Loading...
HomeMy WebLinkAboutBOILER INSTALLATION PACKET 2 - 94-00029 - Madison School District - High School (Jr High) - Boiler Room RemodelMadison High School Bailer Installation Rexburg , Idaho k . SECTION 15450 LOW PRESSURE STEAM BOILERS (HOT WATER BOILERS) GENERAL: �. Requirements: The requirements listed under General Conditionsf�Special Conditions and General Requirements are applicable to'this- section and farm a part of the Contract. 2. Perform all work awarded to the crafts of this contractor by reason of labor agreements and jurisdictions at no additional cost to the Owner* SCOPE: This section covers the labor, materials, and equipment necessary to complete tasks including, but not limited tv: 1. Furnish and install three (3) new �., 738 MBH output haIF t. water boilers and associated equipment for heating system. 2. Provide breeching and stacks for new heating system hat water boilers and domestic hot water boiler. 3, Provide and install one (1) new 546 MBH output domestic hot water boiler with integral pump. 4. Provide and install new drip pans on four (4) new hot water boilers, 5 . Provide start-up and tune-up of new bailers. RELATED WORK INCLUDED EL'SEWHERE:_ 61, Basic piping materials and methods Insulation - see Section 157a0. Electrical. - see Section 16000. BEATING HOT WATER BOILERS: 1. General: - see Section. 15100. This Contractor shall furnish three (3) 2470 MSH input natural gas firmed (minimum 84% thermal efficiency) hot water hailers. 2. Bailer Des ign: A. The boiler shall be constructed using a copper fin water tube design. SECTION 15450 - 1 ig W Madison High School Boiler Installation Rexburg, Idaho B. Burners: Gas burner assembly shall be an integral dart of the bailer. Burners shall be tubular alloy steel. Burner shall utilize a hot plate ignition type system with flame safety controls. C* Construction: Each boiler must be supplied fully assembled including burners and mo��xle jacket, individual boilers must be mounted on corrasion -resistant support legs. Boilers shall be assembled in such a fashion as to permit access to piping and controls from the front. D. Boiler Controlse Each boiler shall be equipped with a combination gas valve with m�r�ual shut-off , pressure r'egula,toz'r, and 100°s automatic shut-off. Gas train shall conform to ASME code CSD -1 and insurance carrier. EO Bailer Pressure Valve: Each boiler must be equipped with a pressure relief valve (ASME) . Valve shall be piped to floor iof bailer drip pan, F • Drain Cock: Manufacturer shall provide a drain cock for system water as standard equipment. G. Pressure Rating: Boilers shall be constructed for 50 PSS maximums working pressure and shah be foundry tested. in accordance with ASME Code, H• Approvals : AoGvA., and ASME approvals must be clearly marked on each boiler. Y. The system shall be equipped with pressure gauges F temperature gauges, water level sight glass and direst afire kit. J. System Low Weer Cut -of f; The manufacturer shall supply a low water cut-off. 3. Manufacturers a. Lochinvar CHI32070. Plans and specifications have been designed utilizing Loch invar copper fin series boiler,. Any mvdificativns, to piping, flues or other boiler -related service, due to a change in boiler dimens0 ions configurations, or arrangement, shall be made at no additional cost to the Owner and completely provided by this Contractor, The engineer reserves the right to approve any such modification. SECTION 15450 - 2 Madi'sonH'gh School Boiler Installation Rexburg� Idaho TT, ExeCUtion: a . Install and connect into an operable system three {3 new hod water boilers per mechar��.ca� drawings and manufacturerfs directions. • Pipe pressure relief valves to floor inside of new bailer drip pans. Install flues per applicable codes. ,START-UP AND TUNE - Upon- Upon completion of boiler installation, the boiler manufacturer shall provide astart-uta technician. This technician shall provide the fallowing servicers, at a minimum: 1. Perform safety checks and initial start-up of boiler. 