Loading...
HomeMy WebLinkAboutPLANS - 94-00012 - Walmart - 1 Hour Photo Lab Additionv 2X(- STUD WALL W% MGQIJE ao I PLFXIGLASS AT TOP RAIL 00 ) PLEXIGLA55 AT N N TOP OF WALL ----------------- RE: DTL 4 + 5 - -� I - _ 2' X 11"-5' COUNTER �I t�9 I ( —SINK � EYEWASH O O N GHASE I C SINK N u I ��JJJJrd/ SILVER RECOVERI PRINTER/2X6 WALL W1 '1/2' I PROCESSOR B -G PLYWOOD N EXT _ I PP -1820V OF THIS WALL--- - - I I I I I � I 5 TTP. C� I END PANEL I FILM MACHINE I? I I FP-350AL- -I GOLOP I I I COPIER I I I in I I -MGOUE �9 RAIL- GASH WPAP I I I I I SIDE PANEL END PANEL q, -G, 2'-10' O O 0 N O 4}5ALr- SCALE____ FRAMING NOTES: CIGHT FLOOR PLAN 15GAL1 1/4'-= 1 -__O' /—WOOD FPAME W/ PLEXIGLASS AT TOP OF WAII I FUPNI5HFD BY WAL MAPT + INSTALLED BY GONTPAGTOR lit' C.YP. BD. -- -- WOOD WALL CAP - 2X STUDS AT IG' O G. UNLESS NOTED /--BOLT AS PEOLIRED -FMISHFD FLOOR-- —_— .. - ---- L _t TS 3X3X3/1GX3'-O' CORE DRILL GONG. CONNECT NEW 3' GOMPl1TER COMPUTER ELECTRICAL SYMBOL 50tlEDULE SANITARY SEWEP TO 110DFM TO EXIST SANITARY LINE - 5YMBOL5 DE5C4t"ON SEWER FIELD VERIFY INSIDE GABINFT FLU IT MOUNT 42' A.F.F LOCATION _ ___- MOUNT A.F.F. FOR REFRIG. -- 49 DUPLEX REGEPTAGLE, 2P. �W. 20A. 125V GROUNDING TYPE IF SUMP IS USED i — -- - - -- --- G. - � ------ - T -WATER EWH OUADRUPLEX REGEPT TWO 2P 3W. 20A. 125V GR. TYPE DUPLEXES. NO GLEAN OUT _ i HEATER ---- IS REQl11RED --' moi; , EYEWASH __ __ _ SINGLE ISOLATED GROUND TWIST LOCK P.EGEPTAC-I.F. - - - ---------- SNJK FILM PREPARATION J DIREGT CONNECTION TO EQUIPMENT If X 6' CHASE E I EWASH GUUNTEP. SUMP PUMP FOR VENT AND f� SINK VERIFY WITH G W. LINES - - SILVER WAL-MART / -- PRINTER/ -OJ /(;D JUNCTION BOX (WALL MOUNTED/GEILING-MOUNTED) REG AVERY CONSTRUCTION 20/2) PROCESSOR — -PRINTER/ MANAGER, � 4—SILVER MGG PP -1820V Q TELEPHONE OUTLET. - — PROGFS50R / REGOVERY M 10' X 6' GHASE-- ^' MOTOR. PP -1820V FOP POWER. - ----- -- --- TO PANEL P R RHEOSTAT FOR GEILING FAN. FILM (30/2) R MACHINE GORD� (30/2) - RHEOSTAT (BY GONTRACT(DR) FP-350AL-G.OFERRULE + PLUG -FILM FOR (RUNG FAN -PL - / CORD MACHINE TO BE I.OGATED ABOVE I I FP-350AL - PANEL BOX � I TELEPHONE -COVER F.F.E. COLOR JACK COLOR I C.nPIFP. I 42' Alf COPIER - I I �NOTE R - LPG f I D --x (GO/2) DIG -- A -- SLAB 1" G.. 3- #4 1 # b GR. -ALL UNDER- - - gl3' t -*8 i6R. li� COUNTER I RISER ALL PIPING AND P -TRAPS I EXPOSED TO SOIL SHALL BE PVC GASH WPAP COUNTER __ }PLUMBING PLAN SCALE 1/4' I WOOD FRAME (BT WAL_-MART) PLEXIGLA55 BY WAI_-MART (T(. -)P CIF FA WALL, TIP.) WOOD WALL CAP 2X STUD5 AT IG" OG W/ 1%2' GTP BD FACH SIDE f GRAY PI ASHG LAMINA IF H r )U I �41t- I P,' I FLOOR AND EPDXY GROUT 1--STABILIZANON IN PLACE. INSTALL FOR -- 111-- RE: DETAIL 4 WALL STABILIZATION. 'RAMING AND ELEVATION 1/4' -1 0" YELLOW PLASTIC LAMINATE ON IN51DE FACE (5)HGTION THRU WALL 3 1. NO FULL HEIGHT WALLS ARE REQUIPID. LOW WALLS SHALL BE 2X4 STUDS AT 1G" OG X 4 -0' HIGH W/ 1/2" GYP. BD, EA. SIDE (EXCEPT WHERE NOTED) W/ PLEXIGLASS + FRAME FURNISHED BY WAL-MAPT + INSTALLED BY CONTRACTOP.. INSTALL WESTINGHOUSE MIGARTA BRILLIANT YELLOW 90M40 PLASTIC LAMINATE r)N EXPOSED INTERIOR WAII- 2. CONTRACTOR SHALL FURNISH AND INSTALL BOTH FRAMING AND G I P. BD. WAL-MART SHALL FURNISH PI-ASTK• LAMINATE 3 WAL-MART SHALL FURNISH GASH WPAPS WAL-MART SHALL ALSO FURNISH PLEXIGLA55 4. CONTRACTOR SHALL FURNISH AND INSTALL TUBE COLUMNS TO 5TABALIZE WALL EXTEND 1' 0' BELOW SLAB AND 2' I)' ABOVE FLOOR LEVEL (COPE DRILL AND EPDXY GROUT INTO PLACE). 5. WAL-MART SHALL FUPNI5H DOOR + HARDWARE OR. MATERIAL TO 'JOB -BUILD' DOORS. G ROUGH OPENING FOR DOORS 15 38 3/4' 7 EXTERIOR OF PHOTOLA13 TO BE PLASTIC. LAMINATE FURNISHED BY WAL-MART. INTERIOR. SHALL BE PLASTIC LAMINAIF FLJPNISHED BY WAL-MAPT. 8. VERIFY EXACT ORIENTATION Of PH(%TOLAB WITH WAL MART PROVIDED MERGHANDISE PLAN. 9 GHASE MATERIAL AND WOOD WALL r,APti SHAT -I BE FUPNISHED AND INSTALLED BY CONTRACTOR. EXTEND CHASE IO BOTTOM OF EXISTING ROOF J015T PAINT 'SILVER. LINING" GOLOP. 10. CONTRACTOR SHALL FURNISH AND IIJSTALL RESILIENT BASE ON ALL EXP05ED WALL 5 11 CONTRACTOR SHALL INSTALL WAL-MAPT FURNISHED END PANELS + SIDE PANELS, 12. INSTALI_ WAI -MART FI IRNISHFD 5HH VINE STANDARDS ON FXTFPIOR OF 2XG PI IIMBING WALL. 13 PLEXIGLASS AND WINDOW FRAME MAIFPIAL SHAI L BE FIJRNISIIED BY WAL--MART AND INSTALLED BY GONTRACTOR. 