Loading...
HomeMy WebLinkAboutBOILER INSTALLATION PACKET 1 - 94-00029 - Madison School District - High School (Jr High) - Boiler Room RemodelMAD/SON SCHOOL DISTRICT #321 j Prepared by McClure Engineering 507 West Main Street Twin Falls, Idaho 83303 I &a Madison High School Bailer Installation Rexburg , Idaho SECTION 01700 - PROJECT CLOSEOUT General Definitions.: The provisions of this 'section apply primarily to closeout of actual physical work, not to administrative matters such as final payment and changeover of It Specific requirements in other sect�, ions have Precedence over general requirements of this erection. Procedures at substantial Completion* Freres a ites: Comply with General Conditions and compl�.te the fallowing before requesting Architect■s,/Engineer,'s inspeetian of the work. or designated portion thereof, for substantial coxnpletivn0: Submit executed warranties, workmanship bondsl maintenance agreements inspect ion certificate, and similar required documentation far specific units of work, enabling Owner's unrestricted occupancy and use , submit record dacumentat�i.on, maintenance manuals, tools, spare parts, keys, and similar operational items, Complete instructions of owner's operati systems. ng personnel, and start-up of Complete final cleaning, and remove temporary fac.111"ties and tools, inspection Procedures: Upon receipt of Contractor ► s request, Architect/ Engineer will wither proceed with inspection. or advise Contractor of prerequisites not fulfilled. Following initial inspection, Architect/ Eng ineer will either prepare Certificate of Substantial Complet-ion, or advise Contractor of work which must be performed prior to issuance of certificate; and repeat inspection when requested and assured that work has been substantially completed. Results of completed inspection will farm initial "Punch List!{ for final acceptance. Procedures at Final Acceptance: Rein�;ectian Procedures:Upon reeeiptaf Contracto�rs notice that work has been completed, including punch list items resulting f rom earlier inspections., and executing incomplete items delayed because of accep table circumstances, Architect/Engineer will reinspect word. Upon completion of reinspection, Architect/Engineer will either recommend final acceptance and final payment, or advise Contractor of work not completed or obligations not fulfilled as required for final acceptance. If necessary, procedure will be repeated. Record Documentation. SECTI9N QI?DO -" 1 4 Madison High School Boiler Installation Rexburg , Idaho Record Drawin s: Maintain a complete set blue blackprints of contract drawings and shop drawings for record during the course of the work to s how charges and actual installation conditions, sufficient to form a complete record for Owner's purposes. Give particular attention to work which will be congealed anddifficult to measure and record at a later dale, and work which may require servicing or replacement duringI�fe of project. Require entities marking prints to sign and date each mark-up. Com ex S stems : �.For this project with complex equipment and systems � provide the following proDect finalization an start-up services. Upon completinnc�f the equipment and systems installation and connections, the Contractor shall assemble all E:qlllpmeiit and factory representatives and subcontractors together for system start-up, These people shall assist in start-Wup and check out their system and remain at the site until the total system operations is acceptable and understood by the Owner's representative. The factory representative and system subcontractor shall also give instructions on operation and maintenance of their equipment to the Owner's maintenance and/or operation personnel. To prove acceptance of operatiQn and instruction by the Owner's representative, the Contractor shall prepare a written statement of acceptance, explaining lamer for h is signature. The statement might read as f 011OWS: "I , the Contractor , associated factory representatives and subcontractors , have started each system and the total system, and have proven their'nor'mal operation to the dwnerrs representative and have instructed him in the operation and maintenance thereof Owner's Representative Signature Date This statement shall be Oerator Instructions: included Con.tractor Signature Date in the o & M Manuals . Require each installer of systems requiring continued operation/maintenance by Owner's operating personnel, to provide on -location instruction to Owner°s personnelf11 # sufficient to ensure safe, secure efficient, non -falling utilization and operation of systems. , SECTIC3N 01700 - 2 Madison High School Boiler Installation Rexburg , Idaho Fina, Cleanin0 At closeout Clasp il maintenance/ cleaning of time, clean or reclean entire work for "first building projects of a similar nature . Remove non -permanent protect ion and labels, dean exposed finishes, touch -uta minor finish damage, clean or replace filters of mechanical systems, remove debris and broom -clean non -occupied ,spaces, sweep and wash paved areas, police yards and grounds, and perform similar cleanup operatian� needed to praduc� a "clean" condition as judged. by Architect/ Engineer. SECTION 01700 - 3 Madison High School Bailer Installation Rexburg , Idaho SECTION 09250 - GYPSUM DRYWALL PART 1 - GENERAL RELATED DOCUMENTS0 Drawings and general provisions of, Contract, including General and Su}aplementar�r Conditions and Divsion 1 Specification Sections , apply to work of this section. SUMMARY: Extent of each type of gypsum drywall construction. required is indicated on Drawings This SectIP ion includes the constriction: Gypsum board attached to DEFINITIQNS: following types woad framing and Gvpsum Beard Construction Terminolo 575 for definitions otherwise defined in UALITY ASSURANCE: of terms for this section Of gypsum board furring members. 0 Ref er to ASTM C 11 and GA gypsum board construction not or other referenced standards. Fire -Resistance Ratingsy .Where indicated, provide materials and constructions which are identical to those of assemblies whose fire resistance rating his been determined per ASTM E 119 by a testing and inspecting organization acceptable to authorhaving 1 les Uri sd icti on 4 provide fire--resistance-rated assemblies, identical to those indicated by reference to GA File Nos. in GA -6Q4 'IF re Resistance Design Manua" or to design designations in U.L. "Fire Resistance Directory" or in listing of other testing and agencies acceptable to authorities having jur.�sdictivn. 5.ingle-Source des leach related joint treatment materials from a DELIVERY STORAGE, AND HANDLING: type of gypsum board and. single manufacturer. Deliver materials in original packages, containers or bundles bearing brand name and identification of manufacturer or supplier. More materials inside under cover and deep them dry and protected against damage from weather, direct sunlight, surface contamination, corrasion, construction traffic and other causes. Nealy stack gypsum boards flab to prevent sagging. Handle qvnsum boards to prevent damage to edges, ends and surfaces. GYPSUM DRYWALL SECTION 09250 - 1 Madison High School Boiler Installation Rexburg, Idaho Do not bend or otherwise PROJECT CflNDITIONS damage metal corner beads and trim. Environmental Conditions General: Establish and maintain environmental conditions for application and finishing gypsum board to comply with ASTM C Sia and with gypsum board manufacturer's recommendations. Minimum Room Temperatures: For nonadhesive attachment of gypsum board to framing, maintain not less than 40°F (4°C) , For adhesive attachment and finishing of gypsum board maintain not less than SOOF (100C) for 48 hours prior to application and continuously thereafter until drying iS complete, Ventilate building spaces to remove water not required for drying joint treatment materials. Avoid drifts during dry, hot weather to prevent materials from drying too. rapidIy. PART 2 - PRODUCTS MANUFACTURERS Available Manufactures: Subject to compliance with requirements, manufacturers offering products which may be incorporated i n the Work include, but are not limited to, the follow*i-ng: Gypsum Boards and Related Products: Georgia-Pacific Corp. Gold Band wilding Products United States Gypsum Co. GYPS4 BOARD: UI Div., National Gypsum Co. General: Provide gypsum board of hypes indicated in maximum lengths available to minimize end-to-end joints, Thickness: Provide gypsum board in thicknesses indicated, or if not otherwise indicated, 5/8 inch thickness to comply with ASTM C 840 for application system and support spacing indicated. Gypsum Wallboard.0 ASTM. C 36, and as, follows: I - Typed Types X for fire -resistance rated assemblies, Ed es: Manufacturer's standard. Thickness: TRIM ACCESSORTE.S Cornerbead and Ed 5/8. Lm TrA for Inte for T t 1 1 t n 11 1.M— ao -...r 3 J& -W Provide corner GYPSUM DRYWALL SECTIQN 09250 - 2 Madison High School Boiler Installation Rexburg , Idaho beads � edge tr�m and control � Dints which comply with ASTM C 1047 and requirements indicated below: Material: Formed metal, cvmp�.ying with the follo��.nq requirement: Sheet steel zinc -coated by hot --dip process. Edge trim shapes indicated below by reference to designations of Fig. 1 in ASTM C 1047: "LC" Bead, unless otherwise indicated. Eck e trim complying