2. Train operators as to prayer procedures,, troubleshooting maintenance procedures, start-up and shut down methods, and normal Upon completion of boiler Mart up and safety checker the Contractor shall provide the following services: 1. Boil --out of bailer and new piping prior to platingin sex -vice as per ASME code Section 6 chapter 7 and manufactures recommendations. Including but not limited to the following: a. Fill system to operation level and vperat� at specified condition for at least two -(2) days. b. Provide a bojLl out compound of caustic soda and trisodium phosphate, ce operate at- ''specif ied temperature for at least five (5) hours. d. Wash and flush system thoroughly using water. e• If the above procedure provides unsatisfaetvey results repeat steps b, through d.. DOMESTIC HOT WATER BOILER.W General.0 This Contractor shall furnish ane (1) 54G MBH input natural SECTION 15450 -- 3 Madison High School Boiler Installation Rexburg , Idaho gas fired minimum 85% thermal efficiency) hit water boiler. 2. Boiler Design: A. The boiler shall be constructed using a copper fin water tube design. B. Burners: Gas burner assembly shall be an inte,gralpart of the boiler. Burners shall be tubular allay steel. Burner shall utilize a hat plate ignition type system with flame safety controls. c. Construction: Boiler must be supplied fully assembled, including burners and module jacket. Bailer must be mounted an corrosion -resistant support legs, Boiler shall be assembled � such a fashi ion as to permit access to piping and controls from the front. D. Boiler Controls ; Boiler shall be equipped with a combination gas valve with manual shut-off, pressure. regulator, air pressure switch, and 1D0% automatic shut- off. Gas t rain shall conform to ASME code CSD -1 and insurance carrier requirements. E• Boiler Pressure Valve: boiler must be equipped with a pressure relief valve (ASME). Valve shall be piped to floor inside holler drip Baan. Fe _ Drain cock; Manufacturer shall provide a drain cocfor system water as standard equipment G. pressure Rating: Boiler shall 'be constructed fvr 50 PSI maximum working pressure and shall be foundry tested in accordance with ASME code. H• Approvals : AaGaAe, and ASME approvals must be clearly marked on boiler. I. The system shall be equipped with temperature gauges manufactures high velocity pump, and dorect aixe kzt, ja System Low Water Cut'Off : The manufacturer shall supply a low water cut-off. 3. Manufacturer: a- Lochinvar CFN650PM. Flans and specifications have been designed utilizing Raypack H series boiler, Any Mod if mations to piping, f lue, or other boiler� related service, due to a change in boder dimensions, SECTIQN 15450 — 4 Madison High School Boiler Installation Rexburg , Idaho configurations, or to the Owner and Engineer reserves 4. Execution: arrari+gement, shall be completely provided the right to approve a. Install and connect into an domestic hat water boiler manufacturer's directions. b• Pipe pressure relief valve pans . made at by this any such no additional cost Contractor. The mvdif ications . operably system one (1) new per mechanical draw ings and to f loor BC3ILER START-UP AND TUNE-UP ; Upon completion of boiler installation, shall provide a Mart -up technician. This the following services, -at a minimum: inside boiler drip the boiler manufacturer technician shall provide 1.0 Perform safety checks and initial Mart -up of boiler. 2. Train operators as to proper procedures . troubleshooting maintenance pr-ocedures . MI SCELLANEOUS Furnish and install all necessary other items rewired to carry control sequences. All wiring National electrical Code, END OF SECTION 15450 start --up method , and shut _ dawn and normal relays , switches, enclosures, oUt the power requirements to be in conduit and conform SECTION 15450 - and and to 5 Madison High School Boiler installation Rexburg, Idaho DIV. 15 - SECTION 1.5700 INSULATION GENERAL 10 Requirements: The requirements listed under General Conditions, Special. Conditions and General Requirements are applicable to this. section and forma pari of the contract, 2.6 Work to be Performed@* Perform all work awarded to the crafts of thIs Contractor by reason of labor agreements and j urise�ictivns at no additional cost to the Owner, SCOFF This section covers the lobar, materials and equipment necessary to complete tasks including, but not limited to: 1. Providing of insulation, jacketing, and fittings for X11 new supply and return hydronic water piping. EXAMINA'`I'I4N OF SITE: 3. Examine word is will be the site and be informed of all conditions under which to be done before submitting proposal. No allowance made for extra expenses on account of error. 