3 C ELEGT IR GAL PLAN SCALE = 1 l__- GONNEGT TO AUTO VENT OR EXISTING VENT. I I --GATE VALVE ROUTE THP.OUGH 10' fir' / EXIST GOLD WATER CHASE. EXACT. LOCATION I - ABOVE CEILING TO BF DFTFPMINFD I - BY GONST MGR_ I� / -- (,AASE - RE: FRAMING NOTE 9 Ir IF VENT EXTENDS 25"-0" OR MORE AT (FAST A . _ ( 2' DIA. VENT PIPE WILL r� F I 1 `' BE REQLNP.ED 5TU STUD I -----. - --- I WALL - � I I I ff tF11 , WAIEP. HEATER BEL OW COUNTER SINK J F )FW4:4H--- 'CONNECT NEW 3' 5ANITAP,1 SEWER T() EXI5T SANITARY SEWER NO SUMP PUMP REQUIRED (FIELD VERIFY LOCATION) (G THOTO LAB 150METRIG5 NOT TO SCALE PLUMBING NOTES: 1 THE PHOTOLAB EOLIPMENI WILL BE FURNISHED AND INSTALLED BY WAL -MART GONTRAGTOP. SHALL FURNISH + INSTALL 10 GAL- WATER HEATER. AND ALL ASSOCIATED PIPING PHOTOLAB IS FREE STANDING AND HAS NO FULL HEIGHT WALLS. ALL PIPING SHALL BE RIJN IN HAI F WAI I I IJDFP (.01JNTFP OR IN CHASF EYEWASH: FUP"5H + INSTALL 1 J/4" WASTE + 1/2 GOLD WATER STUB -OUT FOP CONNECTION STUB -OUT FOR EYEWASH FURNISHED BY WAL-MAPT. FINAL IN5TALt_ATION B) GONTRAGIOP E iEWASH SHALL BF INSTALLED NEXT TO `+INK ON END PANEL 3. SINK FURNISHED BY WAL-MAPT + INSTALLED BY CONTRA( TOR C•ONTPAGTOP SHALL FURNISH + INSTALL DELTA FAUCET MODEL 400 (W; cPPArER) CNO 51_I13STITIITION) 4. ALL DRAIN PIPING SHALL BE SCHEDULE 40 PVG CONTRACTOR. TO REMOVE FLOOR TILE + SAWCUT EXIST. GONGRETE FLOOR SLAB AS REQUIRED To INSTALI NFW SANITARY SFWFR I INF RFPI AVF CONCRETE SLAB TO MATCH EXIST FLUSH + SMOOTH CARPENTER CONTRACTOR SHALL PEPLAGE WAL-MAPT FURNISHED FLUOR TILE TO MATCH FXISTING WAL-MART I oNSTRUCTION MANA);ER WILL DETERMINE IF A SUMP PIJMP IS REOLIIRED IF SUMP 15 P,EOUIRED. IT SHALL BE HALLMARK REFININGCORP IWAKI MAGNETIC DRIVE PUMP MODEL MD70RI_T.115V SIJ(.LE PHASE 2P. 300 W. GO H7 :A A FIIP.NISHED BY WAL-MART SFAI- TIGHT CONNECTION FP.OM FFFDEP PANFI AUTO VENT OR CONNECT TO EXI5TING VENT G_ SUMP SHALL BE LOCATED DIRE(. TL_ t ANDER `_,INK. 7 FUPNISH. INSTALL + GAP DISHWASHFP GONNF l • 1 ( )P ) )IJ P- TRAP UNDER SINK FUR SILVER REGOVFPY FINAL )•(INNF( TION TO BE MADE BY WAL-MAPT 8 MODIFICATION TO THE EXISTING; SPPINKLEP SYSTEM IS NOT P.EQLNRED 9 ALL PIPING + P -TRAPS FXP05ED TO SOIL SHALL BE PVC,. 