HomeMy WebLinkAboutSPECIFICATIONS - 94-00021 - Hogi Yogi - RemodelCTION 0 10 10
- S2MARY Wo.,
- cExE
�..jo D.&NTIFICATION
ds shawr� on Contract DaPr
o�ect names is HOGI YOCII�ocati�n of t�.e �S prepared bY
R,-staurant f
project is 400 South and pDes*�g� Grotlp,
Th e :+,park Wes t, Rexburg, Idaho.
i�icZudes constructzan of �
��i��3�g bu*ld6r� restaurant with.
kitchen � preparati,on r room InC�u�es a din im �-n an
and other misceli��Iau�ea rvice .area,
Th-M-�i aac�rk includes woad ice
.
window units spud �rami�g with drywalinterior finish sa� �c1u�' k�tc�e� � 3, doors
In ���'��ent, hardware
n Incr Anei
work also includes
Vent1 Za't1I3g r electrical.
31dI'm SYStE:mS .
Con+--P--n,+. .
w%jwuworx,,
Certa1I'I lt""S 4f
Plumbin{.
lighting, %ornm,unl.c.a. L.ions�
.. me ownr shall be x�espar�sihl �
agreements with t -hes
heating_
and fire
which is shown on the draw*n is �5 f �r the � pe,f., �n�e J- a 0�tracts and
� and
The COntracouL.�ned in the
t sham consist of the
owner ani -t�- Ctractor binc�in both .����executed�exectQd bY doth theCOntract Documents. �parties �b
the werms of the
sPecifica.tioQ,4. X%,
ns ,
�= All c4nstruct ion shah
Uni forM Bui Zdiri
appl ica��. � codes Code � local and
rc�inances,
Protections:
cQnstructi on .
facilities and
E�sux-e
Conduct
Persons.
conform tO the latest edition a
C*ty requix`ements, and alb at�
hem
safe passage
Operations to
Of Persons arour�c�
preventinjury to
�.a=. Promptiy �,epair dame es
dem�litivn or cons���n�-= --- � caus+�d
to remai'n.
�Ut i i tU-! i
SECTION01030 _
operations at
adjacent
adj,�cent facil.1�,ies by
most to Owner.
I�aintain and protect exist�,n
9
HI - & DTGGr�xG
Definition : '1tIng.,
atch
or uncover .�ng existin
in
ost rut
q & digglln�f� i
�14i� to provide
LItl.1lE'S indicated
ncludes cuttirig into
for the Lnstallativri
HDGI YOGI
or perfOrinance of o
required to restores
azruc ural
Cher work and sub quent f it�i�
surf aces to the,�r original co�dlti�d patchir�g
n.
-.�� . �� not cut -and -patch str�,ctur�l work in resulting in � loadjaeflectio�. ratlo�ductivn c�f load--carrYJ-139 a manner
capacity a�
Arch itect1s/En,�ineer�s submit propvsal and re
cut -aid --pitch a� structural work,
oval bef�yre Wiest and obtain
ark. preceeding with
VisuMINIM .al u.......... 111111,a i t L '�n.��atians: Do
view (exter.ior and interior) in
reduction of aesth+�tic qual*td
bY Architect/En9ies
�eer.
PRODUCT
not cut -and--patch
a manner resulting in
and similar qualitles
ex�apSed to
noticeable
as judged
General: Uwe materials for
materials. If ic�materials that ars identical to exist'
used u$e �athat match exist�n�vt available, or cannr�t�be
f ullest extentible�J a�.�acent surfaces to the
materials �3th �egard to visual effect,
equal�v�--lett �Perfvan� � tet. �3se
mance character.* t�ict�at wzZZ rc��It in
s.
3 - EXE
In ec�tian: Before cuttin
conditions under which the wo�xrisd��ging • examine surfaces and
otherwise unsatisfactor �e Performed. If unsafe or
corrective action before ��orrditions are er
proceedinq ra�.th the work ► fake
�i�c q;.L en: I f
immediately notify
uncavered condItions are not as anticipated
the Architect ac� secure �i�ectians. ��t�d,
Rrqtect'Zri; Protect other work duringdigg�.ng to prevent damage. Pro cutting. patchingaweather conditiar�s far that ��'�� ��
par�.of tieprojectprotection from adverse
during cu�tir�s� and that may be ex vs
ase of adjoining ar�toPerat,�v�s. Avoia i��__ �' _ ed
areas. rake �'rrupt�on
the building . �r�cau�ions not to cut
END OF SECTION 01030
a ECTION IIIIIIIIIIIIIIIIIIII.
iz-o-L -L Of. free passage to ce W,
exsting Ape or conduit in
PART I -GEN
Types 0 work
a
1n this SE?Ct1flI'1
Wood f ram�.ng
Woodfurring and blocking
a � tv ra er
install treated -lumber
slabs.
�''��e�` Ge er�xl:
comply with Ps 20
agencies certified
I UMber with 19 pe
shiPrnent, f or size
DlmensiO Ll
Species and
2 X 4 P
01-sts
17aT _
include-n+-bare not limited to:
neeP materials under Cover and dry,
in a�2 areas where
framing bears, on concrete
Manufacture jumber1111 �
ald applicable grc-tdingSand gradesta��p�d, to
by Ai�SC's Bc�of Review, pies of inspection
rcent moistures �onter�t �� Provide seasoned
211 v�` less in th.ic,k�es� , time Of dressing
grades
t
Unless otherwise note. the foil
shall be used for structural lumber&����� Food
_
UM Fb
1450 p
hem fir msr. rated 165a f
shall be stud grade.
Standard -
Am 'I usE
ZuMber f o�
nai�.e�rs, blocking, f�.rring.
.0
9M;* Use Douglas f-
Si.r No .
(SIngle) and 150
""
1*5 E. Inter*or non
ten �rs and Ancho
suited tc� applicableanchors Of the size
manuf acturer, .
TX-re-ated woad
mater -borne
respectively.
2 grade or better
i
( repe�ati�r�) Q�
earing partitions
'S = Unless. vtherwise .
support bases ��d�-catec�. provide
nt
grounds , s tri�pi�� ands � � P$ r bucks
4QLeg:
Of SjLZeF type,
sbown. Provide metal
and tyP� recommended
Preservative
preservatives
secure].-w---Uwg
� attach
pressure
to campy
mater3a1 and
hangers and
for intended
finish
�ra�rting
use by
at lumber and plywood
with AWPA C2 and
Wlth
C9,
using b-1
fasteners � a� AJL 'L size that twi�, at's and su
OPpas i to side wi 1 �. b� exposed to v • �°� p��r�ing ffiembers
Instal -1 fasteners without � Aex�etr�te members where
yew or �-eefinish �u�ter�3�s .
allow f c�r exansion a� ��-ittinc� wand. fac�lve
st�r�� p,��ei
Jolnts unless at�,erw1se Products to
Prnvide wframing members a �-nd�.cated -
spze
�i�e s�ructural m�mb�rs between S
and spacing in+dica�e�;
uppvrts. F�restvp con
da not
ceaZed
HOGI YOGI
spices With wood blocking not
other fraleSs than 2 It thieckming members.
Anchor and ria i i +-.,
"Manual for Hausa Frame n Yf w�Ln
g pub]
END OF SECTION 06,10()
SECTION 06400 -
if not b
locKed by
RecOMMended Naili
ng Schedule#, of
Ished by NF.P.A0.
CHITECT
URAT.Wnor�Wo
extent .0 f architecturalwoo+dwar�
includes , but is not 1 invited t� � is shown on the dr�wir� s .
h� follawa.ng, � �t
Architectural Casework
uaZ'ty s�andard�: Comply with ASI Sec4a0A "Wood Cab�.nets'f tion 4U0 and
ids Di,jsiort
PPAT 2 -PRODUCTS
Casework shall be plastic lam
inate
clad.
La .mate: High
following.
ForMica
Wi I son Art
Nevamar
pressure laminates as manu�`actured by owe o f the
Color as selecy the Ovnerrs Representativ,.
gbstr�te ; Laminates to be bonded to45# density particle boardard(CS aab�.e substrates � m.,�-,.. _ such ac
AJ.hp.siv : Contahesive �s
recommendativ�ns.