with ASTM C 1047, formed from rolled zinc, supe "LC" Bead per Fig, 1, unless otherwise indicated,. GYPSUM BOARD JOLT TREATMENT MATERIALS16 General_:_ Provide materials complying with ASTM C 475, ASTM C 840F and recommendations of manufacturer of bath gypsum board and joint treatment materials f or the application indicated. Joint Tawin:;.0 Paper reinforcing tape, unless otherwise indicated. Setting--Ty_pe �7oint. Compounds Factvry-prepackaged, j vb--mixed, chemical-hardening powder products formulated for Z.d.5e5 indicated, For pref illincj0 gypsum board oints, use formulation recommended by gypsum board manufacturer for this purpose. Dryincx-Type products com and intended rM n_ F_ aI Joint Com vunds : Factory --prepackaged vinyl --based plying with the following requirements for formulation use.. Factory-prernixed product. All-purpose compound formulated for use as both taping and topping campaund. MISCELLANEOUS MATERIALS General: Provide auxiliary materials far gypsum drywall construction which comply with referenced standards and the recommendations of the manufacturer of the gypsum board. Gypsum. Board Screws: ASTM C 1002, Type W PART 3 - EXECUTION EXAMINATION: Examine substrates to which drywall construction attaches or abuts preset hollow metal frames, cash--in-anchors, and structural framing, with Tnstaller presentI for compliance with requirements SUMGYPDRYWALL SECTION 09250 - 3 Madison High School Bailer Installation Rexburg , Idaho far installation tolerances and other performance of drywall construction. installation until satisfactory conditions conditions affecting Do not proceed with have been corrected. Gypsum Board Attachment Schedule. Gypsum board shall be attached as per the following schedule: Location Single layer application to walls Single layer application to ceiling Double layer to bottoms of and ceilings application roof trusses ADDlication /Attachment Apply boards parallel or perpendicular to framing,, Stagger joints 2411 min. each side of wall. Attach with 1 1/211 tW drywall screws at "l" c.c. to all supports. Apply boards perpendicular to framing. Stagger end joints one half panel length in adjacent rows. Attach with 1 1/211 type W drywall screws at 5" o.ce to all supports. Appy base layer perpendicular to framing memers. Attach with 1- 1/4" type S drywall screws at 24" a.c. to all supports. Apply face layer perpendicular to framing members. Offset prints 24' from base layer joints. Attach with 1 7/811 type s drywall screws at 9 '1 o. c. to all supports, - and 1- 1/211 1I2" type G drywall screws placid 211 back on either side of face layer and joints at 1211 o.c. Note: Screw spacings specified in fake precedence over screw spacirtgs Gypsum Association assemblies. APPLICATIaN AND FINISHING OF GYPSUM EiDARD, GENERAL: Gypsum Board A ligation and Finishin Standard: f inish gypsum board to comply with ASTM C 8 GYPSUM DRYWALL this schedule of ref ereneed Install and SECTIDN 09250 -- 4 madiSon High School- 11jailer Installaton Rexburg , Idaho Locate exposed end -butt Joints. as ceilings alternate as possible, and courses of boards Install-ceilin stagger boards across the number of end --butt joints 3MM inches. Instal wa111AartaLtion of end -batt j,oints- or far from center of walls and not leis than 24 inches in framing in the manner which minimizes and which avoids end joints in the niiAiiiiAu ■rel ���vi�n it 1nort 1�l 0 boards in manner which minimizes the number avoids them entirely where possible. At stairwells and similar high galls, install board horizontally with end jaunts staggered over studs. install exposed sum imperfect, damaged or light contact at edges space between boards.. board with face side out. damp boards. Butt boards and ends with not more than Do. not force intim place. Do not install together f or a 1J 16 inch open Locate either edge or end 'pints over supports except inn horizontal applications or where intermediate supports or gypsum board back --blocking is provided behind endjoi'nts. Position beards so that line edges abut, tapered edges against tapered edges and mill -cut or field -cut ends against mill --cut or field -cut tends. Do not place tapered edges against mut edges or ends. Stagger vertical joints over different studs on oppositesides of part itions . Attach,qypsum board to supplementary flaming and blocking. provided for additional support at openings and cutout. Spot grout hollow metal doter frames for solid care wood doors, hollow metal doors and doors over 32 inches wide. Apply spot grout at each jamb anchor clip just before inserting board into frame* Form control 3oints and expansian joints at locations indicated, with spaces between edges of boards., prepared to receive trim accessories. Tsolateperimeter, of structural abutments, with "U" bead edges tri -m,, non -lead -bearing drywall partitions at Provide 1J4" to 1/211 spaces and trite edge Seal joints with acoustical sealant. METTIOnO OF GYPSUM nOARD APP�TCATTON- single-Layer Application:_ Install gypsum wallboard as follows. an ceilings apply gypsum board prior to wall /partition board application to the greatest extent possible. an partitions 1walls apply gypsum board vertica framing}, unless otherwise indicated, and lengths which will minimi c end join-ts. 11y (parallel to provide sheet GYPSUM DRYWALL SECTION 09250 5 Madison high School Boiler Installation Rexburg , Idaho Double -Layer A ligation: Install qvpsum backing board dor base layer andgypsum wallboard for face layerd on ceilings apply base lager prior to application of base Layer on walls/partitions; apply face layers in same sequence. Offset )oints between layers at least � 4 inches . Apply base layers at right angles to supports unless otherwise indicated. Sincfle-La f 0 1 lows: Fastening Methods : Apply gypsum boards to supports as Fasten with screws., Fasten in accord with File No. WP 3510 substituting Type W screws with Gvnsum Board Attachment Specification Section. Gyspum Association with nails, and in Schedule It this Double -Layer Fasten in Methods : Apply lase lager of gypsum board and face layer to base layer as follows: Fasten both base layers and face layers to supports with screws and fasten face layer to base layer with screws. Fasten in accordance with Gypsum Association File No. GAS 5406, substituting Type W screws for nails, and in accordance with Gypsum Board Attachment Schedule in this Specifications Section. INSTALLATION OF DRYWALL TRIM ACCESSORIES: General: Where feasible, use the same fasteners to anchor trim. accessory flanges as required to fasten gypsum board to the supports. otherwise, fasten f ranges to comply with manufacturer' s recommendations. Install corner beads Install metal edge otherwise flange to at external corners. trim whenever edge be ---exposed or semi ---exposed. receive joint compound* of gypsum board would Provide type with face Install "LC" bead where drywall construction abutted to other construction and back flange can to framing or supporting substrate. Install control joinizo, at loczation� or if at spacings and locations required by referenced application and_fix�ish standard, and approved by the visual effect. FINISHING OF DRYWALL: is tightly be attached not ,indicated gypsum hoard Architect for General: Apply point treatment at gypsum board joints {both directions) flanges of corner bead, edge trim and control joints; penetrations; fastener heads, surface defects and elsewhere as required to prepare work for decoration. GYPSUM DRYWALL SECTION 09250 - 6 Madison High School Boiler Installation Rexburg, Idaho Pref ill open 'Dints and rounded or beveled edged if any. using setting -type joint -compound. Apply joint take at j amts between gypsum boards, except where trim accessories are indicated'. Finish interior compounds rounded or coat; SUE wallboard by in 3 coats knot including beveled edges), and sand Embedding and First --- Coat: or taping compound. applying the fallowing joint prefill of open joints and between cots and after last Ready -mix drying -type all-purpose Fill (Second) Capt : Reader --mix topping compound. Finish (Third_) Coat topping cornpaund. drying -type all-purpose Ready-mjLx0 drying --types all-purpose or Partial Finishin Omit third coat and sanding on concealed drywall work which is indicated for drywall finishing or whish requires finishing to achieve fare-resistance rating, sound rating or to apt as air or smoke barrier, PROTECTION• Provide final otection and maintain conditions, suitable to installer, which ensures gypsum drywall being without damage or deterioration at time of Completion. END OF SECTION 09250 in a manner construction Substantial GYPSUM DRYWALL SECTION 09250- - 7 Madison High School Boiler Installation Rexburg, Idaho 1.01 1.02 SECTION 13300 FIRESTOPPING RELATED DOCUMENTS A. drawings including apply to and general General and provisions of contract, Supplementary Conditions, work of this section. DESCRIPTION OF WORK A. P-roviLde firestvpping as indicated, and for the following applications: 1. Penetrations through f ire -rated f loves, ceiling, and walls. Seal holey accvmmodatincr items such as pipes, saying material for ceiling. J conduit, etc. Fire wall cavities above 1. 