k . SECTION 15450
LOW PRESSURE STEAM BOILERS (HOT WATER BOILERS)
GENERAL:
�.
Requirements: The requirements listed under General
Conditionsf�Special Conditions and General Requirements are
applicable to'this- section and farm a part of the Contract.
2. Perform all work awarded to the crafts of this contractor by
reason of labor agreements and jurisdictions at no additional
cost to the Owner*
SCOPE:
This section covers the labor, materials, and equipment necessary
to complete tasks including, but not limited tv:
1. Furnish and install three (3) new �., 738 MBH output haIF
t.
water boilers and associated equipment for heating
system.
2. Provide breeching and stacks for new heating system hat
water boilers and domestic hot water boiler.
3, Provide and install one (1) new 546 MBH output domestic
hot water boiler with integral pump.
4. Provide and install new drip pans on four (4) new hot
water boilers,
5 . Provide start-up and tune-up of new bailers.
RELATED WORK INCLUDED EL'SEWHERE:_
61,
Basic piping materials and methods
Insulation - see Section 157a0.
Electrical. - see Section 16000.
BEATING HOT WATER BOILERS:
1. General:
- see Section. 15100.
This Contractor shall furnish three (3) 2470 MSH input natural
gas firmed (minimum 84% thermal efficiency) hot water hailers.
2. Bailer Des ign:
A. The boiler shall be constructed using a copper fin water
tube design.
SECTION 15450 - 1
ig
W
Madison High School
Boiler Installation
Rexburg, Idaho
B. Burners: Gas burner assembly shall be an integral dart
of the bailer. Burners shall be tubular alloy steel.
Burner shall utilize a hot plate ignition type system
with flame safety controls.
C* Construction: Each boiler must be supplied fully
assembled including burners and mo��xle jacket,
individual boilers must be mounted on corrasion -resistant
support legs. Boilers shall be assembled in such a
fashion as to permit access to piping and controls from
the front.
D. Boiler Controlse Each boiler shall be equipped with a
combination gas valve with m�r�ual shut-off , pressure
r'egula,toz'r, and 100°s automatic shut-off. Gas train shall
conform to ASME code CSD -1 and insurance carrier.
EO Bailer Pressure Valve: Each boiler must be equipped with
a pressure relief valve (ASME) . Valve shall be piped to
floor iof bailer drip pan,
F • Drain Cock: Manufacturer shall provide a drain cock for
system water as standard equipment.
G. Pressure Rating: Boilers shall be constructed for 50 PSS
maximums working pressure and shah be foundry tested. in
accordance with ASME Code,
H• Approvals : AoGvA., and ASME approvals must be clearly
marked on each boiler.
Y. The system shall be equipped with pressure gauges
F
temperature gauges, water level sight glass and direst
afire kit.
J. System Low Weer Cut -of f; The manufacturer shall supply
a low water cut-off.
3. Manufacturers
a. Lochinvar CHI32070.
Plans and specifications have been designed utilizing Loch invar
copper fin series boiler,. Any mvdificativns, to piping, flues or
other boiler -related service, due to a change in boiler dimens0
ions
configurations, or arrangement, shall be made at no additional cost
to the Owner and completely provided by this Contractor, The
engineer reserves the right to approve any such modification.
SECTION 15450 - 2
Madi'sonH'gh School
Boiler Installation
Rexburg� Idaho
TT,
ExeCUtion:
a . Install and connect into an operable system three {3 new
hod water boilers per mechar��.ca� drawings and
manufacturerfs directions.
• Pipe pressure relief valves to floor inside of new bailer
drip pans.
Install flues per applicable codes.
,START-UP AND TUNE -
Upon-
Upon completion of boiler installation, the boiler manufacturer
shall provide astart-uta technician. This technician shall provide
the fallowing servicers, at a minimum:
1. Perform safety checks and initial start-up of boiler.
2. Train operators as to prayer
procedures,, troubleshooting
maintenance procedures,
start-up and shut down
methods, and normal
Upon completion of boiler Mart up and safety checker the Contractor
shall provide the following services:
1. Boil --out of bailer and new piping prior to platingin
sex -vice as per ASME code Section 6 chapter 7 and
manufactures recommendations. Including but not limited
to the following:
a. Fill system to operation level and vperat� at
specified condition for at least two -(2) days.
b. Provide a bojLl out compound of caustic soda and
trisodium phosphate,
ce operate at- ''specif ied temperature for at least five
(5) hours.
d. Wash and flush system thoroughly using water.
e• If the above procedure provides unsatisfaetvey
results repeat steps b, through d..
