Loading...
HomeMy WebLinkAboutLETTER - 94-00013 - Anderson Lumber - New Storage BuildingNILE L. BO L MAYOR ROSE. BAGLEY, CITY CLERK RICHARD HORNERITREASURER & FINANCIAL OFFICER may 2 a, 1994 intermountain Builders a Andersen number P.O. fax 792 Rexburg, Idaho 8344D STATE OF 1DAHO P.O. BOX 280 12 NORTH CENTER STREET REXBURG, IDAHO 83440 PHONE (208) 359.3020 FAX (2D8) 359-3022 RE : Building Flans for Open Storage Building @ Anderson Dumber Drax Sir , As we discussed. in my office and over the telephone, the plans from Metallic Building Co. are somewhat incomplete. We need information ars the following items.10 1. Framing members, connections, etc. for dines 1 & 6. 2.. Rfor column bases at column bases C,G,D,K,F,,j & H d 3. Sheet C1 lists two sheets: "General Details" and "Accessory Drawings" that we do not have . 4. With the column reactions requested in Idem 2 above, your engineer (Mark Forbord of Eagle Engineering) can design the footings for the other columns. 5. Footings need to be kepi within the f enceline . i asked the City Council at their Wednesday, May 18th meeting, if they would consider allowing the footings to project out into the street right-of-way. They said "no" unless there was some serious design/ construction problem with keeping them on the private property. Consequently, your Engineer needs to be provided with a site plan so he can keep the footings within the property line . G . Your Engineer told me over the telephone that he may need to redesign the foundations for columns E also because of the large uplifting force. Let me know when you gel more information. ul u J osepn A . Taira , y . h . city Engineer J Building JAL/jw cc : Anderson P. 0. Box Rexburg, Official IF