2. Information shown available records shall be regarded relative to existing services is based upon and data during preparation of drawings and as approximate only, Make deviations found necessary to conform with actual locations and conditions without extra cost. FiELD MEASURIXENTS: The Contractor shall verify the dimensions and conditions governing his work at the building. Na extra compensation shall be claimed or allowed on account of differences between actual dimensions and those indicated on the drawings. He shall examines adjoining work, on which his word is dependent for perfect efficiency and shall report any work which must be corrected. No waiver of responsibility for defective word shall be claimed or allowed due to failure to report unfavorably conditions affecting his work. COOPERATION WITH OTHER TRADES: 1. The Contractor shall give full cooperation to other trades and shall furnish in writing to the General Contractor, with SECTION 15700 - 1 Madison High School Boiler Installation Rexburg, Idaho copies to the Architect /Engineers any information necessary to permit the work of all trades to be installed satisfactor ily and with the least passible interference or delay, MATERIALS Pipes Insulation: Insulate Thickness service, Fittings: All p40 ipe f itting possible. finished piping with Manville Micrvlvk with of insulation shall be determined by as shown in table l of Section 0170t} . PVC Jacketing. pipe size and fittings shall be ins ulated with factory molded PVC covers and f actory pre-cut insulationiLns erts, where For noon -standard P IV dF $ ipe 3oints, use trimmed fiberglass, with �a ski m n n a � r, � ,F ; ,., ; .,., ti - --- - - - 5urra�ce. Wrap vapor -sealing INSTALLATION: -- --- -.. -�-��� �-L �-X11-�������y cement to farm a smooth the joint with 211 fiberglass mesh tapes and apply a fitting mastic. Pipe Insulation: Apply insulation over glean, dry pipe with together. Seal butt i n; r,f c! A]-. : I nsulation, successful per Sect ion Fittings: CA K�l Z> V t -,-a Note: Insulation shall no 0 all joints firmly butted strips supplied with the be aonl i ar3 hafr„-e -J11P--uu--on o= nyarostatic tests. 150001when.insuiatian system is Apply per manufacturers adhesive backed tape to pipe insulatian, Apply pipe markers, complete. instructians, Use a 2" plastic coated, seal the point between the eaves and the SECTION 15700 - 2 H f U) } .H J: I- - rA rd ::) N 14 E-1 �o o 4-) F 0 tn VI r -I r --i rlA x En m +J Z O H H z H co Ul 44 *moi Ia IN rZ Wir m f U) } P4 J: I- - rA m f U) �s P4 J: I- - rA rd ::) N 0 LO u 0 CD D N '- r -i r -i mom Omm LO N CN H H r -A o 9 0 a 16 i H 40 ■ •- 6 0 a ! I I I f U) �s P4 a4 rd 14 E-1 0 LO u 0 CD D N '- r -i r -i mom Omm LO N CN H H r -A o 9 0 a 16 i H 40 ■ •- 6 0 a ! I I I OFMW pri 4J tp a 44 # �-• rd a) 0 x a) ul OF rA 0 Q) 0 m 0 4 f U) �s P4 a rd sD4 Ln �o o 4-) 0 En m +J a) -P -P CO rd c� a0� ldb x�a } -P-1 , ;J ` ' #-i� J U j +�bql • a i^F 1 ;j Pr ir-i -r-I I r --1'#H -rq • 0' co OFMW pri 4J tp a 44 # �-• rd a) 0 x a) ul OF rA 0 Q) 0 m 0 4 z 0 H P m 0 LO H 0 -ri U) �s P4 a sD4 Ln �o o 4-) 0 En m +J c� a0� ldb x�a z 0 H P m 0 LO H 0 Madison High School Boiler Installation Rexburg, Idaho DIV. 15 - SECTION 15715 WATER BALANCE GENERAL REQUIREMENTS Conform with applicable provisions of Division 1 , Conditions. and Supplementary General Conditionsa SCOPE 4F WQRI{. General Perform water balancing of heating equipment and d'stribut*on systems. RELATED WORK: Section 15450 Boilers, 15140 Piping Specialties Equipment. QUALIFICATION: �` Balancing Contractor shall be a firm with at least 2 years of successful experience , on requirements similar to thoserreects uired fob t����ng and balancing