DOMESTIC HOT WATER BOILER.W
General.0
This Contractor shall furnish ane (1) 54G MBH input natural
SECTION 15450 -- 3
Madison High School
Boiler Installation
Rexburg , Idaho
gas fired minimum 85% thermal efficiency) hit water boiler.
2. Boiler Design:
A. The boiler shall be constructed using a copper fin water
tube design.
B. Burners: Gas burner assembly shall be an inte,gralpart
of the boiler. Burners shall be tubular allay steel.
Burner shall utilize a hat plate ignition type system
with flame safety controls.
c. Construction: Boiler must be supplied fully assembled,
including burners and module jacket. Bailer must be
mounted an corrosion -resistant support legs, Boiler
shall be assembled � such a fashi
ion as to permit access
to piping and controls from the front.
D. Boiler Controls ; Boiler shall be equipped with a
combination gas valve with manual shut-off, pressure.
regulator, air pressure switch, and 1D0% automatic shut-
off. Gas t
rain shall conform to ASME code CSD -1 and
insurance carrier requirements.
E• Boiler Pressure Valve: boiler must be equipped with a
pressure relief valve (ASME). Valve shall be piped to
floor inside holler drip Baan.
Fe _ Drain cock; Manufacturer shall provide a drain cocfor
system water as standard equipment
G. pressure Rating: Boiler shall 'be constructed fvr 50 PSI
maximum working pressure and shall be foundry tested in
accordance with ASME code.
H• Approvals : AaGaAe, and ASME approvals must be clearly
marked on boiler.
I. The system shall be equipped with temperature gauges
manufactures high velocity pump, and dorect aixe kzt,
ja System Low Water Cut'Off : The manufacturer shall supply
a low water cut-off.
3. Manufacturer:
a- Lochinvar CFN650PM.
Flans and specifications have been designed utilizing Raypack H
series boiler, Any Mod if mations to piping, f lue, or other boiler�
related service, due to a change in boder dimensions,
SECTIQN 15450 — 4
Madison High School
Boiler Installation
Rexburg , Idaho
configurations, or
to the Owner and
Engineer reserves
4. Execution:
arrari+gement, shall be
completely provided
the right to approve
a. Install and connect into an
domestic hat water boiler
manufacturer's directions.
b• Pipe pressure relief valve
pans .
made at
by this
any such
no additional cost
Contractor. The
mvdif ications .
operably system one (1) new
per mechanical draw
ings and
to f loor
BC3ILER START-UP AND TUNE-UP ;
Upon completion of boiler installation,
shall provide a Mart -up technician. This
the following services, -at a minimum:
inside boiler drip
the boiler manufacturer
technician shall provide
1.0 Perform safety checks and initial Mart -up of boiler.
2. Train operators as to proper
procedures . troubleshooting
maintenance pr-ocedures .
MI SCELLANEOUS
Furnish and install all necessary
other items rewired to carry
control sequences. All wiring
National electrical Code,
END OF SECTION 15450
start --up
method ,
and shut _ dawn
and normal
relays , switches, enclosures,
oUt the power requirements
to be in conduit and conform
SECTION 15450 -
and
and
to
5
Madison High School
Boiler installation
Rexburg, Idaho
DIV. 15 - SECTION 1.5700
INSULATION
GENERAL
10 Requirements: The requirements listed under General
Conditions, Special. Conditions and General Requirements are
applicable to this. section and forma pari of the contract,
2.6 Work to be Performed@* Perform all work awarded to the crafts
of thIs Contractor by reason of labor agreements and
j urise�ictivns at no additional cost to the Owner,
SCOFF
This section covers the lobar, materials and equipment necessary to
complete tasks including, but not limited to:
1.
Providing of insulation, jacketing, and fittings for X11 new
supply and return hydronic water piping.