��elvin
Mate
vxnyl Taftedges
pistili Ta
�urarte B Cass 2).
--�
recor�menc�ed by manufacturer's
3/4" particle board with I
amine
finish and
I %... L-iL UZ- r patterh
aPPlicaton, as selected
man�.facturer's standard prod
GOMPlY Wi th
and f i r,; ��,
by
u.cts ,
•— �o�c�a7;i
NEMA LD - 3 f or
i0 errs
ndcated for
Representative
type�
each
f ry
�t
ab'n t H dwa re �nd
&C 115
hardware as indicated axe d�awi IT
�esso� M teri� � .
with �requ.��e�ents n�� ani acces�o� ProviAe cabinet
rnanufacturer, etc, ��diCated for desi Y i(tate�1��5 �o COMP�3�. materialf�1�
► znish,
P T 3
EARLM.- �J��EXECUT
ON
I latign 0 Install archit�ee
strai+gh�t with no �ura� w�aodwork umbshims d�-s�artion.Shim a� pi r �.evei and
S�zi�e and cut wo�d�rr�rk tof��'quired us�n
woodwork to anchors car b locking �t ad �oi�in g concea�.e�,
cvnGea2ed fasteners . or directly to substrates ates work A
�hv�-
using
�asewor3�
fit openings
D 4 at.ern s:
Insta 6 .t�.out
and ar� distOrtion
Pgc�perly al
Igned
.
Anchor securely to baste
END OF SECTION 06400
SU
DRvwar r
PART 1 Olin
Extent of drywall work
is not liM-1ted to the
SO that doors and drawers
is indicated an draw*ings,it includes fvl2awing.' but
GypSUM wa 11 board.
Drywalj. f inashing .
Use only qualified anc� experi enced insta I lers
,
PART a - P�gpp��TS
GYRin
sum oard Standard
with tapered edges, gig
Trim
ASTM C 840.
"
thick unles
!95-sori,5�4'q 0 •
�
YPe X fixecode9YPsurn boards otherwise
indicated .
. -- - ��u�"�ae manufa�tur�er's standard metal trim
ac�ess�ries, c�� ��e beaded typein point compound e��ept whes�l�h face flanges for concealment
��ndieated. Provide corner bads,, � � inishing or exPc�sed. tis
L-kerf --ty� edge trim- � Yi�e edge trim beads special
g beads and one piece Contrv�. beadst
TApe ASTM � 475, perf orated .
J
at ASTM C 475 of the readpre arfor condition and application,� p ed typ� suitable
T 3 - EXECUTTOld
9YPSUM boardsnUMber n -F in lenaths ani �;
--� =:lu points .Ins--- �.,� �.��, �cti�or�s which wig Z m�r�i�i ze
vertical , withjoints ta�.1 w���s �„rith exposed �L _ - af����- ,.�. -_- -
Isola
J-triM A nri 0
__w.....:.� ��� vAP'vsit� s.�d�?� nfT r,�.�.k'�`�'us rava�'�ts
-ce gr ail word from abutting Wit,- 4.,.___
M
r i 0
-L. " L -i -ons 0
n9 �k. UX -d' wa,rwerrywall meets macn„.._ Provide ., met
------�-,..� «. I wall
e
�i&ALA & App'i� �c�int to
9YPISUM boardss
. ;�gplY compoundiri � c�mpvund at joints betwe
f langes, penetrations, fastener heads d3Gated be -low at acre en
and surface clef ects , scary
Install CaMpvund ill 3 coats (Plus,rhy manufacturer): sand between c�� f ill of cracks if rec�mme
and after last coat. nded
11D OF SECTION 09250
SECTION 09300- TILE
=GEN
Extent of tile work inch udes , but
1siirnited to the followinge
Porcela�n ceramic the floor-IncStandarc��140rtar
o� the and grain materials end
American Nat��mal Standards Ips anstal�.atiar�
SPecif icatiolj �or Ceram' c Tile �i lute � tandarc�s
exc�p� a� other s e ir�d 6-1C
ca SNS T A-13-7 , � � �i I � ani standard
ted.�P y tO the work,
roved
Pgr
with.
CTS
Pre
American olean
crossville
dal -Tile
Florida,
Monarc!h
S = Provide file from ani of
tie 0.110W
ing�
�q^ramic Ti
the follow 0in Pr'vrements°ide
g r�q��.;
square -edged fiat the complying
Wear
ing surface : Non-*-skl[d,
Nominal face dimensions; 8,v � all
Face: Matte.
Ce
ar..t a . r
�Cfleava, e Membra
D 226, Type I .
ANSI A108,1,
materials anc� installativn,
Asphalt saturated felt,
15-1b. type, ASTM
Reinf orci r Wire Fabric,
2" -- wo. 3 � y�a.3 Galvanised welded, wire fabric 21t
ASTMA 185 andASTMa 6 AgW gage Or OeO62511 dam. ,� ' �
2 except for m�. n imu�m wire size,
P1 Y with
BXXVandimei Meal Lath :Provicle
ASTM C � 4 � diaMond me�� ���h ,��m � in
1 galvanized, 3.4 lbso Baer sq, ft. pY g with
Atex -Portland C,�� 401
� Mortar: A�r1'SI AILStix incorporati�zgc ry poi18 4m.4
prepackaged drymar
witi� water added a� �'�r additive in r�mu�si�i��i�, pvw
addi�ive. job sate. ManufacturerIs �ta�dard �vrm
_ latex
+Lia ex - ort and Cement
as a replacement for ANs i A
site to dart or al 1 af
Ar�packaaed dry _
118*6,-0
latex additive s�x-ving
-- requirementy,� amu. �. m1K W.�.tgaugIna
type w3t�z' � �.dt��d at
co�np�.ying with s indicatof latex and dry���
d �e�c�w.
LateX type ;
Grout type:
Elastom
hint s
reszsta:
[C
=#auuracturerls St x-�,
(f loor) rnvdi f ie PDXY grOUt ANSI
108.& 8!
ubstrates , t : M
anufacturer rs
�'0Ior to much standard
nt silicor�e seala�,�. grout in tile.
X X B -C rrr
cvmpatible
One
-,-Part Mi .dew
�CX UJ -0n � COMPlY with ANSI A108 . � and 108.4as aFplzc�.�l� for t�p� cif t�.1e, s�through A108 .
methods 4f anstallat�,on indi�at�d tt�.ng ma�erlaIs.groutinstru�ctic�ns for a�Plication ofproprietary�a��"�y wi-�n menuctur�r%�s
-moa+��.�
u'oint Matte n;
otherwise indicated. Ugrid pattern
ganincT anci
With
wide JointsI unless
ANsI standard fortpeD
4 n: Clean the ire accOr�d�n+ce �it� �
man�.f aCturer' s instructions.
Of ti 1e and �eghod o f in�,� PP11
cable
heav APDJY ��I3ation used and
� protective covering -�o prevent sup. draft paper
dace d .
w -L o-cner
P�
END OF SECTION 09300
SECTTn'itj 019900 _
RARLT�NG
PART GEN
Desc i tion of W
ork: Paint
surfaces including but not 3
exposed
�
Interaor
St ained
ng of interior and exterior items and
imI'r`ted to;
9YPsum board walls and ce2inqs,
and exterior �-
or s�eeiwok .
woodwork .
wcorl< Not nclude Shop PrIMing ❑f ferrous
fabrcated components are Included under their metal. i�en�s ana
Finished raetals such as anodized a respeetive trades,
and similar meals wi�I nvt �� Iuminum stainless steed.. bronze,
parts of operating t��.its, ar � painteds � Do not p►a�znt an moving
performance rate �� any equipment identificatian�
4. name places or code-rP��4 r�,4 , _� _ .. ►
Pr0tPnt19-,,n 0 Protect
related damages by cl
F-� T 2
+ Provide the followin
� Ferrous Metal:
101
work Of other trades .
eanin�3. repa�.ring or repZacing Correct any
•
painting
q paint systems for the variostrates,
a t: Exterior Fe-rrous fetal pri�er SFS TT-Pow
Primer is not required on items dejou 86 }
erect shop primed.