Of systems will not be acceptable as Balancing �contractor,sect. Installer RELATED RE UIREMENTS: Supplementary Conditions 0 Installing Contractor until and balancing. UALITY ASSURANCE : The organization which member in good standing of either: Retainage shall final completion of be withheld from testing, adjusting performs the service shall be a certified tv perform the services 1 . Associated Air Balance 2. National Environmental Within 3 d days representative services. Council (AABC) Balancing Bureau (NEBB) current required after award of contract, transmit to the er• the name of the organization proposed to perform the Comply with applicable procedures and. standards of the certification sponsoring associa�ivn, either: "National Standards far Field Measurements and Instrumentation, Total Systems Balance, Air Distribution - SECTION' 15715 - 1 Madison High School Boiler Installation Rexburg, Idaho Hydroponics Systems", dated 1974 by AABC, "Procedural Standards dor Testing, Adjusting, Environmental Systems", dated January, 1g'771 Perform services tender designated and qualified sponsoring association, Calibration and requirements of each instrument and Balancing of by EBB a direction of a supervisor who under certification. requirements maintenance c the standards, and available is f f instruments I in accord with and calibration histories f or for examination. Accuracy of measurements shall compl standards. y with requirements of the SUBMITTALS: A, At least fifteen days inspection, submit applicable reporting JOB CONDITIONS• prior to Contractor's request for f 0, o jnal three copnal reports on forms, for review. Prior to the start of testing, adjusting and balancing, verify that required "Job Conditions?'are met: i, Systems installation is complete and in full. operation. 2. outside conditions are within a reasonable range relative to design conditions. 1P 3- Examine the air hand!*ng supply and exhaust systems to sem that they are frees from obstruction. Determine that dampers and registers are open; that moving equipment is lubricated; that filters are futncioning; and perform other inspection and maintenance activities necessary for proper c�peration of the systems. Verify that requirements for preparation for testing and havebalanc-ing been met for elements of each of the systems which requites�.ing . r EXECUTION• PROCEDURES - GENERAL: Comply fully with the' procedural standards of the certifying association under whose standards service will be performed. 1. Execute each' 'step of the prescribed TAB procedures without SECTION 15715 - 2 04N D io Madison High School Boiler Installation Rexburg r Idaho -miss ion . 2• Accurately record the required data. WATER BALANCING: _ Make measurements in accord with recognized procedures and makepracticesof practices of the certifying associations. Measures wader volume at each unit and adjust flaw to design quantities within ten percent over or under. Adjust pump flow for required water vvlurne. Measure and adjust water flow through boilers to temperaturedeliver design conditions . Adjust flew control valves , pressure regulating valve, compion tanks charging valve and aim separator for design cond�tir�ssans. Measure coil pressure drops � and total pressure across the hydropic system. Evaluate building and. room pressures cond.i.tiQns to determine adequate supply and return water quantities. Evaluate space and zone adequate conditions to determiadequate performancene wiwithout draft of the systems to maintain temperatures . Nark flaw control valve final position. COORDINATION. Coordinate services with the work of the carious trades to ensure rapid completion of the services. Promptly report to the noted during performance action . END OF SECTION 15715 C}wnerfs representative any deficienc�.es of services to allow immediate corrective SECTION 15715 - 3 Madison High School Boiler Installation Rexburg, Idaho DIV. GENERAL 16 - SECTION 16000 ELECTRICAL 1- Re uirements: The requirements listed under General Conditions, Special Conditions and General Req uirements are applicable to this section and all subsequent sections of Division 15 and form a part of this Contract. 