EXAMINA'`I'I4N OF SITE:
3. Examine
word is
will be
the site and be informed of all conditions under which
to be done before submitting proposal. No allowance
made for extra expenses on account of error.
2. Information shown
available records
shall be regarded
relative to existing services is based upon
and data during preparation of drawings and
as approximate only, Make deviations found
necessary to
conform with actual locations and conditions
without extra cost.
FiELD MEASURIXENTS:
The Contractor shall verify the dimensions and conditions governing
his work at the building. Na extra compensation shall be claimed
or allowed on account of differences between actual dimensions and
those indicated on the drawings. He shall examines adjoining work,
on which his word is dependent for perfect efficiency and shall
report any work which must be corrected. No waiver of
responsibility for defective word shall be claimed or allowed due
to failure to report unfavorably conditions affecting his work.
COOPERATION WITH OTHER TRADES:
1. The Contractor shall give full cooperation to other trades and
shall furnish in writing to the General Contractor, with
SECTION 15700 - 1
Madison High School
Boiler Installation
Rexburg, Idaho
copies to the Architect /Engineers any information necessary to
permit the work of all trades to be installed satisfactor ily
and with the least passible interference or delay,
MATERIALS
Pipes Insulation:
Insulate
Thickness
service,
Fittings:
All p40
ipe
f itting
possible.
finished
piping with Manville Micrvlvk with
of insulation shall be determined by
as shown in table l of Section 0170t} .
PVC Jacketing.
pipe size and
fittings shall be ins
ulated with factory molded PVC
covers and f actory pre-cut insulationiLns erts, where
For noon -standard P IV dF $
ipe 3oints, use trimmed fiberglass,
with �a ski m n n a � r, � ,F ; ,., ; .,., ti - --- - - -
5urra�ce. Wrap
vapor -sealing
INSTALLATION:
-- --- -.. -�-��� �-L �-X11-�������y cement to farm a smooth
the joint with 211 fiberglass mesh tapes and apply a
fitting mastic.
Pipe Insulation:
Apply insulation over glean, dry pipe with
together. Seal butt i n; r,f c! A]-. :
I
nsulation,
successful
per Sect ion
Fittings:
CA K�l Z> V t -,-a
Note: Insulation shall no
0
all joints firmly butted
strips supplied with the
be aonl i ar3 hafr„-e
-J11P--uu--on o= nyarostatic tests.
150001when.insuiatian system is
Apply per manufacturers
adhesive backed tape to
pipe insulatian,
Apply pipe markers,
complete.
instructians, Use a 2" plastic coated,
seal the point between the eaves and the
SECTION 15700 - 2
H
f
U)
}
.H
J: I-
- rA
rd
::) N
14
E-1
�o
o
4-)
F
0
tn
VI
r -I
r --i
rlA
x
En
m
+J
Z
O
H
H
z
H
co
Ul
44
*moi
Ia
IN
rZ
Wir
m
f
U)
}
P4
J: I-
- rA
m
f
U)
�s
P4
J: I-
- rA
rd
::) N
0
LO
u
0 CD D
N
'-
r -i r -i
mom Omm LO
N CN H H r -A o
9 0 a 16 i
H
40 ■ •- 6 0 a ! I I I
f
U)
�s
P4
a4
rd
14
E-1
0
LO
u
0 CD D
N
'-
r -i r -i
mom Omm LO
N CN H H r -A o
9 0 a 16 i
H
40 ■ •- 6 0 a ! I I I
OFMW
pri
4J
tp
a
44
# �-•
rd
a)
0
x
a)
ul
OF rA
0
Q)
0
m
0
4
f
U)
�s
P4
a
rd
sD4 Ln
�o
o
4-)
0
En
m
+J
a)
-P
-P
CO
rd
c�
a0�
ldb
x�a
}
-P-1
,
;J
` '
#-i�
J
U
j
+�bql
•
a
i^F
1
;j
Pr
ir-i
-r-I
I
r --1'#H
-rq
•
0'
co
OFMW
pri
4J
tp
a
44
# �-•
rd
a)
0
x
a)
ul
OF rA
0
Q)
0
m
0
4
z
0
H
P
m
0
LO
H
0 -ri
U)
�s
P4
a
sD4 Ln
�o
o
4-)
0
En
m
+J
c�
a0�
ldb
x�a
z
0
H
P
m
0
LO
H
0
Madison High School
Boiler Installation
Rexburg, Idaho
DIV. 15 - SECTION 15715
WATER BALANCE
GENERAL
REQUIREMENTS
Conform with applicable provisions of Division 1 ,
Conditions. and Supplementary General Conditionsa
SCOPE 4F WQRI{.