03 QUALITY ASSURANCE A. General: Provide f irestopp ing materials that expand to fila cavities or provide adhesion to substrates, and that will maintain seal under normal, expected movements of substrates. Provide firms safing, batt or blanket insulation that is firms resistant as well as a smoke slap system, B. UL Classification: Provide f irestopping materials that are currently classified with UL as "Fill, Void , or Cavity Materials", and "Through Penetration Firestop Systems". C. Fire '�ests; Provide firestopping materials that have been tested in accordance with ASTM E 814 "Methods for Fire Tests of Through -Penetration Fire Stops" ;and UL 1479 "Fire Test of Through- Penetration Firestops". 1.04 DELIVERY, STORAGE, AND HANDLING A. Deliver firestopping materials to job site in original, new, and unopened packages and containers bearing manufacturer's name and a label identifying contents.. - Be Sore firestopping materials out of weather, at temperatures below 900F (320 C) and as recommended by manufacturer. FIR.ESTOPPSNG SECTION 13300 - 1 Madison High School Boiler Installation Rexburg , Idaho 1.05 PROJECT CONDITIONS A. Foam: Store unmixed liquid components in their original� unopened containers at temperature of 650 t-0 8 0° F. - (180 to 270 C, } f or 12 hours minirnum bef are use. B a Use forced air ventilation when installing foam in areas having less than two cubic feet of free air for each pound of liquid mixture being foamed. C. Store fire safing blankets in ariginal, unopened packages. PART 2 PRODUCTS 2 , 01 MANUFACTURER A. provide the following f irestopping materials or Engineer. approved equal: 1. Foams 3M fire protection products or equal by Dow Corning. 2 . Sealant : 3M fire protection products or equal by Dow Corning. 3, Fire Safing insulation: Thermaf iber 0 2.02 MATERIALS A. Sealant: Provide ready -to -use fire protection penetration seal that will stop passage of firer smoke, and water through firs-rated wall and f loor penetrations and will cure in the presence of atmospheric moisture to produce durable and flexible sear and will farm airtight and watertight bonds with most common building materials in any combination, including cement, _ masonry, steel and aluminum. B. composition.0 Provide one part, ready -to --use material with consistency of soft caulk at temperatures ranging from -350 to 160"F (-370 to 710 C) , and extension and compression properties of + or -40 o of original gap. C. Primer: Provide Dow Corning 1200 RTV prime coat, ifrequired.. D . masking Tapp:: Provide pressure-sensitive adhesive tape as selected by installer. FIRESTOPPING SECTION 13300 -- 2 Madison High School Boiler Installatian Rexburg, Idaha E, Foam: Provide 14 to 18 lbsp /cu,ft. 'free foam" density, two-part silicones elastomer� supplied in liquid A and C components colored Flack and off while, respectively, for each identificationh. F. Mixing: Provide A and B components that, when thoroughly mixed at rvvrn temperature in 1:1 ratio by either weight or volumes, will expand and care to a foamed elastomer in one to five minutes. G. Dams: Provide alumina silicate fire -board, mineral f iberboard mineral f iber matting, mineral f fiber putty, dict tape, gypsum wallboard type X, plywood or particle }ward, as selected by installer. PART 3 EXECUTION 3.01 INSTALLATION OF SEALANT A. Applications,. Use sealant for simple fire rated wall and floor penetrations, including conduit or pipe through sleeves and firms rated expansion joints. B. Preparation: Inspect surfaces to be sealed to establish that they are clan, dry, sound, and frost--free. 1. Metal and Glass Surfaces. Clean w�.th cloth saturated with non -alcohol solvent in accordance with label i"nstructi, ons, 2. Priming: Test sealant adhesion to each substrate material. Apply primer to any surf ace showing poor adhesion. 3. Exposed Seals : Use masking tape to cover finished substrate adjacent to sealant. 4. Support. a. Where required, support sealant with any common damning material, such as cardboard., duct tapes, plastic foam, or backer rod -- b.- Where required, support sealant with 3- inch thickness of mineral wool, inserted and compressed into opening. C. Installation: but sealant nozzle to desire size and punctum inner fail seal. FIRESTOPPING SECTION 13300 - 3 Madison High School Bailer Installation Rexburg, Idaho 1. 2 -Hour Rated Seal: Apply sealant bead to depth of 1--1/Z" by pushing bead in front of nozzle to fill void above support or, if mineral wool support is used, to a depth of 1 / 2 11 thick* 2* Tool sealant immediately after application and before skin forms., Immediately remove any masking tape used. Protect seal from any disturbance for 48 hours minimum. 3 . 02 'INSTALLATION OF FOAM A . Applications : Use foam for complex fire -rated wall and floor penetrations, including multiple cables in trays, multiple conduit and pipes, and mixtures of cables,, conduits, and pipes, Bo Preparation: Remove combustible materials and 0 loose impediments from penetration openings and adjacent surfaces. i. Remove o i I and other free 1from penetration openings. C. Installation: Provide damming of penetration 0 inopen-ing accordance with manufacturerfs instructons 0 1.0 Sealing: Seal gaps and cracks left after damming materials are in place,_ 29 Mixing: Stir Parts A and B in their original containers. Combine with 1:1 ratio of Parts A and B. Stir resulting mixture thoroughly, either by hand or with power mixer. 3 Foam Placement: Immediately after mixing, pour or inject liquid foam into penetration opening, not more than 1/3 full to compensate for expansion during cure Follow • manufacturer's instructions explicitly. a. When dispensing continuously, do not exceed measure snap time or 3 minutes, whichever is less,, be If opening is not filled when shot reaches measured snap time or 3 -minute maximum, stop application for at least 15 minutes to allow foam to set. a 4* Dam . Leave dam in place for 24 hours minimum FIRESTOPPING SECTION 133 00 - 4 Madison High School Boiler Installativn Rexburg , Idaho to allow foam to filly cure. 3.03 iNSTALLATION OF FIRE SAFZNG A . Field cut blankets to fit wall cavities. B. Secure blankets to framing with specially designed safing impaling clips. C. Field cut insulation a minimum of 1/2v, wider than cavity to be filled to insure compression fit . 3.04 FIELD QUALITY CONTROL A. Sealant: adhesion, Inspect seal and seal and after 48 hours for complete correct any deficiencies. B, FoamFollow manufacturer's installation instruct ions precisely, including 4-point field quality control checks which consist of foam colvr, foam cell structure, snap time, and frame foam density. 1. Inspect seal after 24 hours. Remove clamming materials to inspect under site. 2. Correct any deficiencies by adding f oam or sealant. Reinspect after 24 hours. 3. Reinstall damming materials which are required to achieve fire rating. 3.05 ADJUSTINGAND CLEANING A. Sealant: Clean excess cured sealant from nonporous surfaces with commercial solvent such as naphtha m-ineral salvents, fallowing instructions an container label. Be Foam: Clean spills of Pert A and Part B liquid components with high -clash mineral spirit solvent, fallowing instructions on container label. Trim excess foam with sharp knife or blade. C. gleaning: Remove equipment, materials and debris. Leave area in undamaged, cleari condition. END OF SECTION 13300 FIRESTQPPING SECTION 13300 - 5 Madison High School Bailer Instal3ation Rexburg, Idaho DIV. 15 - SECTION 15000 GENERAL MECHANICAL REQUIREMENTS ENOL 1. Requirements: The requirements listed under General Conditions, Special Conditions and General Requirements are applicable to this section and all subsequent sections of Division 15 and form a part of the contrast. 2* Word to be Performe-d: Perform all work awarded to the crafts of this Contractor by reason of labor agreements and jurisdictions at no additional cost to the Owner. 6 MechanicalDi.vision Tndex 15000 15100 15400 15450 15700 15715 15900 General Mechanical Requirements Basic Materials and Methods 51 Heating Equipment Law Pressure Steam Bailers Insulation Water balance Automatic Temperature FEES., PERMITS AND REGULATIONS: {Hot Water hailers} .1 Controls 3. The Contractor shall obtain and the installation of this word, Supplemental General conditions. pay for permits required in as defined by 3. 7 of the 2, Where specifications and drawings require higher standards than applicably ordinances or statutes, specifications and drawings shall take priority. Where specifications ani drawings violate applicable ordinances or statutes the latter shall take priority, 3. All work and materials shall be in full accordance with the latest applicable State, City, County and local regulations and ordinances. Nothing in these specifications or drawings is to be construed to permit work not conforming to these codes. The Contractor 'shall hold and save the owner and Engineer free and harmless from liability of any natures or kind arising frim his failure to complywith cedes and ordinances. 4. Items which are not covered in Local and State cods shall be installed per -the latest edition of the following codes. SECTION 15000 - 1 Madison High School Boiler Installation Rexburg, Idaho a. uniform Mechanical Cady, published by the International Association of Plumbing and Mechanical officials, latest edition. Ia. Uniform Plumbing Code, published by the International Association of Plumbing and Mechanical ffici Officials,als, latest edition. CO Sheet Metal and. Air -Conditioning contractors National Association, Inc,, SMACNA, d. National Electrical code published by National Fire Protection Association, latest editian. EXAMINATION OF SITE: 1. Examine the site and be informed of all cond'it ions under which work is to be done before submitting proposal. No allowance will be made for extra expenses on account of error. 