Pittsburgh; 64�20S metal primer.
P & L�40
k-;-J4Ub Metal Pri.
Fullers 621*hm04
me st Metal Primer,
Fist & Second Coats:
Semi_910ss Alkyname
i
P ttSburcth: 6--9 o SPeed�ide Lo"o-she
P & L: vitrallte Eggshell �n Enamel,
FulZer: ., Enamel
P A.Dr al1
first
ittsbu''I''rgh:
P & L:
S W
Fuller
�.uo--amu semi --gloss Ename.1 .
stems:
(FS TT -E-509),
lnzerlor lateX Basi pr*mer Coat (pS
6 - 2 PPS Qui��-I��'�ir1g Interior
Seder.
Pro----H-I*de PILUS, Latex Primer,
Sft-W Pro -mar �,ate� Primer.
220-22 FSA Sealer..
TT-rwP--w650),
Latex primer
..
se gpna
Enamel
Pittsb
P & L:
S -w:
{FS
urgh:
Fuller,,10
ted
- woodw
Stagy�CCo�a �t
PiLtts
burgh,
P & O
S
Fuller,
Third Coats•
TT--.]E-P-509) Oderless Interior Semi -Gloss Alkyd
, —
27-109 Wall -Hide Semi -gloss Enamel.
Prom -Hide Plus Alkyd Semi -gloss.
s -W Pro -Mar Alkyd Se
206-10mi-gloss enamelSemi-gloss Enamel.
r
Interior O1` 1 Stain (YS TT -S-731 } .
77-3C32 Rez Medium Tint base.
S -Series Tonet�.c Wood Stain.
S---k-W OiI Stain.
640 -XX Penchrome Slain,
�.rst and SA,,,
Pittsburgh:�V
P & Le
S
Fuller
em
011
lu IL -;oats : tai 1 Rubbing Varnish (PS TT -.,.V-..86.
77o-7 rez Satin Vn1ar )
61 Clean Finish Tarnish.
Sq' -W Oil Base Varn-
65004Ws�x Gloss.
01 satin In varnish.
-- --- `" �` � � L � � an : Perform preparation and cleaning
n str�ict accordance with coat; �,� �.�r,z.�_ _s
�Gh substrate Condition.
Materia Pre arat�.��n:
finishing material-��
s in
{
lic ti.0n: A
w�.th �aanufacture�r►�
best suited for maty
mix, pre
accordance
painting and
di rections
dc�urer's ins-�ructions�for
parte � and store pal* ntin
with manufacturer's directg iorlsand
r
finishing materi als inUse accordance
-- � ana surfaces to wha�ars, and tecnniques
--���j u��.� L.�onai coats when undercoats
show through f inaZ paint coat unt
finishr color and a 1 1
�pearance.
- ••-.�.... aYYliecl.
stars
4
palnt
car other conditions
f ilm. iSof u��form
faint surfaces behind p�����e��� fiis insta3led. Yxed ec�uipment before
Saner light.1�r be-�ween sucGeedir�g enamel coa��,
END OF SECTION 099()o
equipment
LAI �1 � 0 �,
SPECIFICATIONS
DIVISION 15 - MECHANICAL
DESCRWrION
15000 GENERAL MECHANICAL REQUIREMENTS
15200 SEISMIC CONTROL
15250 MECHANICAL INSULATION
15350 PLUMBING SYSTEMS AND EQUIPM]ENT
15800 HEATING, VENTILA4NGANDAIRCONDTTIOIVING/AIR DISTRIBUTION
25900 MECHANICAL CONTROL SYSTEMS
15995 SYSTEM COMMISSIONING, TESTING AND JBALANCING
DIVISION 1
M
MECHANICAL
Section I5000 - General
dart 1 -general Conditians
The mechanical work described ill thIS dIVISIOn COMprises
This Contractor shall be famil"ar urith the work of other trade's
a part of the total project,
them throughvu� the project. In particular, this Divisiontrades and shall coordinate with
and pravision of the Gene�-a.i Canditions, Su lemenW 1s subject to the .requirements
general Conditions and Special
Conditions, and they comprise a part of the work of this Division.
This Division does not define!,
described herein as a part of the
nor is it limited by, trade junsdicttons. All work
General Contract and is required of the Contractor
Part 2 - S�c� of Werk
AIS work defined in the mechanical
specifications, and an the m
be Performed by this COntractor at no additional cost tv tN mechanical drawings shall
structural, electrical, ands � 01 ner. Architectural
they define �nterrelat�ed ��ia�. drawings and spec�.fcations are a part. of this work as
emends of nanous systems aErld, �n instances? nay govern
locafions, arrangements, utility,services, size, etc.
Pat- 3 -fades
The .mechanical work shall be performed �n strict actor
provis*lc�ns of the various cads, ordinances and adv dance 9
wxth the applicable
location in effect on the date of �nv�tations for bids. � °ns PerWiftffig to the project
to comply withrules regu�a�i4ns and ordinances shall beprovided.�rials and labar necessa�yand/or speci�catians indicate material Where the drawings
s or con �n excess of cede requirements,
the drawings and/or spec2f ca.tions shall govern. The Contractor Owner and archi�ectlengineer free harmless from l�abilshall hold and save the
from his failure to comply with des and ordinances.
�' o� any nature or kind arising
s.
Reference Standa.d�:
Uniform Mechanical Code/State Code
Uniform Building Code/State Code
SMACNA Duct Design Standards
Locally enforced NFPA Codes
i.ocat Power Utility Regulations
Par -t 4 - Examination of Site
Examination of the site shall be made bv the. Cnnfrn tn,...,�
uliiwin and� �ca�xons ands � ---- ,, wl�v shall Cvmpar'e �t with the
sa�sfy hlmself as to the, con -10.0 under
il to be performed. He shall at S ch #�me ascertain which the work
9 ve-rifv-, aehef*irnii r -x A -VI,
r --- ��wrv�w K1J. LI,1" UVI1N
which may affect his work.
Verify final locations for rough -ins with f
of the actual�uzpment to be connected.
Ids measurements and with the requirements
Mechanical............... ....
Instatlat�ons: CoOrdinatpk m .
with other buildir�g componphents. apical eaqUipment and matenajs installation
Verify all dimensions by field measurements.
Arrange for chase, s1ots, and openings inn Othermecharuc� �nstal�at�ans, build�ng components to mow for
Coordinate the installation of required su ri�n in
concrete, and other s�ciural. componen�PPa g devices and sleeves to be set poured
s,, as they are constructed.
Sequence, coordinate, and integrate instailations o
for efficient flow of the word. Giv� f mechan�..ca.1 rnaten�l.s an t equiprr�ent
POSitioning prior to cl�sing-zn the buildmg.pa�icular at€en�on to Iarge equipment r uirin requiring
Coordinate the cuffing and patching of buildingcoof mechanl+cai equipment and materi.�s. '�P�"n�n�s to accarnmodare mstallation
Where mounting heights are not der,ai.l�d ox dimensioned,.overhead equipment to provide the maximum headroom mechanical s, and
possible.
IRstall mechanical equipment to facilitate m
equipment components. As much � alntenance and repair or replacement of
disconnmting, wit�-i minimum of interfer�nceraetical, connect equipment for ease of
with Other MsWlation&
Coordinate the installation of Mechanical rn
suspens'vn system, �ighi fixtures, and other installations.nais and equipment above ceilings with
C00rdinate connection of mechanical systems '
u���es and services. COMPIY with r y with exten�vr underground and overhead
service campan��,�, and con�-o�lin� a�ujrem�entn-T�s_f.guveming regulativns,
service.
Part 5 - Accessibill-
a
-rrovYc�e requred connection
franchised
for each-
burvicing
and maintenance. `u"� `I'a�enats is prOvlde required access for
devices r u Coordinate the final loca�ic�n of concealed
e4 �ng access with final Iof r Pired�qu�pmeni and
ample space for removal of a�1 '�access panels and dvozs. Allow
Parts that require replacement a� ��Niczn
Establish required 1P ?an g
� � � Mstallation features involvmg O -ration
and
3
mantenance. Respect manufacturers recammen
da�ion s for access alld HCl
Access Doors -General:
adjustment, main.tenanee � All items of mechanical
�quipmeni which r�aay require
eplacem�nt ar which control a system fu
read�ty accessible to personnel operatin the nG�on sham be made
g building.