General
Perform water balancing of heating equipment and d'stribut*on
systems.
RELATED WORK:
Section 15450 Boilers, 15140 Piping Specialties Equipment.
QUALIFICATION:
�`
Balancing Contractor shall be a firm with at least 2 years of
successful experience , on
requirements similar to thoserreects uired fob t����ng and balancing
Of systems will not be acceptable as Balancing �contractor,sect. Installer
RELATED RE UIREMENTS:
Supplementary Conditions 0
Installing Contractor until
and balancing.
UALITY ASSURANCE :
The organization which
member in good standing
of either:
Retainage shall
final completion of
be withheld from
testing, adjusting
performs the service shall be a
certified tv perform the services
1 . Associated Air Balance
2. National Environmental
Within 3 d days
representative
services.
Council (AABC)
Balancing Bureau (NEBB)
current
required
after award of contract, transmit to the er•
the name of the organization proposed to perform the
Comply with applicable procedures and. standards of the
certification sponsoring associa�ivn, either:
"National Standards far Field Measurements and
Instrumentation, Total Systems Balance, Air Distribution -
SECTION' 15715 - 1
Madison High School
Boiler Installation
Rexburg, Idaho
Hydroponics Systems", dated 1974 by AABC,
"Procedural Standards dor Testing, Adjusting,
Environmental Systems", dated January, 1g'771
Perform services tender
designated and qualified
sponsoring association,
Calibration and
requirements of
each instrument
and Balancing of
by EBB a
direction of a supervisor who
under certification. requirements
maintenance c
the standards,
and available
is
f
f instruments
I
in accord with
and calibration histories f or
for examination.
Accuracy of measurements shall compl
standards. y with requirements of the
SUBMITTALS:
A, At least fifteen days
inspection, submit
applicable reporting
JOB CONDITIONS•
prior to Contractor's request for f 0,
o jnal
three copnal reports on
forms, for review.
Prior to the start of testing, adjusting and balancing, verify that
required "Job Conditions?'are met:
i, Systems installation is complete and in full. operation.
2. outside conditions are within a reasonable range relative to
design conditions.
1P
3- Examine the air hand!*ng supply and exhaust systems to sem
that they are frees from obstruction. Determine that dampers
and registers are open; that moving equipment is lubricated;
that filters are futncioning; and perform other inspection and
maintenance activities necessary for proper c�peration of the
systems.
Verify that requirements for preparation for testing and havebalanc-ing been met for elements of each of the systems which requites�.ing . r
EXECUTION•
PROCEDURES - GENERAL:
Comply fully with the' procedural standards of the certifying
association under whose standards service will be performed.
1. Execute each' 'step of the prescribed TAB procedures without
SECTION 15715 - 2
04N
D
io
Madison High School
Boiler Installation
Rexburg r Idaho
-miss ion .
2• Accurately record the required data.
WATER BALANCING: _
Make measurements in accord with recognized procedures and makepracticesof practices of the certifying associations.
Measures wader volume at each unit and adjust flaw to design
quantities within ten percent over or under.
Adjust pump flow for required water vvlurne.
Measure and adjust water flow through boilers to temperaturedeliver design conditions .
Adjust flew control valves , pressure regulating valve, compion
tanks charging valve and aim separator for design cond�tir�ssans.
Measure coil pressure drops � and total pressure across the hydropic
system.
Evaluate building and. room pressures cond.i.tiQns to determine
adequate supply and return water quantities.
Evaluate space and zone
adequate conditions to determiadequate performancene
wiwithout draft of the systems to maintain temperatures
.
Nark flaw control valve final position.
COORDINATION.
