Loading...
HomeMy WebLinkAboutAPPLICATION & DOCS - 93-00002 - LDS Church Junior Seminary Building - Remodeld 7F APPLICATION FOR BUILDi CITY OF RE]CBURG r a NG PERMIT pa�� Q� Application 229 1993 Permit Na. - CONTRAC'T'OR Name LDS Church mmmbammmv� -- Name_ 271.0 West Sunrise Street Address Rim Road Stree Not selected yet Mailing Address P.O. Box 15309 Mailing Address City, State- Bo.is Idaho City State r Zig X37Telephone 208-342-2735Zip� �elephone- 0 5 Call, Nielson Bc & Assoc. 116 alls,�,-Jdaho :[Za. Lic. No.,,AR Architect or Engineer.Lng ACH T. D . PTION _(ATT ---COPY - I � M Lot No Block. ion j l west I Nora y_RexburL� Idaho informationproject X E:duca-Eional Gov I t X Religiouf3 -Residence r Fence Patio carport Garage Awning a l NewX Remodel Addo .r Repair structure: y - 1, 04 U U 0 I He 3*1 g Total Floor Area 5 180 Number of Stories,�,..�: MP foot 70 �i --� ;,Finish d tpti age4 3-- mhprko� Whatw'11' structu for (include re am app lSemin nits use is mul t l family(apartments) Estimated cost Use Classification r E- Type r III i h r s one Building iL pluming permit Fees wazer u sz)e signature 1 Signature issued by Plan Cheek Fees I� Digging Permit Fee Other Fees 0 A. CALL, NELSON, BODILY & ASSOCIATES., P.A. ARCHITECTS q.90JOHN ADAMS PKWY P,O. .SOX 221 'HO'DAHO FALLS, IDAHO 83403 PHONE 208152V877,9 01V1P0RTAN'T_N_0T Lqmiblc� con_ciiioR_ f) April 5, 1993 E: This is a fax addendum ase call 522-8779 f 2 W, TCC o If all Daae ADDENDUM N0. 7 re not received *Q1 This addendum applicable to work designated herein shall be understood to be and is an Addendum and as such shail be pari of and included in the Contract%r To all bidders for furnishing all tabor and materials necessary for-, Rexburg Junior Semi -nary Rexburg Idaho Failure its acknowledge receipt os this Addendum on the bld" proposal farm may result in rejecl:ic�n of your bid. W. 'id Openin; %_j Date.- April 80 1993 place Rexburg Junior Ser-nif-lary 3 e 112 W "r i'Y' of tf1 Rexburg, Idaho T i m e.m 2.Oo p.m. The owner his purchased the city building permit, plurnb"ng ��rrr���� ar�d paid Che city plan rev" i�w fee. ASI ath�r permits,, fess etc. are the responsibility of the Contractor. 2. Rooms 103, 1 & 1 14 ars to reserve new 5I8" 9YPSum board ar•id acoustical tile o,-1 the ceiling per the reflected ceiling plan. The existir�� ��ilin� til is to be removed to installing the new gYpsum board- (Roorr, finish schedule is incorrect). '3. Roorn 11 a., the existing ceiling is to remain as is in this roam. ��. Grass 'in existing lawn are -as shah be removed and replaced with 2" new topsoil and new lawn sod- Existing dawn is not to be repaired, t � _ L The following plumbing HVAC sub -contractors have been r the owner for bidding . No otherplumbing and/or HVAC subill be approved to do work9 on this project. United Plumbing J & R Plumbing Contin Heating & M Pimp/Htg Commercial Metal Wrks Rexburg, Idaho Idaho Falls, Idaho Idaho Fails, Idaho Shelley, Idaho Idaho Falls, Idaho �. Sheet A- 1 mrair7 floor plam. Millwork elevation ked for offices 104, 105 & 1 -1, 6 should be W/A-4 in lieu Of VSA -4 �. CPM scheduling as described in, section 01 310 is not required for this project. See the following section 01 :310 for revised schedule requirements, PROGRESS SCHEDULE .. Immediately after being awarded the Contract., prepare and submit for review an estimated progress schedule for the Work. progress schedule stiall be. in sufficient detail, to include but not be limited to: a. Significant elements of the Work, b. Time frame for each element of work with a beginning and ending point. C. Percentage of progress of �varlc placed or to be placed ;ri a monthly period" of time. d. Vaiue:3 of the ellernents of work and relationship of elements of work one to the other for the total work under the Contract. 2_ Progress schedule shall be updated monthly and submitted v+rrth each periodic estimate for partial pad, and shall show the original proqress schedule or revised progres.:J- schedule one entry for each itern of 'work as follows: a. Progress or work placed prior to period of partial payment thin tieing requested. b. Pr -ogress during period of partial payment being requested. G. Remaining work to bre done by each item of work and for total work remaining under the Contractd P-1- - - - ELECTRICAL ADDENDUM %F.M..q X 1 Eftfta-06 Ir-m-ftmo SUBJECT-, R i'K_NrnURG -SEMINARY APPIZOVED F Copia 4PS2G-_52-.2 120 GeMeza€ RIWAxic RP'U7S 1 Q)Immbia 6111-0-2-24-,1-120�AK COluMbiLa X111-.52-142-120LEw OAK N... - CALL, NIELSON, BODILY -& ASSOCIATES, P.A. ARCHITECTS 990 JOHN ADAMS PKWY • P.O. BOX 2212 IDAHO FALLS. IDAHO 83403 PHONE 208/522-8779 TO: City of Rexburg Planning and Zoning P.O. Box 280 Rexburg, Idaho 83440 TRANSMITTED HEREWITH: D SHIP DRAWINGS D TRACINGS 0 PRINTS D COPY OF LETTER OTHER TRANSMITTAL D SPECIFICATIONS C FOR,APPROVAL Q FOR YOUR USE AS REQUESTED ❑ REVIEW & COMMENT REMARKS: COMMENTS FS FURNISH AS SUBMITTED RR REVISE & RESUBMIT R REJECTED FC FURNISH AS CORRECTED FOR CALL, NIELSON, BODILY} ASSOCIATES, P.A. ARCHITECTS i �C Is I CALL, NIELSON, BODILY & ASSOCIATES, P.A. ARCHITECTS 990 JOHN ADAMS PKWY P.O.BOX 2212 IDAHO FALLSF IDAHO 83403 PHONE 208152218779 April 5, 1993 IMPORTANT NOTE: This is a fax addendum of 2 leaible condition n#ease_calf 522-$779 acres. If all ADDENDUM NO. t r-0116- M a received in This Addendum applicable to work designated herein shill be understood to be and is an Addendum and as such shad be pari of and included in the Contract.. To all bidders for furnishing all labor and materials necessary for: Rexburg Junior Semi -nary Rexburg Idaho Failure to acknowledge receipt of this Addendum on the bid proposal form may result in rejection of your bid. Bid, Opening Date: April 8, 1993 Place: Rexburg Junior Seminary 31 1/2 W 1 North Rexburg, Idaho Time: 2:00 p.m. � • The owner has purchased the city building permit, plumbing permit and paid the city, pian review fee. All other permits, flees etc. are the respflnsibiiity of the Con rac or. 2. Rooms 103, 1 & 114 are to receive new 5/$" gypsum board and acoustical file on the ceding per the reflected ceiling plan. The existing ceiling file is to be removed prior to installing the new gypsum board. (Room finish schedule is incorrect), 3 k 0 . doom 118 r the xi ifi rr-i 4- Grass in existing lawn ares shad be removed and new lawn sod. Existing lawn is not to be repaired. replaced with 2" new topsoil and r Ir 5. The fol'lowi*ng plumbing HVAC sub -contractors have been approved by the owner dor bidding, No other plumbing and/or HVAC sub -contractors will be approved to do work on this project, United Plumbing J & R Plumbing Cavan Heating M &. M Plmg/Htg Commercial Meda[ Wrks Rexburg, Idaho Idaho Falls, Idaho Idaho Falls, Idaho Shelley, Idaho Idaho Falls., Idaho 6. Sheet A-1 main floor pian: Millwork elevation key for offices 104,, 105 & 116 should be W/A-4in lieu of V/A-4 7. QPM scheduling as described in section 01 310 is not required for this prol'act. See the following section 0 1 310 for revised schedule requirements. 01 310 PROGRESS SCHEDULE 1. Immediately after being awarded the 'Contract. prepare and submit for review an estimated progress schedule for the Work. Progress schedule shall be in sufficient detail to include but not be limited to: a. Significant elements of �he Work. b. Time frame for each element of work with a beginning and ending poi nt. C. percentage of progress of work pl<acted or to he placed in a monthly period of time. d. Value of the elements of work and relationship of elements of work one to the other for the total work under the Contract. 2. Progress schedule shall be updated monthly and submitted with each periodic estimate for partial. pay, and sail show the original progress schedule or revised progress schedule one entry for each idem of work as follows: a. Progress or work placed prior to period of partial payment then being requested. b. Progress during period of partial payment being requested. C . Remaining work to be done by each item of work and for fatal work remaining ender the Contract. 04 Lftl_ W k, I F-7 F"3 F-9 Calumbin. 3: 'S2C-r-3i 12 Z:qr. F,ffiv" ,a Columbia 6111-52-2120LE-0AK Cobumbz�. `111-`42-142-120 -0AX r s �`- CALL, NIELSON, BODILY _& ASSOCIATES, P.A. ARCHITECTS 990 JOHN ADAMS PKWY P.O. BOX 221 IDAHO FALLS, IDAHO 83403 PZ 208152218779 April 71 1993 IMPORTANT NOTE:This is a fax ad condition please call 522-$77 o-dum of 3 K=191r3: 10 101el►�■NSIM aqes._ If it is not received. in leaible This Addendum applicable to work designated herein shall be understood to be and is an Addendum and as such shall be part of and included in the Contract. To all bidders for furnishing all lobar and materials necessary for: Rexburg Junior Seminary Rexburg Idaho Failure to acknowledge receipt of this Addendum on the bid proposal form may result in rejection of your bed. 1. The following plumbing HVAC sub -contractors have been approved by the owner for bidding in addition to those approved in Addendum no. 1, Housley Pumps Inc.. St. Anthony, Idaho 2. Reflected ceiling pian indicates 2 ceiling fans per room in classrooms 103., 1 & 114. The number of fans shall be 3 per classroom as shown on the electrical drawings. 