1. Provide access doors In all d c
rk �� requ�-� to ma�.ntain firs d�.mp�rs
�uYp��nt, controls or other elements of th, �
to SMACNA standard unless otherwise detafledY�tem. I�wrs sh� cvnformor specrfied-
�• Provide access doors in ceili�.
ductwork r � lo dampers, etc., and to access dovors �n
���ng the Same. Access doors sham b� a1 -
equivalent to "M�lcar" by Inland R�e, ran � an -steel cOTs#ruc�vn
Ow"er's Representative. Doors shall be �4'�n a ���e app�°�'� b
y the
screwdriver latchesDoors in 1 hr ceilin � � ��", o� as need with
g shall be. s� rated.
Subm�itW�5: Subm-0�tal of shop drawin s
from the Contractor.Datag � Product data, and samp��s will be accepted o
submitted from subcaniraetors and m P only
to the Architmt/Engineer will not be processed. aterial suppliers directstransmiita.1 and shad. s� and s�� rheu� The Contractar shall document each
's in compliance with the cnt�ria of theproject
J� indIcating that it has ben reviewed
, any exceptions be clearly nvted. �d
Pari 6 - Guarantee
The folio
Wing guarantee is apart ofthi's of the Contractor: sp�if cation and sha11 be bid'n o
"The Contractorguaranteesg n the part
that Ns �nstalla�.on is free from m 0
agrees tO replace or repato the satisfactionth�h�ca.l defects. He
Of this i"St;fflafton which may fail or bed°f eowners s al
a,n,
Year after final acceptance. e�erm�ned unacceptable wi�hZn aPleriod y' of one
Failed equipment in the repair or re 1a
the date of recomm�ssivn. P Cement shall be guaranteed dor one fug. ear frYom
Provide complete warranty xnfOrma�on
tO incl ude data of b�g��n�ng o f �, for each item to include produc� or
names, addresses, and telephone numbers or band; dura#xon of �,�.� equipment
ty or bond;�'�tY �nices. hers a.nd pr,�ures for f�Iing a cl�rn and
and obtaining
Mechanical systems and equipment sha�� n
in�.t�atian of �, of be considered for subst.�.nia.� cvrr�ple�Qn an
malfunction for a� �� un�.1 they haute performed Zn ���-�,,� �
t ten (10) worlang days_ ce al
without
Part 7 -Record Drawin s
During the course of construction the
Mechanical. contractar hallmaintam a
set of
El
drawings upon which all deviations from the original �a out are r
marked -up prinks shall be turned over to, the Architect/0
Enginne_,r nt t�,� recorded �� These
work. Yf the Contractor fails to mark ug
Architect/Engmeer for time required to do so.
tion
Nrn..;ao �
laLlnt—en--an-c.,eManual for M
_--� •mss. wav vv114.11.1J�.'VI1 Ul [j]e
the prints, he shad reimburse the
1 � � l�'anuais cc�n#aining descriPti've
ica� S smanufactured iter�. Literature shall (Manufacturer's cat�.og dad.} of each
show capacY�es and size of equipment used and be
M arked indicating each specific item with applicable data underlined. n
and pump curves where applicable, wed. Include fan curves
Provide operating Instrtictivns for each mechanical s ste
f'11' '.r� Putting each Piece of mechanical equ� ment into m7 step by step qk procedure to
control d,ag�nns for each separate system. Popera�ian. Provide schematic
Provide maintenance instructions for each piece of mechanical
PrOJect. Instructions shall include name of amend �u�Fment installed on the
numbers and lists, maintenance and lubrication instructions, installation instructions, darts
truct�ons.
Include with the manual air b.11I.alanee and test run reports
of a1.1 test reports.� wn�en v�arran�.es3 and copies
Tests andQudLS't'i'0--n's:
Make all tests r wired b
of a representatiWe of the Owner, recorded Y jade or speci�ca�on in the presence
Representative. Involve joc� authorities whey �� certified by the Contractor and
e required.
Permits Fees Licenses: Pay for all permiis, fees and
Of the specified work and be responsible fir �� Incenses required for the conduct
Comply with requirements for inspection,cntena assvciatec� with the same.
certifications, �t,�.
It
aterials and u� rr�ent:
nu
NuTment and tnaterials shall be nPw
lim ue
11�dluTactur+ers regularly engaged in the product'On vf1plumbin� heating5 standard praducts of
air conditioning equipment , and shall be the m g' Ventilating and
equipment shown in schedules on drawzn s � ��fac�trer's latest deszgn• Spec*flc
Contractor's bid.. Pra�v��i4ns far substitute specified
hereln is to be the basis for the
Conditions. All materials shall be PrOduced bv equipment are out1iried in the general
United States of America, manufacturing plants located in the
Furnish and install all mai
the drawings complete wii all ntl :ir
or items of
N"T'nent specified in the,equiPment schedules on
th all accessories no 211' cT.,,�,�:�.4
and
Q��,sunes nec�essar�,r for a co
Protection of�M�a
ials and ui menta
5
--auFYlA� wIr� catalog items fisted,
mplete and satisfactory installation.
Close duct openings with caps or plugs to prevent lodgement o� dirt Or trash dufing the
course of installation. Cover equipment tightly and protect against dirt, water and
chemical or mechanical injury, Make damage and defects developing before acceptance
of the work good at Contractor's expense.
Do not make teml)orary use of projixt ucanseni of the C7wneT. Such use v� � iPment during the construc�on without the
en represents a substantial nerc���ag� �,� t�,s
expectancy of xhe duce or systems.
jol)site
clicanuD:
Keep site clean during progress of work.
At the conclusion of work, clean all instal.Iation thor oug9
hly.0
IV.-, 11110
Leave equipment rn a factory dock condition. COrreCtor repaxnt if necess�,,, any damage and 0 C up
Remove all debris from site,
Canvey useful excessm��eria1 to Owner.
Section I5200 -Seasmic �o�ntroj
Part— GQeeral
Related Documents: Drawings and generalp,.,1.S10"SSupplementc� of Contract, including General and
Conditions and D'VIS1011-1 Sp��f,��an sec ' seciian.favus, appy to work of tills
Des
cr1bion of Work; Furnish and insto corn .
1ns#a1led under Division I5. Work isbeplate seismic resent systems for all worlr
Cede, latest edition, for the res responsive to the intent of the Uniform Buildingpect�ve seismic zone.
AISO tv include retrof t seismic restraint of all sting .
u�s�al�ai�vn rebated to the central heatig and n�g equYpmeni, PlPing and meci�anicai
Pre-bid walk-through, cooling plant. Verify extend of work dunng
uali Assurance:
1 • Codes and Standards:
Uniform Building Code
NFPA bulletin 90A, 1991 Edition
UL Standard 181 1991 Edition
0
0
se'sMic ReStraint Manual G
Air conditioning Contracty
1991.
Section I5250 Mechanznsulati
on
Part 1 - General
extent _ of mechanical insul2tinn
uidelines far Mechanicai systms Shiwa+s Na�.vn,al Aq�.���t:,.,. e, _ Xfeta, ar�d
"" l�intC:NA) First Edition
sct��u�esand by � __w�.` 1�"jICu vy tris section is ind�cated an drawm-gs and
equiren�ents of this secti.vn, Use no asbestos 't1lis
restora�zons of insuiatians of pr�vivus wank_ rr� hP ,,,,f�,� _ � Wark, Include
Part --eructs
--� --- y., il�ml waw through.
�'•Uua un as manufactured bya��s��-Bacon � owens.Com-
CerWilteedng Fiberglass., PPG, PM11.0. � oh-ns-Manv�Ile, Ar�nst�-ong, or Knauf, u i�' Carey,
A11. insula�on material shall have a cflm(insulation
equal to the, foilow�n
smoke hazard �,�n not ex I�sYte s jacket and adhesive) fire and
DeveJOPed� ceed�ng: Fla;�e Spread - Z5; Fuel Contr�.bu ' - 50. AZA accessories and material used for�°n - 5�; Smoke
shall have same ratings.