Coordinate services with the work of the carious trades to ensure
rapid completion of the services.
Promptly report to the
noted during performance
action .
END OF SECTION 15715
C}wnerfs representative any deficienc�.es
of services to allow immediate corrective
SECTION 15715 - 3
Madison High School
Boiler Installation
Rexburg, Idaho
DIV.
GENERAL
16 - SECTION 16000
ELECTRICAL
1- Re uirements: The requirements listed under General
Conditions, Special Conditions and General Req
uirements are
applicable to this section and all subsequent sections of
Division 15 and form a part of this Contract.
2 • Work to bePerforme
of this Contractor
jurisdictions at no
SCOPE
Perform all work awarded to the crafts
by reason of labor agreements and
additional cast to the owner.
This section covers the Labor, Materials and Equipment necessary to
complete tasks including but not limited to:
1. Supply, install, :and connect power circuits t0 the new
circulating pumps.
2. Provide and install conduit for new bailer controls;
coordinate with Section 15400 and 15900.
FEES PERMITS AND REGULATIgNS
1 • The Contractor shall obtain and pay for any and aller
required in the installation of this work, p mets
2. Where speciti�ations and drawings require higher standards
than applicably ordinances or statutes, speca.f*cat loons and
drawings shall take priorit�r. 'here specifications and
drawings violate applicable ordinances or statutes, the latter
shall take priority.
3. All work and materials shall be in full accordance with the
latest applicable Stat, City, County and Local regulations
and ordinances. Nothing in these specifications or drawings
is to be construed to permit work not conforming tc� these
codes. The Contractor shall hold and save the Owner and
Engineer free and harmless from liability of any nature
arising from his failure to comply with codes and ordinances,
4. Items which are not covered in Local, and State codes shall be
installed per the Latest edition of the following codes,
Madison High School
Boiler Installation
Rexburg, Idaho
a• National Electrical Code published by National Fire
Protection Association.
EXAMINATION OF SITE.
I'm Examine the site and be informed. of all condition's under which
work is to be done before submitting proposal, Na allowance
will be made dor extra expenses on account of error.
2 • rnfQrmationi
shorn relative to existing services s hosed upon
available records and data during preparation of draw ings and
shall be regarded as approximate only, Make deviations found
necessary to conform with actual locations and conditions
extra cost.
MELD MFASURMENTS0
The Contractor shall verify the dimensions and conditions
his work at the building. No extra compensation gavernin
sha1Z be
claimed
or allowed on account of difference between actual dimensions and
those indicated on the drawings. He shad examine adolrizng work,
on which his work is dependent for perfect efficiency and shall
report any work which must be corrected. No waiver of
responsibility for defective work shall be claimed or allowed due
to failure to report unfavorable conditions affecting hi
s work .
DRAWINGS:
1•
Installation changes necessary to coordinate with ether work
or to meet architectural or structural candi�zons shall be
made without additional cost to the Owner.
2. For purposes Of clarity and legibility, drawings are
essentially diagrammatic to the extent that many offsets,
bonds, special fitt#ngs and exact locations are not indicated ,
Make use of all data in all Contract Documents and verify
information at site.
3. All dimens-ions and locat�.ans of equipment, door, partitions,
f ixtures, grille, etc. , are to be taken from the plans but
shall be verified at the jab site, Dra
saledwings are not to be
.
4. Equipment is indicated only in its approximate location. The
Contractor shall locate outlets and apparatus symmetrically
and shall coordinate such locations with work of other trades
to prevent interferences.
50 The Contractor shall submit to the Engineer one sed of as --
built drawings at the close of the project,
SECTION 16000 - 2
Madison High School
Boiler Installation
Rexburg , Idah[]
DEMOLITION AND AI,TERIITIONc
Contractor shall
installation of the
adjoining materials
do all cutting
electrical work,
and finish.
COOPERATION WITH, OTHER TRADES
and patching required for
Patch areas shall mach the
� . The Contractor shah give full cooperation to other trades and
shall furnish. in writing to the General Contractor, with
copies to the Architect/Engineer, any information necessary to
permit the wvrl� of all trades to be installed satisfactorily
and with the least possible interference or delay.
