HomeMy WebLinkAboutLETTER - 94-00013 - Anderson Lumber - New Storage BuildingNILE L. BO L
MAYOR
ROSE. BAGLEY, CITY CLERK
RICHARD HORNERITREASURER
& FINANCIAL OFFICER
may 2 a,
1994
intermountain Builders
a Andersen number
P.O. fax 792
Rexburg, Idaho 8344D
STATE OF 1DAHO
P.O. BOX 280
12 NORTH CENTER STREET
REXBURG, IDAHO 83440
PHONE (208) 359.3020
FAX (2D8) 359-3022
RE : Building Flans for Open Storage Building @ Anderson
Dumber
Drax Sir ,
As we discussed. in my office and over the telephone, the plans
from Metallic Building Co. are somewhat incomplete. We need
information ars the following items.10
1. Framing members, connections, etc. for dines 1 & 6.
2.. Rfor column bases at column bases C,G,D,K,F,,j &
H d
3. Sheet C1 lists two sheets:
"General Details" and "Accessory Drawings" that we do not
have .
4. With the column reactions requested in Idem 2 above, your
engineer (Mark Forbord of Eagle Engineering) can design the
footings for the other columns.
5. Footings need to be kepi within the f enceline . i asked the
City Council at their Wednesday, May 18th meeting, if they
would consider allowing the footings to project out into the
street right-of-way. They said "no" unless there was some
serious design/ construction problem with keeping them on the
private property. Consequently, your Engineer needs to be
provided with a site plan so he can keep the footings within the
property line .
G .
Your Engineer told me over
the telephone
that he may
need
to
redesign the
foundations for
columns
E also
because of
the
large uplifting force.
Let me know when you gel more information.
ul u
J osepn A . Taira , y . h .
city Engineer J Building
JAL/jw
cc : Anderson
P. 0. Box
Rexburg,
Official
IF