Duct Insulation: Ai]. ducts handl-
lined,
ng condition shall be �nsu�ated with fiberp-rinizv, u,;��, � or outside air, except those acvu�t�calr�
Ift
thickness faced with
�angxtudinal points sh
sealed with adhesive
additional coating of
u��ISl� t]� 4I1L'Pound
-------_J
.
002" thick reinforced aluminum foil va per cubic fao�, I "
all b� butted �rm�y with vapor barrier I*N-.,pedP°r barner. All end and
W 0
Adhesive shall. be ap�plied under theI a muumurn of 2": and
U seal. adhesive shall be applied ap. If staples are used, an
PP over the staples.
1LYU suiation: Insulate the domestic hod and cold water lines '
fiber glass insulation with all service '�.th 1 " thick preformed
Jacket.
Pari 3 - Execution
In stall in�u�ati.on per manufacturers recomm�
shall be installed in a workman like manner ndafiians. Fittingsinsulation faints etc*
the satisfaction of the. n�A�- �� P�A' manufacturer's recommpririn+y�..,�_
A 1,535
P�umhzn S nems and ui mend
Part I -General
Extent of Plumbing work is shown onplans* The materials anti labor required for the 'bas descTibed, wo0z
Ymplied or required to finish the entire work.
k shall include furnishing of all
togetherwith all malar it S
standqLds-
Plumbing inst9lation shall be made inccPlumbing Code and aI1 other appIicablegovernin ��rdSrlCe With the
� DtieS.
In event drawings vi�,lntp tj,a -
latest Utah State
-�_6i1C.+ .,�Ga, ane contractor shall base his estimate on tie code
requirements.
uali ASSUMqe:
lyx�nr�x�cturer's �alz�ea�vns; Firms regularl �n
'
PIPling Products and equip�nent oftvws rnat�. ���� in the manufac#ure of p�umbin
have been in service for not Tess enals, and sizes requ�.red v�,h g
than five years. � whose products
11'st0ler"� t�ali �icahons: FirM with at ie�as on pro3ecis of snature. t three years h-
Imilarstory of successful ex
Perience
Licensed as a firm in the Contractor s
take of origin and in the State of Ifiah.
Have a publicly registers bondin capacity
' alI other work �n progress bY tie Contmctor, of sufficient amount tv saver ihi.s work and
All workmen emplOyed on the&pro�t
appren�ce pipe fitters with add��on�.I cert�fcafi�� state licenses as 30urneYman or
Tests: Conduct in the presence of Owner
(letter form) of all tens to the Architect.tect,
wumers d26
's represen�a�.We. FOrward a written re
po
WASTE, DRAIN AND VENT SYSTEMS (NON -PRESSURIZED): Sara
vent, shall be tested by plugging all outlets and filling the lines with water to the highest
opening, but not less than 10 feet. soil an
Domestic wader systems shall Fust be air
pressure source and testjoints with soap stested to a pressure of 150 psi, then remove
a pressure drop not tO exceed 5 solution Dc�rnestic water systems shall slaw
Then F111 with water to thes Psi in a twenty -dour hour xriod� with no visible ane pressure and check for visible leaks.,'K: leak,.
DEFEC'I'�� WopIf ins '
or material shall be replaced or coin yr test shows defects or leaks,, such defect4 a
tv pip�g sha1� be mlde w�th r�ew mae�� `fid insnp-r-tirtn .�.,.� �_ _� _ve work
be acceptable, na.�s.
Part— 2 - Products—
-�-Y.,�.,;� ��� LUsrs repeater, All repairs
No caulking ref screwed joints or holes wig
1
t ra s: Foch fixture and appliance installed in the �v
sealer d ra�.nage lines shall have a s tMp vrk and discharging water into thesystemand sv installed ihat �1 arranged In Gonnec�on with complete venting
pressure or syphon condition on the shall pass freely �a the atmosphere, with no
afar seal,
Me...n.ts.* The entire system sha11 be AL t�per� vented to back -vented on the discharge side of the syafe wat�ro at���osphere. Each fixfure shall be
seal and arranged for free passage
Of all gases to atmosphere.
Plumbj,ng fixtures; This cvn#:rracor shall1h
Tecified hereinafter ad make aid.parts �rnIsh and instal.1 �.I1 f�.xtures shown �►r
wor�ar� order. complete and lave the �n�ire system in perfect
� He shall clean and adjust a1I fixiures beforedamaged or crackers fzx�ures sha�1 b� r� �a leavinLy the job. any
p ced at the contractor s expense.
The fixtures shall be �I new and complete as shown
for the work, including accessible loose ke Y�� or described in cata�ag or required
9
tO all fixtures, and cast brass P -trap, unless o�heFw� �sszvn stops above fla�or in supplies
be chrome p�a#,�,d, and all tarn shaxl match deli � shown. Trim for all ftxtures shad
100se key st°F$ �d rigid chrome sup Ties. Provide��. heavy
All fixtures shall be provided with
fixtures. P duty hangers at all waif hung
Specialties shall be ZUrTJ, Wade, Jo Mor J.R. Smith.
oil
.
and fittings with 1 0 W
n Waste annd Vent 1)
ininor: serVice weight hub a.nd
ead--caulked or TY.Se"12a
Joints. Vlgot cast iron pipe
S
eTvIce weight 'tNo-Hub" cast iron PiPe and fittings steel screw bands (above ground only), with neoprene gaskets and sta.inl�ss
Eip,e:
connec
Schedule 40 galvan%zed Or
type ions of dissimilar metals.UsdomesticdoesticL hard drawn coPp�r. Use dielectric fittin
madepY gs at
Ae only.
i a�Pi
:
requirements,
PoIY h Y1 pipe with continuous tracing wire per Mn duel
Fart 3 - Execution
PrOtection's Use all means neves
after installation and toVr0tJ!nLJ1%i the to protect plumbing materials before dunng,andsteed work and ma%rials of ali other
RM,la(.,ement. In the event of grades.
neves damage, Ymmediately made all repairs and
�'y to the approval of the []weer and at no additi��p�acemer�ts
onal ca��
tO the Owner-
-W
Excavaand backfi���n The m-po h'
trenching and backfilling for his under cui cal Contractor shy]
underground Plping., Bottoms,�P� hardand for qnil and waste. nen; �, a vt%^ r L
* 0
provide excavatiQn
- , r-�-...� a.��= �C �ra�aecf to sec��- of trenches shal.I h,'
�� ���, untess otherwise noted.Belle uniform fall of 114,.
holes for sever pipes shah be excavated
P'Pe wili rest on solid ground dor its en for
ted so that
length.
After Pipe lines have been tested, inspected Pror toLbackfilling, the ex pee
cava�on � and approved by the Owner,,s Ins
materials cleaned free of trash. be c1�an� o� all kinds of ruhhi �h �„ ��r,and
61
4
��eanin U Prior tO acceptance of the buildingof the pluming installationremoving a.�� babel ' thOroughly dean all exposed porti.�vr�s
only cleaning solution approved by the man$ and a� graces of foreign substanees, using
careful to avoid a�� damage to finished surfaces ufaci�xrer of the plumbing item ar�d bel*n.daces�
Se.ction 1
M d I
Part - Gene,rn1
Venin
do and Air Condid
a Dis
..
�A fl.T mechanical work jS shown on drawings,
Wrtrti-tv.,
Rbn
.. �l�•f��lb1uP snail be the bestqualifu acceptable ineveryres fi
ts kind for th� respective trades and �hal� be
pect to the vwn�er.
Pari 2 - Products
Sheet meia:� shah be galvanized, of specifiedgaand impex�ect�y galvanY.zed spots, �� and free from blister,slivers, plts,
Duetwork Shall be eonstruc�ed in accordance with
the apprvpna% SmACNA manual.
Rectangular ductwor-i, shall b
e constructed of galvanizedcorners seams. All seams shal.l be hammered and made axr�ght.