2. Where the work of the Contractor will be installed in close
proximity toor will interfere with work of other -grades, he
shah assist. in .workingout space conditions to make a
satisfactory adjustment. If so
Contractor shall prepares
sections ata suitable scale
showing how his work is to
work of other trades, If 1
before coordinating with Qtr
interference with work of t
necessary change- in his ,
without extra charge,
----- .�u ul 411 + -L %-.-LL.L UUc: L, the
composite working drawings and
notless than 1/41f=11011 , clear
installed
ly
be in relation to the
the Contractor installs his work
ger trades , or so as to causes any
other traders, he shall make the
work to correct the conditions
3 • The Contractor shall furnish, to other
necessary templates, patterns, settin
for the proper installation of work
adjacent work.
DELIVERY AND STORAGE*
trades,. as required. all
g plans, and shop details
and for the purpose of
10 Deliver materials in ample quantities from time to to as
necessary for uninterrupted progress of the ��rk. Store so as
to cause the least obstruct zan to the premises and distribute
to prevent overloading to any portion of the structure.
2. Provide all temporary storage and shop areas that are required
at site for safe and groper storage of materiels, tools and
other items used in the performance of the wank, Construct
only �n approved locations and do not interfere with work of
any other trade.
3• Protect materials and equipment furnished under this section,
either stormed or .installed, until f�x�al acceptance of the
project as a whole.
SECTION 16000 - 3
Madison High School
boiler Installation
Rexburg, Idaho
4. Damage
shall
or defect
be made goad
5. Provide
materials
unload'
ng
developing before acceptance of the work
at Contractorls expense.
all equipment and
for this proj ect.
materials.
TEMPORARY SERVICES:
manpower required to. unload
owner will not assist in
Provide temporary services when
interrupted in connectian with worknf i-i"dn
any
of
nerinci
aria approved by
INSPECTION:
1. Do n�ot allow any work to be
i 11 C Y1 in r7
existing services are
this section beyond the
owner.
covered-upor enclosed until
L,.,? 1,.0 � Gu, L.t�5 mea ana approved by Architect/ Engineer or other
authorities having jurisdiction over the wox,
2. Should any work be enclosed or covered -up before such
inspection and test, Contractor shall at his own expense
uncover wvrk, and after it has been inspected, tested and
approved, make all repairs as necessary to restore all work
distributed by him to its original condition.
CLEANING
The Contractor shall at all times keep the Owner's premises and the
adjoining premises, and roadways clan of all rubbish caused by the
Contractor's operations and at the completion of the works hall
remove all rubbish from and about the premises, and all histools,
equipment, temporary work and surplus �,aterlals and shall leave the
area clean and easy dor occupancy �y the owners During the
progress of the work the contractor shall clean up after his
employees and shall leaves the premises and all portions of the
building in which he is working frees of debris and in a clean and
safe condition.
GUARANTEE:
All work under this section shall be guaranteed in writing to be
free of defective work, materialsor parts f or a period of one(iL)
year after f inal acceptance of the worke work rewired to repair
or replace defective workmanship materials or equipment shall be
done at no cost to the Owner Furnish a letter of guarantee to the
General Contractor dor inclusion in the maintenance manual.
MATERIALS:
General
SECTION 16000 - 4
0
0
Madison High School
Boiler Installation
Rexburg, Idaho
All Material required
9
4-
f or a complete and operable electrical
snail be new, first qual
subject to approval ofEn
ity of their respective kinds,
raceways: .the gineer.
- 2• electrical metall�.c tubing (EMT) shall be installed in all
areas except those areas required bY �vd� to have ri id
conduit. ELMZ` shall be UL approved standard weight electro_
galvanized steel, 1/2 inch minimum size.
2Flexible metal conduit shall be installed where allowed by the
National Electrical Code unless shown ot}-�eonthe
drawings. Liquid tight flexible conduit shall bw1setall�d �.rk
wet locatic�ns . Liquid tight flex shall be grounding type with
QVC jacket, Sealtite or approved equal.
3 • Conduit fittings for SMT shall he watertight on outside walls
and set screw on inside walls.
ap►proved All fittings shall be UL
.