2 • Work to bePerforme of this Contractor jurisdictions at no SCOPE Perform all work awarded to the crafts by reason of labor agreements and additional cast to the owner. This section covers the Labor, Materials and Equipment necessary to complete tasks including but not limited to: 1. Supply, install, :and connect power circuits t0 the new circulating pumps. 2. Provide and install conduit for new bailer controls; coordinate with Section 15400 and 15900. FEES PERMITS AND REGULATIgNS 1 • The Contractor shall obtain and pay for any and aller required in the installation of this work, p mets 2. Where speciti�ations and drawings require higher standards than applicably ordinances or statutes, speca.f*cat loons and drawings shall take priorit�r. 'here specifications and drawings violate applicable ordinances or statutes, the latter shall take priority. 3. All work and materials shall be in full accordance with the latest applicable Stat, City, County and Local regulations and ordinances. Nothing in these specifications or drawings is to be construed to permit work not conforming tc� these codes. The Contractor shall hold and save the Owner and Engineer free and harmless from liability of any nature arising from his failure to comply with codes and ordinances, 4. Items which are not covered in Local, and State codes shall be installed per the Latest edition of the following codes, Madison High School Boiler Installation Rexburg, Idaho a• National Electrical Code published by National Fire Protection Association. EXAMINATION OF SITE. I'm Examine the site and be informed. of all condition's under which work is to be done before submitting proposal, Na allowance will be made dor extra expenses on account of error. 2 • rnfQrmationi shorn relative to existing services s hosed upon available records and data during preparation of draw ings and shall be regarded as approximate only, Make deviations found necessary to conform with actual locations and conditions extra cost. MELD MFASURMENTS0 The Contractor shall verify the dimensions and conditions his work at the building. No extra compensation gavernin sha1Z be claimed or allowed on account of difference between actual dimensions and those indicated on the drawings. He shad examine adolrizng work, on which his work is dependent for perfect efficiency and shall report any work which must be corrected. No waiver of responsibility for defective work shall be claimed or allowed due to failure to report unfavorable conditions affecting hi s work . DRAWINGS: 1• Installation changes necessary to coordinate with ether work or to meet architectural or structural candi�zons shall be made without additional cost to the Owner. 2. For purposes Of clarity and legibility, drawings are essentially diagrammatic to the extent that many offsets, bonds, special fitt#ngs and exact locations are not indicated , Make use of all data in all Contract Documents and verify information at site. 3. All dimens-ions and locat�.ans of equipment, door, partitions, f ixtures, grille, etc. , are to be taken from the plans but shall be verified at the jab site, Dra saledwings are not to be . 4. Equipment is indicated only in its approximate location. The Contractor shall locate outlets and apparatus symmetrically and shall coordinate such locations with work of other trades to prevent interferences. 50 The Contractor shall submit to the Engineer one sed of as -- built drawings at the close of the project, SECTION 16000 - 2 Madison High School Boiler Installation Rexburg , Idah[] DEMOLITION AND AI,TERIITIONc Contractor shall installation of the adjoining materials do all cutting electrical work, and finish. COOPERATION WITH, OTHER TRADES and patching required for Patch areas shall mach the � . The Contractor shah give full cooperation to other trades and shall furnish. in writing to the General Contractor, with copies to the Architect/Engineer, any information necessary to permit the wvrl� of all trades to be installed satisfactorily and with the least possible interference or delay. 