Round ductwork or equivalent spiral loci
Inc. of Salt cvns�uct�on as �nanufac�ur�ed by N-Leco
Lake City, Sh�� metal Products Co. of El Paso
Co. of Westerville41 0, Ohio* or Lewis and r am�,p� tr_ .�. Texas; Unified Sheet MeW
L1� uuc-I suppler and shah �e zinc-c�a��.� �fmil L; ,,; c��Ule. riti�n
S" in diameter shall be
Underground duct. shall be
----•.��•..s, 43 .4 dli WP_I�f]Prf
igs shall be furnished by
26 gauge, 9" through 22" diameter shall be gk;uO". sthrough
a
PVQ.
Ducts�i � The jOInts and seams of all suP.,I
per SMACNA r y ductwork are to be sealed. Seal ducts
requirements. Ducts upstream of air values are to m
ducts downstreaim of 3air values are tO meetsC1S�. Oil harms�class C. M�Eetseal class B and
be Duro-Dyne S-2, � EC -754 or Hardastic sealing compounds to
n...,.,..___
%-u,�111xyunas are not to be used.
U11JI11�anes: Turning vanes shall be ins�.Iled in all be single thz�c�ness with a ��'e eZbvws. The vanes shall
��ing edge. Defer to SMACNA HVAC duct
tables and charts 1981-Th'Td Ec�16on p . �.6�. system design
u tv 25" deep � Use the dxmenszons under No. T far dus
p and dimensions under moo. 3 for ducts Quer 2
of turning vanes wild not be, accepted. 4 deep. Note: other types,
P91q N
3 � Eecutivn
A11 work to be perfo,.Me in accQrdan
ce with aiD cedes..
Instal, equiPment where indicated, in acc
ordance with manufacturer's mstallation
10
.0
instructions. coordinate with other work
electr�icai. , YncludIng wall and ceiling construction and
At the cvmp1eftan of the mechanic�. inst.�.Ia�i
operation to the °�, the nanous systems shy be piac� in
satisfac�ivn of the Owner.
t ion, 159
Mechanical Control System
Rooff-Part I - General
Extent of control work as shown on
tOPut dra�vzngs, plus aII electrical control r�i�n requipment into opera�.on. g squired
Section 15995"'I Comm�ss�vni
Part
System COMMIC0,
Te S ti nananrin
SMMF, testing and balancing of the meehar�.iea� s s�
the responsibility of the Mechanical Y ems shaI1 be
contractor and his sbconirac�ors with Participation of the Electrical C011tractor rebated the
Contractor related to genera. canstrucriaitems.6 �o elec�ricat work ar�d the Genera
5 stem Cammiss�onirt�:
1 • The contractor shall
systems installed �d �clpate zn the s�rtup and shakedown of
mod�f�ed �n th's contract; fest adjust � all
mechanical
systems to obtain ap�.mum performance submit level
J d balance these
reburied energy �n�ut, prepare and sub �t a which m7nimizes the
the fined system eand'i�on obtainedparficipate
� c�mple�e report of work lane and
NrsOnnel ;n the proper operation ofJs� �� instruction of Ownerl S
ystems and equiprr�ent.
� • Balancing shall be done b an independent defin%�on Qf independent ys� fm specializing in th*s work
shall mean the firm is nab associated �,►� ,, A
engineering, contractor, o� manufacturing firm th an���g� �'��u�� �� �ba�aneing mechani g �� d�v� �ts come solely from
work are R & S Balancing, Salt Like
cal systems. ApP�-vved fjrms to do this
y, Utah and Barrett, Inc., Payson, Utah.
3. After a�1 ad�justments are m,�ddetailAaA
submit for apprvva,�., anile a w"tten re�rt shall. be prepared
shall bear the signature of the profess,
on�d
supervis;ng the wnrk. Final acceptance of thisPrOJect'ad
satisfactory report is received. �ur�ish four � w�� not be made until a
copies of the rep�rt.
I I
BASIC MATERIALS rse METHODS
PART 1AL
Section 16050
Des�ri tion
The General Conditions
Alternates, Addenda,APPlicable
SuPP111em�nta�-y General COnditians
SPecifications shall Drawings and the
f Tecjjn i ca 1
ply to X11 work under this Divi sia
It is understood n'
govern and be the direct the electrical specification
shall cvm�►ly With -the s ec ��ponsibi li-�y of the ContractorSha 1 Z
to describe and p l��catlons and accamPanying � who
installing,provide for thefurno drawings
testis shingr, delivering,
suc��ssful v g• a�� placi�� In satlsfactor
p�ration all equ2pment, materia�.� Y and
i necessary appurtenances tv provide devices, axed
systeirr for Iightinc�� power , a. completes electrical
such other e a�� auxal3aries; together with
ipm�nt and devices furbished and in
other contracts, which shall be wire stalled under
contract. � grid connected under this
Stat, Licensed Contractor
AIS- contractors
current state cor�tracting license
� mua.sh have .§-9�oe
The work covered bylabor these dvcumeflts consists of f urni
tO fill the int materials� �q�lpment, supervision ashing all
��t and ,puPose of the electrical wo service necessary
the drawings and here'naf ter �
either the drawings car specif ' ��eifiec�. It�m� v fitted rk shown
on
in the other and/ate all items 1�a� ions, but shown or descr16b(,m,-o4��om
s�rsten complete and wor�ablenshassar
Y to make the electrical
part of the work. �-1 be understood t�
Farm a
Materials and Workmanshi
All materials and e
Of qual'PtYi nQw qul�m�nt furn'shed and installed
UL,r NFPA , and meet the standards shall be
U$C, U�QSH� NEC, drid Sha11 be�.�' the ����IPCF.A, � L5
star�dards have1�' label where
available, been established and
ver
mai�ufarvt�,,....� ;ere materials and a; _ laJ�el sez`vice
_�..�� �L- - s nametype
�_"` ��,�are _ _ _ .�,�
denoted. the and qua'�Lpment
I itySl�ecif ied by
The Arcbitect shall be required is thereby
deemed necessarya
apparatus been to inspect and every f acility►
g Installed �o exam the materials and
competency of work�€nar�ship, drove their qua, it
Y. skill and
Re9q1At!9aE..--4nd
In the installation
requirements of the
Pets
Of this work, comply in every wa
laws, ordinances and rules with theo� �
the state
1605p,/1
and National Board of Fire 'Underwriters, the National
electrical Code and the rules and regulations of local
ordinances.
if a conf liCt occurs between these rules and the documents r
the rules are to govern . The contractor accepts this
responsibi-lity upon submitting his bid, and no extra charge
will be allowed after the electrical contract is awarded.
This shall not be construed as relieving the Contractor from
complying with any requirements of the pians or specifications
which may be in excess of requirements of the herein mentioned
rules and not contrary to same. All materials and equipment
installed, including lighting fixtures, shall have been tested
and approved by Underwriters Laboratory and shall be so
labeled unless otherwise approved by the architect.
obtain all Perm its, inspections, etc. , required key eoc�e• All
fees shall be included in the contract price. The Contractor
shall furnish a certificate of approval to the Architect from
the Inspection Authority at the completion of the wvrk.
DrawaL.ngs
Architectural and Mechanical Documents are considered a part
of the electrical documents insofar as they apply, as if
referred to in full.
Since the drawings of floor and ceiling installation are made
at small scale; outlets, devises, equipment, etc., are
indicated only in their approximate location, unless
dimensioned. Locate outlets and apparatus symmetrically on
floors, walls and ceilings where not dimensioned, and
coordinate such locations with work of ether trades 'to prevent
interferences. All dimensions on the job shall be verified.
Da not scale the electrical drawings, but refer to the
architectural and mechanical drawings for dimensions.
upon completion of the installation, furnish a set of "Record"
drawings to the Architect, clearly marked with the changes
authorized during construction.
Storage and Protection of Materials.
Provide storage space for storage of materials and apparatus
and assume complete responsibility for all losses due to any
cause whatsoever. In no case shall storage interferes with
traffic conditions in any public thoroughfare or constitute a
hazard to persons in the vicinity. Protect completed work,
work under way, and apparatus against loss or damage.