49 Small junction boxes (4-11J16 in. sq, and smaller) shall be
stamped from. one piece of sheet. steel and shah. be galvanized.
Constructi�n,of all boxes shall cQmply with the NEC, article
37D -2Q.
l- Minimum wire, size of power conductors shall be No. 12 AWG
copper. Control conductors shall be No. 14, AGOG unless shown
otherwise on the drawings or specified otherwise herein. Wi
size No. 20 AWG and smaller shall be solid, and wipe re
size -No. s AWG and larger shall be stranded. InsulationInsulation
conductors shall be rated for a miniVOmum ❑f 5pp
for conductors shall be thermoplastic Feat resist type THHN
for wires size No. 8 AWG and smaller and h+�at and moisture
resistant Type THW or XHHW on wire size No. 6 AWG and larer,g
insulation types shall be as defined by the NEC, Ar�ticle I
Aluminum wire shall not be used an t
his project.,
2. System ground conductors shall be sized per NEC, Article X50
and as shown on the drawings. Conductors shall be bare.
stranded, medium i _soft drawn capper: No . 12 AWG wire, when
used for grounding, shall be solid conductor with green
insulation.
INSTALLATION- GENERAL:
Raceways: -
1. Conduit ends shall be mut square and reamed With a tapered
reamer to remove all interior burrs and sharp edges,
SEC3'ION 16000 - 5
10
Madison High School.
Boiler Installation
Rexburg, Idaho
2• Exposed conduit shall be installed parallel with or at right
! angles to the building Sines of the structure. �
3. Straight run conduits shall be supported at equal intervals. of
not more that 8 ft, Angle bends shall be supported within 3
� ft. on each side of the bend.
IV
0
Crushed or damaged conduit shad not be instal'ied.
'threaded conduit shall be swabbed to remove all
grit, dirt, or other foreign mater before
1b
installed.
Dl�. , 111O1St11re J,
conductors are
6• Installation of liquid tight flexible metal conduit shall
conform to the NEC, Article 351.
7- Doable lockouts and screw an insulating bushing shall be
installed on all conduits entering boxes, cabinets. v�
fittings where loc'knuts are. required.,
Ground bushings shall be used where required by NEC and on
feeders for equipment grounding.
All necessary precautions shall be 'taken to prevent undue twisting
or wired conductors and/or breaking of insulatoivn when pulling the
wire into conduits. There shall be at leash 8 a.n, of wire
remaining at a 31 boxes for the purpose of making connections or
splices. All conductors shall be identified with wire makers
Ci panel and circuit number, having phase markings where
applicable , at terminations and at all junction boxes where splices
or taps may be made. Wires markers shall be T&B vinyl, self
adhering, oil and moisture resistant types or approved equal. The
use of cloth adhesive labels for wire markers is prohibited.
Splices shad be made electrically and mechanically secure
pressure type connectors. Pressure type connectors shall
Wing nut or appro�red equal for wire No,6 AWG and smaller;
4 AWG and larger use a crimp tyke connector, Surndy or equal
Wire calor codes shall be afallaws:
be Ideal
for No.
I co
d.
Black - Phase. A
Red - Phase B
Blue - phase C
Green
White
or Bare
or Gray
Ground
Neutral
a
SECTION 16000 - 6
Madison High school
Bailer Installation
Rexburg , Idaho
Conductor color
0
wire or gaped o:
green conductors
for phase or hot
TESTING•
codes
l +2I1d5 .
taped
shall he by means of color full length of
Whites yr green conductors, or white or
or painters another color r
conductors on this project,
shall not be used
�. General: Uponcompletion of installation, furnish all
equipment and personnel to conduct all tests required to
secure approval from all agencies having jurisdiction.
2. Criteria:
a. All systems shall test free from short circuit and
ground, and shall be free from mechanical and electrical
defects .
b. All systems shall show proper neutral connections and
wire color cages.
CLEAN UP:
i• Upon completion of
clean all equipTnent,
END OF SECTION 16060
all
installations larnp�,ng;- and testing,
remove aYl truction debris.
SECTION 16000 - 7
Madison High School
Boiler Installation
Rexburg, Idaho
DIV.