3. Specifications Master Table of Contents Division 12 strike the words "Not Used". Division 12 isSpecifiused inthe catians. M0.0 4. See the attached specification for owner furnished and contractor installed carpe. Accessories including but not limited to carpet bars,. adhesive, etc. shall be furnished by the installer. VC 21 May 22 09 687 TUFTED CARPET DIRECT GLUED INSTALLATION ap 4& M 10 " M M 4• q& GENERAL -a PART I R M � me i " 'P W ma 4 W W .a Summary A. Included' But Not Limited Toy 1. Installation of Owner furnished carpet. 2. Furnishing and installation of adhesives and accessories. B. Rebated Work - 1 . Section 09 681 - Floor Preparation 1,2 References: A. ASTM D 2859-76., "Test Method for Flammability of Finished, Textile Floor Covering Materials" B. ASTM E 648-91, "Test Method for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source" C. NFPA 258-1982., "Standard Research Test Method for Determining Smoke Generation of Solid Materials" 1.3 Submittals: A. Operations & Maintenance Manual Data 1 - See Section 01 730. 2. Manufacturer's literature, or cut sheet 3. Color and style selection 7.4 Quality Assurance: A. Requirements of Regulatory Agencies 1 . Carpet specified Thall have been tested in accordance with ASTM E 648, ASTM D X859, and NFPA Z58, and shatl meet or exceed N.B.S. requirements for exits and corridors. 1.5 Project/Site Conditions: A. Environmental Requirements - 1 . See Sections 01 513 and 01 561 for requirements placed on General Contractor, 2. Contact Architect fay instructi ons in regard to conditions not covered ire this Section. 1.6 Maintenance-. A. Provide one year free service for correcting conditions resulting from faulty workmanship. Faulty workmanship shall include but not be limited to - i . Open seams 2. Over compressed (humped) seams 3. Frayed seams 4. Air bubbles or wrinkles 5. Failure to neatly butt to walls and around door frames. Rexburg Junior Seminary 507-2344-80-3 Tufted Carpet Direct Glued 1 09687 February 1993 21 r 62 PRODUCTS - PART 11 W = M M OW MW ® # f � i 2.1 Carpet: A. Secondary Backing 1 a Tufloc-Action Bac by J & J Be Lapp Pile Carpet by J & J 2.2 Glue -Down Carpet Accessories: A. Adhesive. - 1 . Multi-purpose Adhesive #251 by W 'VRI Henry Company, Humington Park, CA 2. Para -them M433 latex and M263 latex for seams. B. Carpet Bars - 1 . Deluxe pinless by Roberts. 2. Equal as approved by Architect prior to bidding. See Section 01 X30. -a � � � i, I& 'go 7- EF M -M No i .00 EXECUTION - PART III EW -W W .06 ! E i i -W � � � op W* 3.1 3.2 3.3 Examination: A. Notify Architect in writing if base is not acceptable. Do not lay carpet over unsuitable surface. Installation: A. Restrict use of small pieces of carpet to complete job with carpet available to small rooms other than office. B. Laying of Glue -Down Carpet 1. spread of adhesive not to exceed 40 square yards per 5 gallon paid. 2. Trim selvedge and two roves of pile from longitudinal edges. 3. Cut two pieces of carpet to length plus trim and Icy in place forming seam by method recommended by Carpet Manufacturer. Snap a chalk line to mark seam 4.0 5. 101 7. 8. 9. 100 Salvage: location. Turn each piece back approximately 3 feet from seam and spread adhesive uniformly for 2 feet each side of chalk line. Unroll one piece of carpet into adhesive. Rall out air bubbles towards seam. Unroll second piece toward spam and work cut edge into adhesive to pick up suffic�ent adhesive to "buttes" seam. Ro-11 out air bubbles in second piece toward seam. Rod[ up uncemented portion of first piece toward seam. Apply adhesive and unroll carpet into adhesive. Roll out air bubbles away from seam. Da likewise with second piece but omit adhesive for 2 feet from uncemented edge where next seam will occur., Cut off excess carpet. Cut next length of carpet and lay in place,, Repeat installation procedure, Use seam adhesive along trimmed edges of seamed area. At columns and other penetrations, cut carpet with maximum passible overage. Position seams made by these cuts first. Use carpet bars at exposed edges. A. Usable pieces of carpet [eft over from installation are property of Owner. Roll neatly and store in one location. in building. Remove scraps and trimmings from site. Rexburg Junior Seminary 547-2344-8Q-32 Tufted Carpet Direct Glued 09687 993 Febr uary 1 !K� i i CITY OF RExBURc BUILDING PERMIT CHECK LIST 3 C, 14 "r -q 7/ v 11 5!7-cf p wt