Shop Draw i
Shap or detdil drawings shall be submitted in quadruple to the
Architect prior to installation of any equipment when shop
drawings are required as hereinafter specified.. Contractor
16050/2
shall prepare and submit any detail drawings at any time such
.9
arawings are deemed necessary by the Architect and shall
obtain written approval of sane before proceeding with the
installation of the work.
Shad drawings shall be submitted in properly bound and indexed
brochures. Lighting fixture brochures index shall include: a
front sheet listing fixture type numbers, manufacturer and
catalog numbers and special features not normally included as
standard, separate sheet shall be included for each fixture
type. Brochures shall be labeled as to the identity of the
jab and shall bear the signed approval stamp of the sub-
cantractor,
Repair of Ex istinWork
The work shall be carefully laid out in advance and where
cutting, channeling, chasing or drilling of floors,, walls,
partitions, ceiling, or other surfaces is necessary for the
proper installation, support, �r anchorage of the conduit
raceways
or other electrical word, this work IN a
carefully done, and any damage to building,
equipment shall be repaired by skilled mechanics
involved at no additional cost to the owner.
Excavation and Backf ill in
sha 11 he
piping, or
of the trades
Tia all excavating required ft�r installation of any and all
parts of the work. Perform excavation in a manner to protect
walls, footings, and tether structural members front be ing
disturbed or damaged in any way.
Inside and outside excavation shall be in 6 -inch layers,
compacted to 95% of the "Standard Protector Test"..
Eauipment Cnectiv_ns
Provide the materials and make the electrical connections to
all equipment hamming electrical requirements as indicated in
the Architectural and/or Mechanical section of the
specificatir�ns and drawings.
Pry rens and Coordination of Werk
The electrical wrar}� shall be laid out in advance of
construct�an to eliminate unnecessary c�ttting,drilling,
channeling, etc. Where such cutting and drilling, or,
channeling becomes necessary for proper installation; perform
with care, use skilled mechanics of the trades involved
repair damage to bu*ld*ng and equipment at no additional cast
to the owner . Cutting work of other trades shall be done only
with the consent of the General Contractor. Cutting of
structural members shall b� lone only with the approval of the
Archite
ct.
16050/3
Cooperate with, other trades to coordinate locati'ons of
electrical outlets and apparatus.
Perform for other trades , the eleCtr ical wi ri rig and
connections for all devices or apparatus where not specified
herein or indicated on the drawings.. Consult the
Architectural and Mechanical drawings to avoid the location of
switches, outlets and other equipment from being �idd.en behind
doers, cabinets, counters, heating equipment, etc, Berried
electrical devices and/or connections shall be relocated as
directed, at no additional most to the C]wner.
Completion of Nark and Test
Before energizing any circuits, make mugger ground tests an
conductors and fused disconnect with the distribution breakers
open and all circuits feeding from the main panel. These
readings shall be recorded with their circuits and submitted
in triplicate to the Owner's Representative before the system
is energized.
Submit With a letter []f txuarar�tpP a tr;
voltage reading
motors, and the
any abnormal
attention of
submittal.
�Vy.ir..c..a a.4 i GL.LJl1.i Vl Q
and ammeter reading an all phases of feeders,
main service to the facility. If there are
conditions, they shall be brought to the
the Architect in writing as a part of this
Also submit with the load readings for the mators. a
motors with the size of overload heaters used for each
This includes thermal switches.
Contractor shall test the
Architect or his designated
a l 1 equ ipment as working and
shorts or other defects shall
the owner before acceptance
Guarantee
list of
motor.
system in the presence of the
representative, and demonstrate
0
ap�rating. dill grounds, opens,
. be rectified at no extra most to
and payment .
The entire electrical System installed under phis contractor
shall be lift in properwork ing order and be in compliance
with the drawings, specif ications and/or authorized changes to
the satisfaction cif the Owner's Representative. Without
additional charge, replace any work or materials which develop
defects, except from ordinary wear and tear, within one year
from the dates of final acceptances. Exception: Incandescent
and fluorescent lamps which shall be guaranteed for a period
of two months from acceptance of the installatic>n by the Owner
or his agent. A written guarantee covering the above
provisions shall be signed and delivered to the Architect.
after the project, has final acceptance by the inspecting
authority.
16050/4
T - rary Facilities
Provide for use of other trades during the construction
period, required tem orary electrical power, complete with
required main breaker., switch panel, meter, poles, conductors,
etcAt the completion of the work or when so ordered by
Architect or Contractor, remove from 51tE:r all parts of
temporary electrical services leaving no discernible scars.
Contractor may connect and use lighting fixtures as designated
by Architect for lighting during constructi"Lon. Replace bulbs
and other parts of lighting fixtures damaged or burned out
during such use at completion of work at no additional mast to
the owner.
Systems
System is 120/208 volt,
mechanical equipment, 1
mechanical equipment .
Ground
three phase, 4 wire,
6(] Hz,
for
large
ghting, conveniences
outlets
and
small
The neutral conductor and cabinet, conduits, appliances,
equipment, motor frames, and motor bases, etc., shall be
bonded to the grounding system in accordance with requirements
of the National Electrical Cede.
PART 2 - PRODUCTS,
Conduit System
All wiring shall be installed in
be concealed within the ceilings,
locations where exposed raceways
the Architect.
Electrical metallic tubing may
smaller are xequired, except
concrete slabs adjacent to earth
to mechanical injury. In all
galvanized conduit shall be used.
above grade level.
approved raceways and shah
walls, and floors, except in
are specifically permitted by
be used where sizes 411 and
where installed in earth,
)r in vacations where subject
such cases, standard steel
Tubing may be used in slabs
Intermediate metallic tubing systems shall utilize raintight
compression connections or set screw type fittings throughout
Crimpon indenter type fittings will not be acceptable.
Precaution shall be exercised to prevent accumulation of
wester, dirt, or concrete in the conduits during the execution
of the work. Conduits in which water or foreign matter has
been permitted to accumulate shall be thoroughly cleaned or
the conduit runs replaced where such accumulation cannot be
removed by methods approved by the Architect. No wire shah
be installed until mark which might ceruse damage to the wire
or conduit has been completed. Conduit which has been crushed
or deformed in any manner shall not be installedft Conduit
16050/5
r
rung shall be �ent a minimum distance
steam pipes. Conduit. tubing,
an approved manner by means 0 of
of 611 from
end boxes shall be
hit water and
supported in
extension shields or embedded
supports in concrete or solid masonry, to
masonry units, wood screws on wood and me
ggle bolts on hollow
tal screws an metal .
Wooden plugs inserted in concrete or masonry units
be used as abase for fastening conduits,
V
shall not
low,
cabinets, etc. All raceways 3/4" and larger shall utilize QZ
type "All insulating bushing at cabinets and outlets. Raceways
entering outlets or cabinets shall have double lack nuts
applied for grounding purposes and then insulating bushing
applied over lick rout.
All empty conduit shall have a 200 lb. nylon pull cord.
Conduits buried in earth shall be galvanized rigid conduit
painted with two coats of asphaltum baste paint allowed to dry
between coats and before backfilling. This sub -contractor
shall provide flashing around all conduits which pierce
roofing or similar structural areas. Coordinate all work with
roofing sub- contractor .
Conductors
Conductors for feeders and
otherwise shall be copper.
Neutral conductors shall be
riser diagram. Sizes smaller
in branch circuits. Sizers #8
Larger feeder
with plastic
or gutters.
Outlet Bowes
branch circuits unless noted
Insulation shall be Type THW,.
of the sizes
It an the
than #12 AWG shall not be used
and larger shall be stranded.
Phase A - Black
Phase B - Red
phase C - Blue
Neutral - White
Ground - Green
Switch to light or
purple or drawn
equipment
C+DIIdL1CtbrS shall be
tape on conductors at
An approved galvanized steel
shape to fit the purpose of
each outlet location shown
specl* fied.