GENERAL:
16 - SECTION 16150
1. SECTION 16000 - GENERAL P�DVISI�NS, ELECTRICAL app Lies t
specified �n this section, v work
2• Furnishing and install
'Ing panelboards and wiring
required to result in a cvm�lete electrical distributces
System that is shown in general by the contract drawings ion
3, mmu.
Work Included:
A. Furnish and -connect one 1D0 Am1p,distribution panelboard fir 12a/4p, � 1 base breaker
=service. Provide for surface installation. � wire
B. Furnish and install breakers for new panelboard as
required for new equipment connections to new panelboard.
4. Submittals:
A- Shfl T7rawin s: identify panels by alphabetical leiter
ani. .numeral with branch circuit breaker Sizes and type
indicated in panel schedules or one -lines diagram.
Be Guarantee .
PRODUCTS:
1. Liahting__ani Power
A. Acceptable
Panels:
Manufacturers
1 •
Panels Same manufacturer for all panels on
1
project: Westinghouse; GE; Square D
1 Sylvania;
Cutler -Hammer Co.; ITE Gould; and Federal Pacific.
2. Design of -distribution system based on Square D
equ.ipment. Contractor shah be responsible for
changes required to install other manufacturersjF
Ob
equipment, if dimensions are larger than Square D.
B. A11 Panels_ halted --on circuit breaker type. Plug-in
circuit breakers not. acceptable.
1 . Provide with non -insulated equipment grounding
terminal strip located in top or bottom gutter
including main groundingiVlug and indidual
SECTION 16150 - 1
Madison High School
Sailer Installation
Rexburg, Idaho
terminals f or
including spare
accordingly for
at least 50a of panel
ClrCultS I increase Butt
grounding strip.
circuits
er space
29 Equip bus bars for panelboard with main lutis
main circuit breaker, capacity a� requir d or
indicated,
3. Provide panelboards with branch circum connection
to main bus arranged for sequence phas'ng,
drawing panel schedules. per
4• All multi -pole breakers shall be single handle and
common trip.
5 • Provide sub-feed lugs for 2 section panels,
c, branch Circuit Panels; 120/240 V, 1 phase, 3 wire.
D• Panelbvards; Dead -front type equipped with automatic
branch circuit breakers for each branch circuit.
1• ..Provide : special features such as sub -feted lues,
f.eed-through lugs, ii, htzng contactors , extra -width
gutters, grounding bus, etc,, as required by
drawings or specification.
2. Design so a combination of one, two and three pale
circuit breakers can be readily assembled in same
panel.
E. Circuit Breakers; Thermal -magnetic type unitconstruction, employing quick-make and quick -break boggle
mechanisms far manual operati
operation . on as well as automatic
1. Handley with three p�si
"TRIPPED" . tivns: "C3FF"• "ON" and
2 • When circuit breaker opens on overload or short
circuit, operating handle shall automatically
assume "TRIPPED" position and clearly indicate
abnorma 1 �ond.�tion of circuit _
3. Units operable in ariy POsition and removable from
front of panelboard without disturbing adjacent
units.
4- Tandemor
P
half-size
circuit breakers
not allowed.
SECTION 16150 - 2
W
Madison High School
Boiler Installat4
ivn -
Rexburg, Idaho
F• Two and Three Pole Circuit Breaker Rain s;
1 •
120/240V Branch Circuit Panels : Minim
AIC symmetrical, um lo, 000 RMS
G . Cabinets@ Trim, door and box of �a�vanized sheet steel,
Code gauge.
1. -5-3/4 inch. deep, with gutter space of at least 4
inches on all sides around lighting panelboardst
and greater for power panels.
2. Fasten trim to0cab
adjustable clamps. net by means of approved
3• Equip do
catch or with chrome -plated combination lock and
upply two milled keys with each lock; key
locks alike.
4 - Provide directory frame on inside of door.
5. F%: Primed, one coat gray lacquer.
H. Identify all circuit locations in each respective panel
with load and locatlOn served.
EXECUTTON .W
1. Installation.
A• Install as indicated
manufacturer's recammendat
END OF SECTION 1610
and in accordance
ions and instructions.
h
SECTION 16150 - 3