2. Where the work of the Contractor will be installed in close proximity toor will interfere with work of other -grades, he shah assist. in .workingout space conditions to make a satisfactory adjustment. If so Contractor shall prepares sections ata suitable scale showing how his work is to work of other trades, If 1 before coordinating with Qtr interference with work of t necessary change- in his , without extra charge, ----- .�u ul 411 + -L %-.-LL.L UUc: L, the composite working drawings and notless than 1/41f=11011 , clear installed ly be in relation to the the Contractor installs his work ger trades , or so as to causes any other traders, he shall make the work to correct the conditions 3 • The Contractor shall furnish, to other necessary templates, patterns, settin for the proper installation of work adjacent work. DELIVERY AND STORAGE* trades,. as required. all g plans, and shop details and for the purpose of 10 Deliver materials in ample quantities from time to to as necessary for uninterrupted progress of the ��rk. Store so as to cause the least obstruct zan to the premises and distribute to prevent overloading to any portion of the structure. 2. Provide all temporary storage and shop areas that are required at site for safe and groper storage of materiels, tools and other items used in the performance of the wank, Construct only �n approved locations and do not interfere with work of any other trade. 3• Protect materials and equipment furnished under this section, either stormed or .installed, until f�x�al acceptance of the project as a whole. SECTION 16000 - 3 Madison High School boiler Installation Rexburg, Idaho 4. Damage shall or defect be made goad 5. Provide materials unload' ng developing before acceptance of the work at Contractorls expense. all equipment and for this proj ect. materials. TEMPORARY SERVICES: manpower required to. unload owner will not assist in Provide temporary services when interrupted in connectian with worknf i-i"dn any of nerinci aria approved by INSPECTION: 1. Do n�ot allow any work to be i 11 C Y1 in r7 existing services are this section beyond the owner. covered-upor enclosed until L,.,? 1,.0 � Gu, L.t�5 mea ana approved by Architect/ Engineer or other authorities having jurisdiction over the wox, 2. Should any work be enclosed or covered -up before such inspection and test, Contractor shall at his own expense uncover wvrk, and after it has been inspected, tested and approved, make all repairs as necessary to restore all work distributed by him to its original condition. CLEANING The Contractor shall at all times keep the Owner's premises and the adjoining premises, and roadways clan of all rubbish caused by the Contractor's operations and at the completion of the works hall remove all rubbish from and about the premises, and all histools, equipment, temporary work and surplus �,aterlals and shall leave the area clean and easy dor occupancy �y the owners During the progress of the work the contractor shall clean up after his employees and shall leaves the premises and all portions of the building in which he is working frees of debris and in a clean and safe condition. GUARANTEE: All work under this section shall be guaranteed in writing to be free of defective work, materialsor parts f or a period of one(iL) year after f inal acceptance of the worke work rewired to repair or replace defective workmanship materials or equipment shall be done at no cost to the Owner Furnish a letter of guarantee to the General Contractor dor inclusion in the maintenance manual. MATERIALS: General SECTION 16000 - 4 0 0 Madison High School Boiler Installation Rexburg, Idaho All Material required 9 4- f or a complete and operable electrical snail be new, first qual subject to approval ofEn ity of their respective kinds, raceways: .the gineer. - 2• electrical metall�.c tubing (EMT) shall be installed in all areas except those areas required bY �vd� to have ri id conduit. ELMZ` shall be UL approved standard weight electro_ galvanized steel, 1/2 inch minimum size. 2Flexible metal conduit shall be installed where allowed by the National Electrical Code unless shown ot}-�eonthe drawings. Liquid tight flexible conduit shall bw1setall�d �.rk wet locatic�ns . Liquid tight flex shall be grounding type with QVC jacket, Sealtite or approved equal. 