522-$77
o-dum of 3
K=191r3: 10 101el►�■NSIM
aqes._ If it is not received. in leaible
This Addendum applicable to work designated herein shall be understood to be and is an
Addendum and as such shall be part of and included in the Contract.
To all bidders for furnishing all lobar and materials necessary for:
Rexburg Junior Seminary
Rexburg Idaho
Failure to acknowledge receipt of this Addendum on the bid proposal form may result in
rejection of your bed.
1.
The following plumbing HVAC sub -contractors have been approved by the owner for
bidding in addition to those approved in Addendum no. 1,
Housley Pumps Inc..
St. Anthony, Idaho
2. Reflected ceiling pian indicates 2 ceiling fans per room in classrooms 103., 1 & 114.
The number of fans shall be 3 per classroom as shown on the electrical drawings.
3. Specifications Master Table of Contents Division 12 strike the words "Not Used".
Division 12 isSpecifiused inthe catians.
M0.0
4. See the attached specification for owner furnished and contractor installed carpe.
Accessories including but not limited to carpet bars,. adhesive, etc. shall be furnished
by the installer.
VC
21 May 22
09 687 TUFTED CARPET DIRECT GLUED INSTALLATION
ap 4& M 10 " M M 4• q&
GENERAL -a PART I
R M � me i " 'P W ma 4 W W .a
Summary
A. Included' But Not Limited Toy
1. Installation of Owner furnished carpet.
2. Furnishing and installation of adhesives and accessories.
B. Rebated Work -
1 . Section 09 681 - Floor Preparation
1,2 References:
A. ASTM D 2859-76., "Test Method for Flammability of Finished, Textile Floor Covering
Materials"
B. ASTM E 648-91, "Test Method for Critical Radiant Flux of Floor Covering Systems Using
a Radiant Heat Energy Source"
C. NFPA 258-1982., "Standard Research Test Method for Determining Smoke Generation of
Solid Materials"
1.3 Submittals:
A. Operations & Maintenance Manual Data
1 - See Section 01 730.
2. Manufacturer's literature, or cut sheet
3. Color and style selection
7.4 Quality Assurance:
A. Requirements of Regulatory Agencies
1 . Carpet specified Thall have been tested in accordance with ASTM E 648, ASTM D
X859, and NFPA Z58, and shatl meet or exceed N.B.S. requirements for exits and
corridors.
1.5 Project/Site Conditions:
A. Environmental Requirements -
1 . See Sections 01 513 and 01 561 for requirements placed on General Contractor,
2. Contact Architect fay instructi ons in regard to conditions not covered ire this Section.
1.6 Maintenance-.
A. Provide one year free service for correcting conditions resulting from faulty workmanship.
Faulty workmanship shall include but not be limited to -
i . Open seams
2. Over compressed (humped) seams
3. Frayed seams
4. Air bubbles or wrinkles
5. Failure to neatly butt to walls and around door frames.
Rexburg Junior Seminary
507-2344-80-3
Tufted Carpet Direct Glued
1
09687
February 1993
21 r 62
PRODUCTS - PART 11
W = M M OW MW ® # f � i
2.1 Carpet:
A. Secondary Backing
1 a Tufloc-Action Bac by J & J
Be Lapp Pile Carpet by J & J
2.2 Glue -Down Carpet Accessories:
A. Adhesive. -
1 . Multi-purpose Adhesive #251 by W 'VRI Henry Company, Humington Park, CA
2. Para -them M433 latex and M263 latex for seams.
B. Carpet Bars -
1 . Deluxe pinless by Roberts.
2. Equal as approved by Architect prior to bidding. See Section 01 X30.
-a � � � i, I& 'go 7- EF M -M No i .00
EXECUTION - PART III
EW -W W .06 ! E i i -W � � � op W*
3.1
3.2
3.3
Examination:
A. Notify Architect in writing if base is not acceptable. Do not lay carpet over unsuitable
surface.
Installation:
A. Restrict use of small pieces of carpet to complete job with carpet available to small rooms
other than office.
B. Laying of Glue -Down Carpet
1. spread of adhesive not to exceed 40 square yards per 5 gallon paid.
2. Trim selvedge and two roves of pile from longitudinal edges.
3. Cut two pieces of carpet to length plus trim and Icy in place forming seam by
method recommended by Carpet Manufacturer. Snap a chalk line to mark seam
4.0
5.
101
7.
8.
9.
100
Salvage:
location.
Turn each piece back approximately 3 feet from seam and spread adhesive uniformly
for 2 feet each side of chalk line.
Unroll one piece of carpet into adhesive. Rall out air bubbles towards seam. Unroll
second piece toward spam and work cut edge into adhesive to pick up suffic�ent
adhesive to "buttes" seam. Ro-11 out air bubbles in second piece toward seam.
Rod[ up uncemented portion of first piece toward seam. Apply adhesive and unroll
carpet into adhesive. Roll out air bubbles away from seam. Da likewise with
second piece but omit adhesive for 2 feet from uncemented edge where next seam
will occur., Cut off excess carpet.
Cut next length of carpet and lay in place,, Repeat installation procedure,
Use seam adhesive along trimmed edges of seamed area.
At columns and other penetrations, cut carpet with maximum passible overage.
Position seams made by these cuts first.
Use carpet bars at exposed edges.
A. Usable pieces of carpet [eft over from installation are property of Owner. Roll neatly and
store in one location. in building. Remove scraps and trimmings from site.
Rexburg Junior Seminary
547-2344-8Q-32
Tufted Carpet Direct Glued
09687
993
Febr
uary 1
!K�
i
i
CITY OF RExBURc
BUILDING PERMIT CHECK LIST
3 C, 14 "r -q 7/ v 11
5!7-cf p wt