2. Information shown relative to existing services is based upon available records and data during preparation of drawings and shah be regarded as approximate only. Make deviations found necessary to conform with actual locations and conditions without extra cost. FIELD E, ASUREMEI TS The Contractor shall verify the dim�nsians and conditions ga�verning his work at the building. No extra compensation shall be claimed or allowed on account of difference between actual dimensions and 0 kv those indicated an the drawings, He shall examine adjoining work, on which his work is dependent for perfect efficiency and shall report any work which must be corrected. No waiver of responsibility for defective work shall be claimed or allowed due to failure to report unfavorable conditions affecting his work. ALTITUDE RATINGS: Unless otherwise nested, all an altitude of 4,850 feet manufacturer's ratings must specif ied equipment above sea level, be made aecardincrll SUBI S TON OF MA'T'ERIAL LIST AND SHOP DRAWINGS capacities are fay adjustments to the a& 0 1. Prior to the installation of any materiels and equipment and within fifteen (l5) days of Contract awards the Contractor shall submit to the Architect/Engineer for approval, five (5) copies of the manufacturer's brochure containing complete dimensional and performance characteristics, wir0 ing diagrams, I nstallation and operation instructions, etc., for the SECTION 15000 - 2 Madison High School Boiler Installation Rexburg, Idaho f ollowing equipment: a. Controls and Sequences b . Wiring Diagrams c. Insulation d. Domestic Hot Water Boiler e. Piping Specialties fo Pumps g -e Hot Water Boilers h. All items substituted under the "nor equal" clause 2. A material list shall be submitted stating whether the materials proposed are as specified or are substitutions. Contractor shall review and mark submittals prior to submitt.�ng in order to makes sure that submittals comply with specifications to his understanding. The submittals shall be complete for the first submission andnot sent through in piecemeal fashion, as far as practical. SUBSTITUTIONS: 1. The materials and equipment described in the Bid Documents establish the standards and quality to be mei by any proposed substitution. The term 'nor approved equal" means that the product shall fulfill the function of the specified item and be approved by the' Architect/ Engineer. 2. Requests for approval on products not specified must be submitted to the Architect/Engineer at least ten( -10) days before the bid opening. Na substitution should be considered by the Contractor prier to bidding unless a written request for approval has been approved by the Architect/Engl"neerO 3. The request far prior approval shall be made for brand names 4. in lieu of equipment specified. Equipment submitted mast be equal or exceed all performance characteristics of specified equipment and be aesthetically acceptable to the Architect/ Engineer. 4. If the Architect/Engineer approves any proposed substitution prior to receipt of aids, such approval will be set forth in an Addendum. Bidders shall not rely upon approvals made in any other manner. 5. Bidder shall base his bid only upon the materials or equipment supplied by the manufacturers approved in the Bid Documents or Addenda. 6e For a period of fifteen (15) days after the Contract Date, the Architect/Engineer will consider written requester from the SECTION 15000 - 3 Madison High School Bailer Installation Rexburg , Idaho Contractor for substitution of products. The Contractor shall submit a separate request for each product, support with complete data, drawings and samples as appropriate,including: a . Comparison of the qualities of the proposed substitution with that specified. b . Changes required in other elements of the work because of the substitutions. c. Effect on the construction schedule, d. Cost data comparing the proposed substitution with product specified. e. Any required license fees or royalties, f. Availability of maintenance service, and source of replacement materials. The Architect/Engineer shall be the judge of the acceptability of the propose substitution. 7. The Architect/ Engineer will review requests for substitution with reasonable promptness, and notify Contractor, in writing, of the decision to accept ar red ect the requested substitution. If the substitution has a higher cost, there shall be made no additional cost to the Owner. If there is a reduction in cost because of the substitution, a Change Order may be written authorizing the substitution and thereby passing the savings on to the Owner. DRAWINGS0 1. Install work as indicated on drawings. Installation changes necessary to coordinate with other work or to neet architectural or structural conditions shall be made without additional cost to the Owner. 2. For purposes of clarity and legibility, drawings are essentially diagrammatic to the extent that mare offsets, bonds, unions, special fittings and exact locations are not indicated. Make use of all data in all Contract Documents and verify information at site. 3. All dimensions and locations of equipment, doors, partitions, fixtures, grilles, etc., are to be taken from the plans but sha 11 be verified at the 3'ob site . Drawings are not to be scaled. DER2NITION OF PIPING: SECTION 15000 - 4 Madison High School 11 Boiler Installation Rexburg , Idaho The term "piping" as used in these specifications or drawings mean all pipe, fittings, nipples, valves, union. etc. , as required far complete and. functional systems. C00►PERATIC3IJ WITH OTHER TRADES : 1. The Contractor shill give full cooperation to other trades and shall furnish in writing to the General Contractor, with copies to the Architect/ Engineer, any information necessary to permit the work of all trades to he installed satisfactorily and with the least, possible interference or delay, 2. Where the work of the Contractor wi1l be installed in close proximity to, or will interfere with work of other trades, he shah assist in working out space conditions tv maks a satisfactory adjustment. If so directed by the Engineer, the Contractor shall prepare composite working drawings and sections at a suitable scale not less than 1/4"-1'0"! clearly showing how his work is to be installed in relation to the work of other trades. If the Contractor installs his work before coordinating with other trades., or so as to cause any interference with work of other trades, he shall make the necessary chances in his work to correct the condition without extra charge. 3. The Contractor shall furnish to other trades, as required, all necessary templates, patterns, setting plans,, and shop details for the proper installation of work and for the purpose of adjacent work. INSPECTION= 1. Do not allow any work to be covered -up or enclosed inspected, tested and approved by Architect/Engineer or authorities having jurisdiction over the work. 2. Should any work be enclosed inspection and test, Contractor uncover work, and after it has 4r covered--ub before until other such shall at his awn expense been inspected. tested and approved, make all repairs necessary to restore all work disturbed by him to its. original condition. T YOR ceFINAL INSPECTION... 1!A -_ '-�.I■ I 1 ! - !l771�S��1 R r!!l�S�!! �R All of the fallowing items must be inspection. No excerptions will be made, be made until all items are completed. it Cleanin completed prior to final and final payment will not of Equ ipnent and Premises; SECTION 15000 - 5 Madison High School Boiler Installation Rexburg, Idaho Thoroughly clear all parts of Exposed parts which are to be gleaned of cement, plaster and and grease spats shall be carefully wiped and all Exposed metal work, shall be brushes to remove rust and clean. Trap elements shall and flushing period, after the apparatus and equipment. painted shall be thoroughly other materials, and all ail removed. Such surfaces shall be cracks and corners scraped out. carefully brushed dawn with steel other spots and left smooth and . be removed during craning which they shall be replaced. 