3 • Conduit fittings for SMT shall he watertight on outside walls and set screw on inside walls. ap►proved All fittings shall be UL . 49 Small junction boxes (4-11J16 in. sq, and smaller) shall be stamped from. one piece of sheet. steel and shah. be galvanized. Constructi�n,of all boxes shall cQmply with the NEC, article 37D -2Q. l- Minimum wire, size of power conductors shall be No. 12 AWG copper. Control conductors shall be No. 14, AGOG unless shown otherwise on the drawings or specified otherwise herein. Wi size No. 20 AWG and smaller shall be solid, and wipe re size -No. s AWG and larger shall be stranded. InsulationInsulation conductors shall be rated for a miniVOmum ❑f 5pp for conductors shall be thermoplastic Feat resist type THHN for wires size No. 8 AWG and smaller and h+�at and moisture resistant Type THW or XHHW on wire size No. 6 AWG and larer,g insulation types shall be as defined by the NEC, Ar�ticle I Aluminum wire shall not be used an t his project., 2. System ground conductors shall be sized per NEC, Article X50 and as shown on the drawings. Conductors shall be bare. stranded, medium i _soft drawn capper: No . 12 AWG wire, when used for grounding, shall be solid conductor with green insulation. INSTALLATION- GENERAL: Raceways: - 1. Conduit ends shall be mut square and reamed With a tapered reamer to remove all interior burrs and sharp edges, SEC3'ION 16000 - 5 10 Madison High School. Boiler Installation Rexburg, Idaho 2• Exposed conduit shall be installed parallel with or at right ! angles to the building Sines of the structure. � 3. Straight run conduits shall be supported at equal intervals. of not more that 8 ft, Angle bends shall be supported within 3 � ft. on each side of the bend. IV 0 Crushed or damaged conduit shad not be instal'ied. 'threaded conduit shall be swabbed to remove all grit, dirt, or other foreign mater before 1b installed. Dl�. , 111O1St11re J, conductors are 6• Installation of liquid tight flexible metal conduit shall conform to the NEC, Article 351. 7- Doable lockouts and screw an insulating bushing shall be installed on all conduits entering boxes, cabinets. v� fittings where loc'knuts are. required., Ground bushings shall be used where required by NEC and on feeders for equipment grounding. All necessary precautions shall be 'taken to prevent undue twisting or wired conductors and/or breaking of insulatoivn when pulling the wire into conduits. There shall be at leash 8 a.n, of wire remaining at a 31 boxes for the purpose of making connections or splices. All conductors shall be identified with wire makers Ci panel and circuit number, having phase markings where applicable , at terminations and at all junction boxes where splices or taps may be made. Wires markers shall be T&B vinyl, self adhering, oil and moisture resistant types or approved equal. The use of cloth adhesive labels for wire markers is prohibited. Splices shad be made electrically and mechanically secure pressure type connectors. Pressure type connectors shall Wing nut or appro�red equal for wire No,6 AWG and smaller; 4 AWG and larger use a crimp tyke connector, Surndy or equal Wire calor codes shall be afallaws: be Ideal for No. I co d. Black - Phase. A Red - Phase B Blue - phase C Green White or Bare or Gray Ground Neutral a SECTION 16000 - 6 Madison High school Bailer Installation Rexburg , Idaho Conductor color 0 wire or gaped o: green conductors for phase or hot TESTING• codes l +2I1d5 . taped shall he by means of color full length of Whites yr green conductors, or white or or painters another color r conductors on this project, shall not be used �. General: Uponcompletion of installation, furnish all equipment and personnel to conduct all tests required to secure approval from all agencies having jurisdiction. 