- yellow, orange,
color coded as shown above
all pull boxes, cabinets,
outlet box of suitable size and
the outlet shall he provided at
on the drawings, and as herein
Wall outlets in exposed black or
have extension and device mounting
S .0
masonry construction shall
straps as required in order
to proviae oniy sucn wall ❑penings as may �� co��red key device
plate without the use of mortar or other filler materials.
Outlets in plastered, paneled. and/or furred finishes shall be
�quipged with extensions of such depth as to kering outlet
16050/6
flush with suds . Metal supports and other
be provided far the purpose and location of
accessories shall
ea�ch fox.
The Architect shah have the right to relocate within
foot radius and prior to installation, any cutlet
additional cost to the owner&
Wiring
Wiring devices shall be in
schedule shown an drawings .
outlets shall be as directed
otherwise noted on plans,
finished flog approximately
Switches
a ten-
without
accordance with types and outlet
Exact mounting heights of wa11
on the job. In
outlets shall be
as indicated in
Wall Switches:
Conveniences outlets:
Convenience outlets in
0
f �nished rooms
Telephone outlets:
Motor Push Buttons:
Thermostats:
4 -f ---w011 1
161t
general , unless
mounted above
schedule.
set vertically
set vertically
Single pole, 3 wad or ether arrangements as indicated on
drawings. Unless specified otherwise, switches are generally
ivory. Provide switches rated at 120 volt, 24 temps with
connected lamp wattage not to exceed 1640. Switches to be
Hubbell, Levieton or Bryant -
Rete tales
Except those required for special applications, provide
receptacles of same quality and manufacturer as switches.
Furnish duplex receptacles with integral ground NEMA Standard
Type 5-.&20R at locations where basic receptacle is indicated on
drawings. other types, configuraiions and current ratings
provided as indicated and located on drawings. Verify special
requirements with other affected trades. Unless indicated or
specified otherwise, receptacle color: Ivory Provide
Hubbell., Leviton yr Bryant.
Wall Plates
All devices shah have Goverplates. coverplates shall be.
Stainless Steel or high abuse fiberglass, color to match
device or as directed by Architect
galvanized steel in unfinished areas.
PART 3 - EBECIITION
in all finished aromas,
Branch Circuit Home Runs and Sequence Phasin
In general, home run circuits
16050/7
to lighting outlets are
schematically shown on the drawings,
accordingly. Wire and raceway sizes
indicated otherwise, shall be #12 AWG
and
of
wires
shall be installed
home rens. unless
_ in 3/411 conduit or
as required by code. Routing of home run circuits to duplex
receptacles, other wall outlets, exterior lights, etc., whish
are circuited on the drawings only by circuit number adjacent
to outlet shall be left to, the diescretion of the Contractor,.
No more than three
it .6
circuits shall be run in anv one conduit_
•1•ne utilizing or a common
not be allowed. The newt
neutral for game phase legs shall
ral conductor shall Garry only the
unbalanced current in the circuit. Neutral conductors shad
be of the same size wire as the phase conductors unless
specifically nested otherwise.
Motor and merit Wir
Electrical motors and other special equipment will be
furnished and set in place under Wither sections of these
specifications. Control wiring will be installed as outlined
under the Mechanical Specifications on Temperature Control.
Connection between conduit system and motor, by Electrical
Contractor, shall be liquid tight flexible conduit of 11-611
maximum length for each motor connection. Each and every
motor shall be provided with a thermal overload protection
means. Disconnect switches shall be provided under this
section where indicated or where required by NEC. Disconnects
shah be HD FEMA 1 steel enclosed unless otherwise noted,
eternally operated, voltage class for the. system in which
they are installed. .Starters when furnished shall be combined
with disconnect and ordered as a combination
dJ'.sconnect/ starter switch.
This sub -contractor shall consult the Mechanical Division
Temperature Control Sub -Division of these specifications and
perform those functions as outlined herein to be done by the
Electrical sub -contractor.
Each motor starter, manual or magnetic, shall be equipped with
the griper heater elements, provided and installed by the
Electrical Contractor, and coordinated as to the proper sites
from the nameplate rating an the motor controlled. As soon as
an electric motor has been delivered orgy the job/ the
electrical sub -contractor shall check the motor nameplate and
secure the proper heater elements in order that when the motor
is ready for installation and connection, the proper heater
elements are installed in the starer. ODeration of anv motor
without
__proper vvervaltacre protection w; 1 1 nit
Existin
EQU1 ent and Materials
The Contractor shall carefully examine
spec0
ifz�atians I visit the project site, and
himself ao to all existing Qvnditions,
limitations before starting the work.
16050/8
the drawings and
fuller familiarize
dimensions and
The Contractor shall also notify all corporations, companies,
individua3.s or local authorities owning, or having
jurisdiction over existing utilities and services which
interfere in any manner with the execution of the work under
this contract, and shall remove, relocate or protect such
utilities or equipment as required by the parties having
jurisdiction over same, without additional cost to the Owner.
If existing active or nonactive service (whish are not shown
an plans) are encountered that require relocation and/oma
disconnecting, the Electrical Contractor shall makes written
request for decision on proper handling of these services.
The Electrical Contractor shill not proceed with the work
until so authorized by the Architect. No additional cost to
the Dwner.
When areas of existing, occupied building are adjacent to the
area of construction in which work is going on, this
contractor shall arrange hies work so as to reduce to a minimum
the periods of interruption or outages in the various service.
16050/9
LIGHTING
SECTION 16500
a
Finnish and
install
lighting
fixtures complete with lamps at
all lighting
outlets
shown on
the
drawings.
Standards
Type of fixtures are keyed to symbols an drawings, (T-1, T-21
etc..) at` each outlet.
In the event of discrepancy, immediately notify the Architect.
Do no proceed with installation in areas of discrepancy until
all such discrepancies have been fully resolved.
Lighting Fixtures
Larr!ps
All fluorescent lighting fixtures shall be equipped with
automatic resetting self protected, super premium Class 'P',
SBM approved ballasts, Advance Mark SII energy saving approved
equals of General Electric or Universal.
Furnish
quiet
type,
energy sawing types ballasts with a sound
rating
"All for
all
430MA lamps,.
Furnish very quiet "VQ" ballasts
all SOOMA lamps approved equals
ballasts in all unheated areas*
with a sound rating "B" for
by Universal. Provide -2 0°
High Intensity Discharge lighting fixtures shall be equipped
with constant wattage type ballasts as manufactured by General
Electrics Universal, Advance or Jefferson. All ballasts shall
be high power factor.
Support all light futures according to seismic zone III.
Unless otherwise noted i.n schedules,
with]�ighting fixtures shall be
acrylic.
all plastic
of the 100
All lamps shall be as manufactured by
Sylvania. and shall be new at the time
16500/1
lenses
percent
for use
virgin
G*E*, Westinghouse or
of final inspectiond,
installation
Where lighting f ixtures end o�he�` electrical items are shown
in conf dict with locations of structural members and
mechanical or other equipment, furnish and install required
supports and wiring to clear the encroachment.
Fixture Support:
All f ixtures wi 11 be supported from structural members of
bui lding not by cei 1 ing car id system where suspended or
from wires suspending the ceiling grid system.
All fixtures installed on Mems above 12" shall have
swivels.
It shall be the responsibility of the Electrical
Contractor to supply and install the necessary equipment
for the hanging of light fixtures (support at each corner
of the fixture) independent of the ceiling, regardless of
the type of ceiling or requirements.
contractor shall
illustrat ions
ordering, in
specification.
submit a complete li0 st of fixtures, showing
and d
a
escript ions of fixtures f or approval before
accordance with general conditions of this
AUXILIARY SYSTEMS
SECTION 16600
* ■F
General Condit'ions
Provide and install all the equipment, materials, etc.
requiredfor a complete and operable system as indicated
hereinafter in this section. This shall include all
structural members, backup steps , handers, eta. , for
supporting all equipment rewired in each auxiliary system.
Upon completion of each system, the factory representative
shall check the installation, connections, wiring, supports,
assemblies, etc., and operation of the system. Each system
shall be installed in 3/411 minimum sizes conduit.
shall be in strict accordance with the section
heretof ore covered.
16600/1
Installation
an raceways