2 operatinq Instructionsoperaand Service Manu .l l. The Contractor shad carefully prepare a full description and Service Manual.for the entire Mechanical System. Femur (4) copies of this Manual shall be submitted to the Architect/ Engineer for approval at the most 14 days after substantial completion of the. work. Failure to. submit for approval will delay final inspection and acceptance of the work by the Owner A. The Service Manual shall be of the covered, three {3} ring binder type, following on the cover and spineIV hard backed vinyl imprinted with the MECHANT CAL. MAINTENANCE OPERATING INSTRLTCTIUNS PROJECT SAME: MECHANICAL ENGINEER: MECHANICAL CONTRACTOR: B. The following items pertinent data shall sections separated by catagories; BOILER INSTALLATION MADISON HIGH SCHOOL REXBURG IDAHO McClure Engineering Superior Boiler together with any other necessary be included. At a minimum, provide indexed dividers for the following 1. Hat water Boilers 2. Domestic Hot Water Bailer 3. Controls Items and Complete 4. water Balance Report 5, Piping Specialties 6. Pimps This list complete 1 Section19 Draw incts . Catagvries separated and is Control Schematic to be used as a guide. of equipment Qr 5ybtem5 Miall be 9 by a divider with typewritten plastic SECTION 15 0 0 0 - 6 Madison Bailer Rexburg 0 40 High School Installatian Idaho protected index tab. 2 * Ma nu f a rf s Data; a . Provide a lisp. of manuf acturer and local representative names, addresses and telephone numbers in each category section noted above. These will be fog use by the. owner to obtain service and parts , b. Part numbers of all replaceable items. C . Manufa.cturerI s cats and rating tables, including brochures an all equipment fisted under Approvals Required. d. filing lubrication and greasing data.. e. Complete electrical load data. from operating test. f * Serial numbers of all principal pieces of equipment. g. Control diagram and operation sequence together with labeling of control piping and instruments to match diagrams. h . Valve tagging chard indicating location and function on job. i. Written Guarantees. System Test Run Reports* a . Complete -water balance report, As Built 9 lip A complete set of blame line mechanical drawings will be provided for the purpose of showing a complete picture of the work as actually installed, These drawings shall serve as work progress report shuts and the Contractor shall make neat and legible notations daily as the work proceeds, The drawings shall be available for inspection at all times and shall be kept at a job location designated by the Mechanical Engineer. At completion of the work, these "As -Built" drawings shall be signed by the Contractor, dated and returned to the Architect. SECTION 15000 Madison High School Boiler Installation Rexburg, Idaho Guarantee All work under this section shall be guaranteed in writing to be free of def ecti"ve work, materials, or parts dor a period of one (1) year after f incl acceptance of the work. Wotk required to repair or replace defective workmanship materials or equipment shall be done at no cost to the Owner. In addition, furnish all refrigeration and emergency repairs, emergency service and all refra.gerarit required during the one (1) year operation. Contractor shall submit a letter including items above and with blanks for date of acceptance and date of expiration of Guarantee, as part_ of the final inspection packet. IN'STRUCTIQN OF OWNER'S PERSONNEL: Prior to final 'inspection, the Contractor instructional tour of the entire project. by the Owner shall he instructed in: shall conduct an on-site The personnel designated A. Operation of all Mechanical Systems B. Elementary Trouble Shooting Procedures C. Preventatives Maintenance Procedures D. Uses of Operation and Maintenance Manuals A letter from the Contractor acknowledging such has been done shall be submitted to the Architect/Engineer with the final inspection packet. The letter shall list the names of the owner's personnel so instructed and endorsed by the owner to indicate completion of this item. MATERIALS: I. All materials installed shall be new, fall weighty of the best quality with the same brand or manufactures used for each class of materials or equipment, such as valves, pumps., boilers, controls coils, air handling equipment and filters. All rotating equipment shall operate in perfect dynamic balance. 2. All materials and equipment shall be installed in a meat and workmanlike manner by competent specialists for each sub - trade. The installation of any material and. equipment not meeting these standards may be condemn -ed by the Architect/Engineer, and shall be removed andreinstalled at no additional cast to the owner. nELzVERY AND STORAGE SECTION 15000 - 8 Madison High School Boiler Installation Rexburg, Idaho i's Deliver materials in ampler quantities from time to time as necessary for uninterrupted progress of the ward. Stere so as to cause the least. obstruction to the premises and distribute to prevent overloading to any portion of the structure. 2. Provide all temporary storage and shop areas that are required at site for safe and proper storage of materials, tools and other items used in the performance of the work. Construct only in locations approved by the owner and do not interfere with work of any other trade,. 3. Protect materials and equipment furnished under this section, either stared or 'installed, until final acceptance of the project as a whole, 4. Damage or defects shall be made good OVERTTME developing bef ore acceptance of the work at Contractor F s expense. Contractor shall include overtime costs TEMPORARY SERVICES: in hits Bid for this work. Provide temporary services when any interrupted in connection with work of period of time acceptable and approved by FABRI CATION, existing services are this section beyond the Owner . 1. All materials and equipment shall be identified by manufacturer's name or nameplate data. Unidentifi6 ed materials or equipment shall be removed from the site, 2. Equipment specified by manufacturer's number shall include all accessories, controls, etc., listed in the catalog as standard with the equipment. Optional or adda.tional accessories shall be furnished as specified. 3. Where no specifies make of material or equipment is mentioned, any 3firsi class product of a reputable manufactures may be used provided it conforms to the requirements of the system and meets with approval of Architect/Engineer. 4. Equipment and materials damaged during transportat-ion� installation and operation shall be considered as "totally damaged" and shall be replaced with new. Any variance from this clause shall be made only with written approval of Architect/ Engineer. SECTION 15000 - 9 Madison High School Bailer Installation Rexburg , Idaho ELECTRICAL 0 1. 0 General : A. Provide equipment to suit available power; this requirement supersedes the drawings and other portions of specifications. B. Provide and install electrical motors required dor equipment specified in this Division of the specif ications. Mawr disconnects . motor starters . relays, push 'buttons and pilot lights, thermal overlaid relays, connection of line and control conductors for motors , etc. � not included in packaged mechanical equipment shall be supplied installed and connected by the electrical Contractor. C. All power and control wiring and conduit is part, of the Electrical section and/or Automatic Temperature Controls section. D. Pressure switches valves, flout switchest electrical controls, etc.. not furnished bv the Contrnl -q Onntrantnr _ will be su Contractor connected Contractor pplied and installed bythe Mechanical �~ ~yi • under this section of the specifications, and bythe Electrical Contractor. The Mechanical shall furnish the Electra cal C'nnt-rac-tnr wi i -I, Lne necessary connection of submitted for wiring diagrams required for electrical this equipment. These diagrams shall be approval with the material submittal,, E. Equipment shall conform to National Electrical Manufacturer"s Association Standards, Loyal Code Requirements, and shall bear the Underwriters" Laboratories'' label where applicable. Fa ward openings giving access to "live" or rotating parts, with screen, grilles, or structural parts to prevent accidental contact with such parts, MOTORS: A, Provide motors for equipment of this division. Motors shall be minimum size as indicated, but shall have sufficient starting torque to start equipment. ... . I . - B. Motor enclosures where not specified shall be drip -proof for general use: totally enclosed fan cooled for wet, dirty or exterior use. SECTION 15000 -10 Madison High School Boiler Installation Rexburg, Idaho C, Install motors far in-line horizontal plane unless pumps for vertical 'installation. 3. STARTERS: circulating pumps in a are speci f ica l ly des igned A. Provide starters for packaged are an integral part, or where compatible with special motors. and Specifications for special equipment where the design must See Equipment requirements. starters be Schedule 8. Starters dor standard motors shad be furnished and installed by the Electrical Contractor. Starters furnished by the mechanical division shall be an integral part of the mechanical equipment. Electrical connection shall be by the Electrical Contractor, However, this division shall coordinate wank to provide a completely operative system. Starters furnished under this section shall comply with the following; a. Enclosures : NEMA. Standard far the locat ion general purpose, NEMA Type 3 for for watertight; NEMA Type 7 and b,. Thermal Overload Devices:- used; NEMA Type 1 NEMAfor raintight; NEA Type 4 I for explosion proof. 1 for single phase standard motors, 3 for three. phase standard motors. 