2. Criteria: a. All systems shall test free from short circuit and ground, and shall be free from mechanical and electrical defects . b. All systems shall show proper neutral connections and wire color cages. CLEAN UP: i• Upon completion of clean all equipTnent, END OF SECTION 16060 all installations larnp�,ng;- and testing, remove aYl truction debris. SECTION 16000 - 7 Madison High School Boiler Installation Rexburg, Idaho DIV. GENERAL: 16 - SECTION 16150 1. SECTION 16000 - GENERAL P�DVISI�NS, ELECTRICAL app Lies t specified �n this section, v work 2• Furnishing and install 'Ing panelboards and wiring required to result in a cvm�lete electrical distributces System that is shown in general by the contract drawings ion 3, mmu. Work Included: A. Furnish and -connect one 1D0 Am1p,distribution panelboard fir 12a/4p, � 1 base breaker =service. Provide for surface installation. � wire B. Furnish and install breakers for new panelboard as required for new equipment connections to new panelboard. 4. Submittals: A- Shfl T7rawin s: identify panels by alphabetical leiter ani. .numeral with branch circuit breaker Sizes and type indicated in panel schedules or one -lines diagram. Be Guarantee . PRODUCTS: 1. Liahting__ani Power A. Acceptable Panels: Manufacturers 1 • Panels Same manufacturer for all panels on 1 project: Westinghouse; GE; Square D 1 Sylvania; Cutler -Hammer Co.; ITE Gould; and Federal Pacific. 2. Design of -distribution system based on Square D equ.ipment. Contractor shah be responsible for changes required to install other manufacturersjF Ob equipment, if dimensions are larger than Square D. B. A11 Panels_ halted --on circuit breaker type. Plug-in circuit breakers not. acceptable. 1 . Provide with non -insulated equipment grounding terminal strip located in top or bottom gutter including main groundingiVlug and indidual SECTION 16150 - 1 Madison High School Sailer Installation Rexburg, Idaho terminals f or including spare accordingly for at least 50a of panel ClrCultS I increase Butt grounding strip. circuits er space 29 Equip bus bars for panelboard with main lutis main circuit breaker, capacity a� requir d or indicated, 3. Provide panelboards with branch circum connection to main bus arranged for sequence phas'ng, drawing panel schedules. per 4• All multi -pole breakers shall be single handle and common trip. 5 • Provide sub-feed lugs for 2 section panels, c, branch Circuit Panels; 120/240 V, 1 phase, 3 wire. D• Panelbvards; Dead -front type equipped with automatic branch circuit breakers for each branch circuit. 1• ..Provide : special features such as sub -feted lues, f.eed-through lugs, ii, htzng contactors , extra -width gutters, grounding bus, etc,, as required by drawings or specification. 2. Design so a combination of one, two and three pale circuit breakers can be readily assembled in same panel. E. Circuit Breakers; Thermal -magnetic type unitconstruction, employing quick-make and quick -break boggle mechanisms far manual operati operation . on as well as automatic 1. Handley with three p�si "TRIPPED" . tivns: "C3FF"• "ON" and 2 • When circuit breaker opens on overload or short circuit, operating handle shall automatically assume "TRIPPED" position and clearly indicate abnorma 1 �ond.�tion of circuit _ 3. Units operable in ariy POsition and removable from front of panelboard without disturbing adjacent units. 4- Tandemor P half-size circuit breakers not allowed. SECTION 16150 - 2 W Madison High School Boiler Installat4 ivn - Rexburg, Idaho F• Two and Three Pole Circuit Breaker Rain s; 1 • 120/240V Branch Circuit Panels : Minim AIC symmetrical, um lo, 000 RMS G . Cabinets@ Trim, door and box of �a�vanized sheet steel, Code gauge. 1. -5-3/4 inch. deep, with gutter space of at least 4 inches on all sides around lighting panelboardst and greater for power panels. 2. Fasten trim to0cab adjustable clamps. net by means of approved 3• Equip do catch or with chrome -plated combination lock and upply two milled keys with each lock; key locks alike. 4 - Provide directory frame on inside of door. 5. F%: Primed, one coat gray lacquer. H. Identify all circuit locations in each respective panel with load and locatlOn served. EXECUTTON .W 1. Installation. A• Install as indicated manufacturer's recammendat END OF SECTION 1610 and in accordance ions and instructions. h SECTION 16150 - 3