1 far each ungrounded conductor for each, winding of multi -winding or multi--speed motors. Do Manual starters may be used dor motors up to 1/2 HP where no interlycking is required. Provide pilot lights to indicate the "ON" position. E. Magnetic full -voltage starters for motors up to 30 HP. F. Magnetic starters shah have 120 volt or lower control circuits; HOA switch in the cover; auxiliary contacts for necessary interlocking; integral disconnect switch or circuit breakers for branch circuit, and short circuit protection . G, Short circuit interrupta..ng capacity of starters and disconnects, shall be adequate fir the voltage +employed and for current to be interrupted, This may require use SECTION 15000 -11 Madison High School Boiler Installativn Rexburg, Idaho of high interrupting capacity breakers or current limiting fuses, If fuses are used, provide three (3) spares for each disconnects. CONTROLS. Provide transient aver --voltage protection for all solid state electronic devices. where protection is not incorporated within control device, provide auxiliary over voltage suppressors selected to protect the. equipment completely. SCAFFOLDING, RIGGING HOISTING. The Contractor shall furnish all scaffolding, rigga.ng, hoists, cranes, and services necessary to erect and deliver to the premises any equipment and apparatus furnished. Remove same from premises when no longer required. MANUFACTURER S DIRECTIC3NS The Contractor, shah install all equipment an strict accordance with all directions and recommendations furnished by the manufacturer. Where such directions are in conflict with the glans and specifications, the Contractor shall report such conflicts to the Architect/ Enq ineer who shall make compromises as he deems necessary and desirable. LUBR T CATIONS0 0 The Contractor sell provide all ail for the. operation equipment until acceptance. The Contractor shall be held responsible for all damage to bearings while the equipment operated by him up to the date of acceptance of the 11 -1 4 - of all is beim} P_►«" • 1f1C LViIL,CdCLC]I- snail protect ail bearings and during the installation with proper lubri'cation and preventative coating . ACCESSIBILI'T'Y: shafts rust The Contractor shall locate all equipment which requires operations or servicing in fully accessible positions. For example: Valves, taps, gauges,clean-outs, motors, controllers, f iltersr switch-- gear, and drain points, If required for better accessibility, furnish access doors for this purpose. Minor deviations from drawings may be, made to allow for better accessibility, with the Engineer's approval. The Contractor shall provide the locations of access panels for damper, or other devices requiring provided by the Contractor, General Contractor with the exact each concealed valve, control, service. Access panels shall be and installed by the General SECTION 15000 -12 Madison High School Boiler Installati,on Rexburg , Idaho Contractor. Locations of these panels shall be SUb](Ctltted, insufficient time to be installed in the normal course of work. All cost incurred through Failure to perform this function as the proper sequence of this work dictates, shall be borne by the Contractor . Thi type, of access doors shall be as required by the room f inish schedule. Acoust ical file access doors shall be equal to Krueger type B, Style A for Acoustical plaster and Style C -fie for sidewall, drywall or plaster construction. Where access doors are installed in walls required to have a specific fire rating, the access door installed shall be fire rated access door with U.L. label, as manufactured by Nlilcor or approved equal. Access dater in 1 -hour construction shall be Class C and access doors in 2 --hour construction shall be Glass B. Access doors shall be large enough to easily perform the function for which the access door in intended. DIET OPERATION AND VIBRATION: All work shall operate under normal conditions of load without any sound or vibrations which is v�jectional in the opinion of the Architect/ Engineer. Sound or vibration noticeable outside of the roam in which it is located or annoyingly noticeable inside its own room, will be considered objectionable, Sound or cribration conditions considered abjectianable by the Architect/ Engineer shall be corrected in an approved manner by the Contractor at his expense. Vibration control shall be by means of approved vibration eliminators in a manner as recommended by the manufacturer of the eliminators, MECHANICAL EQUIPMENT HANGERS: The Contractor shall provide support far his work direct to the building structure, and shall not hang equipment or piping from ductwork or other piping, or other installed items. FLASHTNG: All pipes and ducts penetrating exterior walls or roofs shall be flashed and counterf lashed watertight. Where other materials are not specifically shown or specified, flashing and cvunterflashing shall be 24 --gauge galvanized steel, CUTTING AND PATCHING, Mechanical work shall be laid out in advance of building construction to permit building in pipe sleeves, inserts, anchors, hangers, supports, fixture carriers etc., so as to eliminated unnecessary cutting of structural members. Where cutting becomes necessary, the Contractor shall employ the trade installing the work originally to restore such cut work and close aper�ings SECTION 15000 -13 Madison High School Boiler Installation Rexburg, Idaho communicating from one compartment member shall be cut without the Architect/Engineer. PAINTING All mechanical to. another. Na st t ral written consent of the Painting shall be by the General Contractor, ABBREVTATTONS AND .SYMBOLS, Schedule of abbreviations and symbols an commonly used. Not all shown will appear drawings show those most on drawings and drawings -MaY C:0nua-.n some hoz shown in schedule, obtain clarification from Architect/Eng neer an any quest ionable item before submitting bid. IDENTIFICATION: PIPE IDENTIFICATION: Tdentification of piping shall be done with Setmark pipe markers as manufactured by Seton Name Plate Ciro. New Haven, Conn. 06505 or approved equal. The calor coding shall comply with ANSI A13.1- 1981 Safety Color Coding regulations. The means of identification shall be a talar coded band and ars identifying legend to indicate the contents of the pipe and a direction of f low arrow, The identifying coded color bands, legends, and directional arrows on piping systems shall he located adjacent to each valve, at every point of entry and exit where piping passes through a wall or Ceiling, �on,each riser and junction, every 50 feet on long continuous lines and adjacent to all special f ittings (regulating valves, etc.) Legends shall be. applied on the pa -pe in a location that will personnel from the floor area. EQUIPMENT IDENTIFICATION: color band on the perimeter of the be easily visible to operating Except for individual room heating units, and items furnished under Temperature Control, X11 items of mechanicpment including pans, pumps, boiler, and electrical switches and starters for mechanical equipment and gauges shall be labeled. Information on labels shall include the f ollowing: 1. Identification number and name. and name shill be the same as that or in these specifications. 2. If the item is a fan or pump, the Generally phis number shown on the drawings flaw and head shall be SECTION 15000 -14 Madison High School 0 Bailer Installation Rexburg , Idaho indicated, 3. If the item is addition to its it. is serving. part of a unit the label shall item numberr, the number of the 4. Valves shall be normal operating 59 YYjlel'e the only the nameplate. tagged with the pas tions shall mein unit serviced by valve function needs have,in main item area served and their be indicated. the valve is apparent, to be included on the The types of nameplates shall be as follows: 1. Valves tags shall be 1J2 -inch embussed tapes with identification on one side for valves. Tags for magnetic starters shad be screwed to the metal starter cover. Tags shall be Addressograph No. 8--5300, or equal. 2a equipment nameplates shall be black faced formica with white engraved lettering at least 3/16 -inch high, or equal. Valve tags shall be connected chains. Screws shall be uses installat'vri, the Contractor complete list of all valves identif ied. END OF SECTIC?N 15000 to valve stems by steel r.ings or I for equipment labels. Prior to shall submit to the Engineer a and each item of equipment to be SECTION 15000 -15 Madison High School Bailer Installation Rexburg, Idaho DIV. 15 - SECTION 15100 PIPING MATERIALS AND METHODS GENERAL0 1. 1, Requirements: The requirements listed under General Conditions, Species -1 Conditions and General Requirements are applicable to this section and form a part of the contract. 2.o Work to be Performed: Perform all work awarded to the crafts of this Contractor by reason of labor agreements and 0 0 3urisdictions at no additional cost to the Owner. SCOPE - 'his section covers the materials piping portion of this contract, 1. Hydropic piping 2. Domestic water 3. Boiler make-up 4 . 5. 7 .0 0 piping mpi Miscellaneous. vent and methods used to complete the including, but not limited to, blowdown piping and relief discharge Install control valves. Provide and install pumps. miscelianous pip51 ing specialties. ABBREVIATIONS: 0 piping The abbreviations that fallow refer to standards or specifications issued by the organizations identified below: ANSI American rational Standard Institute, 1430 Broadway, New York, New York 10018, ASME American Society of Mechanical Engineers, 345 East 17th Street, New York, New York 10017 ASPM American Society for Testi ng and Materials, 1916 Race Street, Philadelphia, Pennsylvania 191(]3. IAPMO International Association of Plumbing and Mechanical SECTION 151.00 - 1 Madison High School Bailer Installation Rexburg, Idaho Officials, California 90032, MATERIALS: 5432 Alhambra Avenue, Los Angeles, 1. Black and Galvanized Steel: ASTM Specif ication A120 or ASTM A53, Type E or S, Grade B . 2. Copper: ASTM Specif ication X88. Pipe i i Z , Screwed -black 32510, 150 lb. far steel pipe black to match 2. Solder: ANSI and galvanized steel: ASTM Spec. A47, Grade or 3 00 The , as required, banded malleable iron 2" dia.. and smaller. Galvanized or pipe. Standard B16.18 for cash bronze solder -joint pressure f ittings. ANSI STANDARD B16,12 for wrought capper and bronze solder-jointpressure fittings. 3. Welded: All weldingfittings used in the systems shall be manufactured by Tube Turns , Inc . . Taylor Forge and Pipes Works, Tube -Line or equal. Fittings shall match the pipe in which they are installed. For black steel pipe 2" die. and larger, use ASTM Slee. A234 standard weight steel butt welding fittings, Na miters allowed. 4. Branch Connections Welded.* Connections made to mains shall be made with Schedule 40 welding fittings when the branch size is equal to, or one size smaller than, the main. when the branch size is two or more pipe sues smaller than the amain, "Weld -0 -Let" or "Thread--p-Let's fittings may be used. "Weld -0- Let" and " Thread -t? -Let" type fittings shill be manufactured. by Bonney Forge, Tool Works, Phoenix Forging Company, or equal. Fittings shall match the pipe in which they are installed, 5e Flanges toFlangedjoints in steel pipe shall conform to the American standard fir cast .iron flanged pipe fittings, Class 125 (B16-1-1948) and ASTM A126, Class B. For 150 1b, yr 300 1b, carbon steel flanges, conform to ASTM A181, Grade i. 6, unions: Piping 2-1/2" and larger shall have bolted flange 0 6 connections. For piping 2" and smaller, furnish 300 lb., ground joint, malleable iron, screwed unions, galvanized or black to match the pipe., Dielectric, Epco, or equal insulating fittings shall be used to connect dissimilar pipe materials to prevent eleGtralytic action. SECTION 15100 - 2 Madison High school Boiler Installation Rexburg , Idaho PIPE JOINTS: 1. Threaded Joints: Threads on iron pipe sire pipe shall be standard taper pipes threads. When a pipe joint material is used it shall be' applied only on male threads and such materials shall be approved types, insoluble in water and non- toxic. Cleanout 'Plugs and caps shall be lubricated with water- insoluble, non --hardening material or tapes. 2• Welded. Use gas or electric -arc welding in accordance with ASME Code for pressure piping. 3. Flanged Steel; Use factory cuto, asbestos -free, compressed sheet ring gaskets, or equal. All flange fasteners shall be zinc plated or galvanized. Coat gaskets with fluid--compatible lubricant before installation. 4. Solder Joints: Tubing shall be cut square and burrs removed. Both sidesof fittings end outside �f tubing shall be well cleaned before sweating. Care shall be taken to prevent annealing of fittings and hard drawn tubing when making connections. Joints for sweated fittings shall be made with a non-corrosiue past flux and solid 50/50 tin -lead or 95/5 din -antimony wire solder. Cared solder will not be ermitted, SERVICE Domestic Water Make --Up Water .Alm PIPING SYSTEM MATERIALS (Hot and Cold) SYSTEM CONSTRUCTION Schedule 40 galvanized A120 or better with 150 1b. malleable iron fittings to match. 4r piping shall be Type L hard drawn popper tubing with solder type wrought copper f ittings. Connections made with factory made 'Tee Drillrequipment will be pern lotted . Schedule 40 black A53 wieth forged steel, welding fittings, 9 0 Piping 2" and smaller may use 300 lb. malleable iron threaded fittings. Or piping shall be Type L hard SECTION 15100 - 3 Madison High School Boiler Installation Rexburg , Blowdown Idaho Relief Valve Discharge and Drains Hydropic System GENERAL PIPE REQUIREMENTS: 1. Provide and erect,in best practices of the I. complete installation t the drawings shall be may not show all items 2 Size any section same i the are nominal copper tubing with solder type wrought copper f ittings. Connections made with f actory made `Tee Drill' equipment will be permitted. Schedule 8 0 black Al2 0 or better with 300 lb. malleable iron threaded fittings. Schedule 40 black steel pipe with 150 lb. malleable iron threaded fittings and approved pipe daps . Piping shall be Schedule 40 black steel pipe with nasi iron screwed (fittings, or forged steel welding fittings. P �.ping 211 and smaller may b.e schedule 40 black steel pipe with screwed malleable - iron fittings. Victaulic coupling with schedule 40 pipe acceptable with hydronic piping 2 1/2" diameter and above. Victaulic valves are also approved. i workmanlike manner, according to the trades, all piping required for the )f these systemsi. The piping shown on considered as diagrammatic and may or in their correct positions. of pipe, for which size is not indicated, the largest pipe connecting to it. Sizes fished 3. Piping shall be arranged to maintain head room and keen passageways clear, and where necessary, shad maintain the required clearances and conform structural features of the building. All piping run parallel and straight with adjacent walls or shall present a uniform appearance, and shall be together in long runs. All hanger rods shall be 4. The piping mai have to he offset to with the shall be ceilings, grouped vertical. offset, lowered, or raised as SECTION 15100 - 4 Madison High School Bailer Tnstallation Rexburg, Idaho required, or as directed at the site. This does not relieve the Contractor from responsibility for the proper erection of systems or piping as described in the specifications and approved by the, Engineer. All pi ping shall be cud accurately for the fabrication, to measurements established at the canstruction site, Pipe shall be worked into place without springing and/ter forcing, properly clearing all windows, doors! and other openings and equipment. Cutting or other weakening of the building structure to facilitate installation will not be permitted, 5. Make changes of sizes or Street ells, bushings, fending of pipe are not direction with manufactured fittings. reducing flanges, close nipples and allowed, unless specifically called auz. wnerever changes in sizes of pipes occur the changes shall be made with reducing fittings.. All pipes shall have burrs and/or cutting slag removed by"reaming or other cleaning methads. f. All open ends of pipes and equipment shall be properly capped or plugged to keep dirt and other foreign materials out of the system. Plugs of rags, wooly cotton waste or similar materials may not be used in plugging. 7. Provide unions at connections to equipment, on service side of valves, and elsewhere as required to facilitate maintenance. Flanges or unions,, as applicable for the type of piping installed, shall be provided for connection to all items of equipment. s, Run full pipe size through shutoff valves, gas cocks , balancing valves etc. Change pipe sizes within three pipes size diameters of final connection to temperature control valves, furnaces, pumps, boilers, fixtures, cvils, and other equipment. 9. Provide dielectric connectians between copier and dissimilar metals. In copper systems threaded piping including connections to equipment. shall be brass pipe ani fittings., lo. All piping shall be sv installed to insure noiseless circulation.. All valves and specialties shall be so placed. to permit easy operation and access. All valves shall be regulated, packed and adjusted at the completion of the work! before final acceptance. All piping shall be erected to insure proper draining. Steam mains shall be pitched down in the direction of flow, a minimum of 1 inch per 40 feet. Condensate return mains shall be pitched down in the direction of flow a minimum of 1 inch per 20 feet. Water piping may be run level, but shill be free from traps. SECTIa►N 15100 - 5 Madison Nigh School Boiler Installation Rexburg , Idaho I1, All pipes Piercing waterproof membranes shall he flashed watertight. EXPANSION ANIS CONTRACTION: The Contractor and contraction as required to shall make all necessary of piping, with offsets, prevent undue strain, PIPE HANGERS AND SUPPORTS: 19 General: provisions for expansion loops, anchors and guides, A. Use ITT Grinnell, Fee & Mason, Kin --Line or equal. B. All support components shall conform to Manufacturer's Standardization Society Specification SF -58. C. Use zinc plated or galvanized hanqers attachments, moods, nubsbolts, and other accessories in boiler rooms and other high humidify areas, or where exposed to the weather. 2. Horizontal Piping: A. All piping shall be rigidly supported from the building structure by mans of adjustable type hangers. Where pips run side by side, support on rod and anile iron trapeze hangers. Minimum hanger spicing shall be as scheduled to prevent sagging, However, were structural members are on centers at odds with the schedule, the shorter centers of the structure shall determiLne the hanger spacing. In any case, the hanger spng shall be sufficient to- support the weight of the pipe. B. Flexible connectors shall be supported on both SldeS., within 2 feet of the connector. C. Hanger Spacing'. STEEL PIPS ,PIPE DIAMETER MAXIMUM SPACING COPPER TUBE MAXIMUM SPACING 1%211 5 r_011 5f _011 3/411 - - 61-011 Jcr -Olt 111 to 1,1/411 7 -011 5f �011 1-1/211 9 .0 If 211 lor-011 8 r .011 2-1/211 11r__011 9 r �01'1 311 12/-011 JL01�011 SECTION 15100 - 6 V Madison High School Baler Installation Rexburg Idaho 41r 14 '--Q 12 ► _0r1 511 161F -011 8" 191�011 D. Support Rad Dimensions: 1 /2 It t0 2'r pipe 3 /8 It rod 2-1/211 to 311 pipe 1 2 It rad 411 to 511 pipe 5 / g rod 611 pipes 3 4 rod 8" pipe 7/811 rod 3, Structural Attachments; A. Attachments to solid concrete shall use Grinnell Fig. 285 light weight concrete inserts for loads up to Opp lbs,, or Grinnell. �'ig. 282 1�� universal concrete insert, for loads up to I,140 lbs. Bo Attachments to steel beams where pipe is 211 or less shall use Grinnell Flog, 87 malleable iron C-clamp with retaining clip, or equal. Where pipe is 2-1/2" or larger, use Grinned Fig. 229 malleable iron beam clamp with exterision piece. 4. Intermediate Attachments: Continuous threaded rods may be used where necessary. Na hooks, chains, wire or perforated straps may be used. 5. PiPe attachments: A. For steel pipe or insulated pipe with protection shields, use Grinnell Fig,, 260 clevis hangers or Grinnell Fig. 70 adjustable hangers, or equal. B. When thermalin excess of 1/2" anticipated. use Grinnell Fig. 174 adjustable roll, or Grinnell Fig, 271 PjLpe.roll stand. Where pipe is insulated, use a pipe covering saddle in conjunction with the roll device., 6,6 Spring Hangers: A. For wipe sizes 2" and less, to 3/411 are expected, use spring hanger, or equal, insulation adjustably swivel ring axially iS swivel pipe or equa 1. protection where vertical movements up Grinnell Fig. 247 light duty SECTION 15100 - 7 Madison High School Baler Installation Rexburg , Idaho B. For pipe sizes larger than z'{, use Grinnell Fig. 268 spring hanger, or equal. TESTS. I. General: A, The piping shall be entirely free of sir when Perf orming the hydrostatic tests, B. The Contractor shall coordinate the dime of hydrostatic test (s) by ratifying the Engineer at least 48 hours in advance of the proposed test(s), C. Any piping which is to he insulated,. placed with the construction, - or otherwise concealed, shall be carefully tested before being insulated or permanently enclosed. D. Instruments required for making the tests shall be provided by this Contractor. Relief salves set tv avoid excessive pressure during testing shall also be provided. E. New pipe -lines which are to be connected too existing pipe lines shall be tested by isolating the new pP. ipe with spectacle blinds, blind flanges or other suitable mans. F. Before f inal acceptance of the piping system as a whole , the Contractor shall make all required adjustments including controls, valves, etc. , and shill place the entire piping system in perfect operating condition. At the completion of the work, this Contractor shall furnish the Engineer with all certifications of inspec�ifln. G. If inspectian or tests show defects, such defective worl� or material shall be corrected or replaced and inspection and tests shall be repealed. All repairs to piping shall be made with new materials. Na caulking of screwed joints or hales will be acceptable. All defects in materials and workmanship which appear during the tests shall be promptly remedied and the test small be reapplied. 2. Wader Lines: (Including make --gyp, cold, blowdown) All water limes shall be tested hydrostatically at 125 psi and shall show no pressure loss in a one hour eriod. 3. Hydropic System: Piping shall be tested with a 125-1b, hydrostatic test. SECTION 15100 - 8 Madison High School Bailer Installation Rexburg, Idaho Valves shall be installed as necessary to pressure shall remain on all parts 0 a 0 isolate system. The of the system fir cul L 1U1U11 L Llme za permit a complete examinatiron. FLUSHING DRAINING, AND -CLEANING PIPE SYSTEM: The Contractor shall flush out all water piping systems with water before placing them in, operation. Air lines shall be cleaned bY blowing them out with air. After systems are in operation and during the test period, all strainer screens shall be removed and thoroughly cleaned. LVE 1 . General: A. All valves shall be installed in locations which allow ease of operation and maintenance. B . Provide valves, cocks and strainers at nominal pipe size unless otherwise indicated.. C. Wherever passible, install valves with stems in a vertical position. Da not install with stem below a horizontal position unless approved by the Engineer. 2. Specifications and Approved Manufacturers: A. C. Q Gate Valves: 1. Valves 2" and smaller shall be Crane No. 428 or equal, bronze, screwed, 125 psi steam rating with rising stem. 2. Valves 2--1/2" and larger shall }3e crane No. 4b5 -1J2 or equal, Clasp 125 flanged iron body, bronze trim and rising stem. Ball Valves,, Valves shall be Jamesbury Type 1000 or equal, bronze screwed body with bronze trim, TFE seats and seals. Swing Check Valves: 1. Valves 2" and smaller shall be equal, bronze, screwed, 200 regrindable seats. Boiler Pressure Relief Valves: Cram Na. 3 6, or lea. rating, with SECTION 15100 - 9 Madison High School Boiler Installation Rexburg , Idaho E. Boiler pressure rel0 ief valve of the boiler. manufacturer, BTUH capacitor sit by boiler Manual Air Vents and gauge Provide Crane'Nv. 88 bronze Flow Control Furnish Furnish equal, SPECIALTIES: 19 General: to be ASME rated far full halve to be furnished and Valves: needle valve or equal. Balancing Valves: single component circuit balancing valves. Armstrong CBV1 series, ge11 & Gosset, or approved A. Each pressure gauge shall be repairable, with construction materials, graduations and range suitable for the application . Gauges shall lae provided-with isolating valves .10 subject to vibration or shock loads provides snubber or liquid -f illed gauge. Be Each thermometer shall have a field adjustable scale for calibratian. Provide thermometers suitable dor environmental and operating conditions. All thermometers shall be installed in matching thermowells.. Where. installed an, insulated piping or equipment, use extended, neck thermowelis to place the thermometer outside the insulation. Each thermometer shall be calibrated at mid, scale before project completion, CO Provide fall or globe valves for strainer blowoff. Direct blowoff to prevent personnel or equipment damage. Valve shall be the same size as the nominal blowoff Connection. D. Install all piping connection without strain to pump or equipment connection points. The Contractor may be required to disconnect piping to demonstrate strain -free connectians. 2. Specifications and Approved Manufacturers: A. Pressure gauges shall Ashcr-oft, "Duragagel' or equal. Dials shall be Provide Crane No. 88 or E'_aCh gauge s be Marshalltown "Premagage'fr Trerilce No. 50OX, or approved 4-1/2" unless otherwise noted. approved equal needle valve for SECTION 15100 -10 Madison High School Bailer Installation Rexburg , Idaho g. Thermometers shall be lens front, red reading 911 mercury type; straight, back, side or adjustable angle mounting to suit -installation. Weksler Industrial Thermometer or equa1,, C• Saf ety valve discharge elbows shall be Grinnell Figure 1538 or equal, cast iron, threaded inlets. Install at the point of discharge for alb new relief valves. D. Backf low'prev'entor shall threaded bronze construction, reduced pressure-type, with corrosion resistant seats, springs, shafts and fasteners.. Furnish with ball valve test cock. Unit shall be approved for high hazard crass -connect applications by IAPMO and local authority having jurisdiction. Furnish Watts #909, equal by Febco or approved equal. Pipe drain connection to floor. E. Flexible connectors shall have a corrugated inner tubing of tin bronzes (98* -3/4% cu, 1-1/4% tin} or stainless steed.. Outer shield shall be wire braid of same alloy. Flanges shall be ASS 1.50 Th, standard flanges. Connectors shall be rated dor 150 psi working pressures with a 4: 1 safety factor, Metraf lex ML, Flexonics. or equal. F . Hydronic S Bell & Gossett, 1, Con rens ion Taco., Tank: Provide equipment listed below by Armstrong, or other approved equal. Welded steel, 150 PSI, tank. Provide with air glass. Furnish Bell & Airtrol, Armstrong, or 2. Air Separatore.- Separator Separator strainer. Armstrong, horizontal, ASME control f itting Fossett Model No approved equal. to be ASME rated to be rued for 3 4 6 Furnish Bell & or approved equal. . l"oma Pum -1; rated, 15 gallon and sight gauge 15 with ATF -m-12, of steel construct ion. GPM and have. a re -movable Gossett Rolairtrol R-5, Furnish and install base mounted circulating pumps with iron body, bronze fitted with mechanical seal, and rubber -mounted motor, and suction diffusers,, at locations and capacities as shown on mechanical drawings. Furn0 ish Bell & Gossett, Armstrong, or approved equal, SECTION 15100 -11 Madison High School Boiler Installation Rexburg , Idaho 3 x ; Installatian: A • All specialties shall be installed in accordance with the best standard practices and as recommended by the manufacturer, B . Where thermometers or fest fittings, occur in insulated piping systems or in insulated equipment, extension necks shall be provided to extend beyond the insulation. C. Manual air vents shall be installed at the high paints in the piping system, and at each new hot water convector. END OF SECTION -15100 SECTION 15100 -12 5