10 FURNISH + INSTALL SPPAYFP W/ SINK CONNECT TO AUTO VENT I.0_�OR EXISTING VENT. TO EXISTING WASTE PIPE —GATE VALVE EXI5T GOLD WATER I ABOVE CEILING �-r 2xG r I 1 2- c STUD I I WALL I = WATEP. HFA TF P. BELOW G(xJNTFR 1" 1 _ SUMP PUMP EYEWASH---- i SUMP PUMP REQUIRED ELFGTP•I(.',At NOTES 1, THE PHOTOLA13 EQUIPMENT WILL BE FURNISHED AND INSTALLED BY WAL-MAPT. CONTRACTOR SHALL FURNISH AND INSTALL ALL GIPCIJIIPY SHOWN WHFPE EQUIPMENT IS INSTALLED. 2 FILM MACHINE FURNISH AND INSTALL A 30 AMP 250 VOLT. 2 POLE. 3 WIRE, 60LATED GROUND. TWIST LOCK RFGFPTAGI_F YARROW HART IGG340 OR EQUAL) AND MATCHING CORD CAP (ARROW HART IGG12 OR EQUAL) W/ 10 -O' OF 410\3 50 CORD- CONNECT GORD TO FILM MACHINE 3. PRINTER /PROGE 5 SOP:FURNISH AND INSTALL A 30 AMP. 250 VOLT. 2 POLE. 3 WIPE. ISOLATED GROUND, TWI5T LOCK RECEPTACLE (ARROW HART IGG340 OR EQUAL) AND MATCHING CORD GAP (ARROW HART 6342 OR EOUAL WI -10 -0- OF #10/3 SO CORD. GONNEGT CORD TO PPINTEP/PPOGE550P 4. FIELD VERIFY AND SUPPLY GIRGUIT PANELS AND BREAKERS AS REQUIRED. INSTALL ELECTRICAL IN STUD WALLS EXCEPT FOR REFRIGERATOR OUTIET + HWH GOVEP PLATE WHICH SHAH BE MOUNTED TO INSIDE FACE OF CABINET NEW PANEL SHALL HAVE A V G. WITH 3 #4 WIRES LOCATED BEHIND FILM MACHINE. NEW PANEL SHALL BE GONNEGIED TO THE APPROPRIATE PANEL IN EXISTING ELECTRICAL GAGE. NEW ELECTRICAL PANEL SHALL BE SQUARE D 120/208V/1P/3W. GOA M.L.O. LOAD GENTFP. W/ GROUND BAR. FLUSH MOUNT 10.000 AIG 20 BREAKERS. 5 ALL REGEPAGLES SHALL BE MOUNTED AT 12' ABOVF FLOOR EXCEPT FOR TH05E NOTED TO BE INSTALLED ABOVE GABNJET INSTALL TELEPHONE OUTI_ETS AT H E IGH T 5 INDICA T E D. 6 INSTALL WAL-MART SUPPLIED GEILING FANS W/ RHEOSTAT (BY CONTRACTOR) OVER PHOTOI_AB AREA LOCATE RHEOSTAT ABOVE PANFI_ BOX 7. ELECTRICAL CONTRACTOR SHALL RUN IRG GABLE FROM LAB TO UPC; OFFIGE LOOP BOX AND LEAVE 8 5LAGK AT BOTH ENDS 8. FURNISH AND INSTALL GC) BREAKER IN PANEL. I_F) FOP PANEL 'PL' FEEDEF 9. FURNISH AND INSTALL ISOLATED GROUND BAR ALI RffGULA2 GROUND IN FAr-45l "Pt" WATI ( V } _ _- - N.T.S. - FLOW (%7 )INTERIOR GLEANOUT \ -SCALE, - 1._1/2'=1'-O" PM2-3 l- 1/2' 2 ----- GtiEGK VALVE --BALL VALVE CTYPIGAL) L---__1.-- �--UNION (TYPIGAL) - -T + P RELIEF VALVE WATER HEATER PIPE FULL SI7F Tt� IL( -)()P LWAIN. 11111. 11 2' AIR GAP TER PIPING + 5UPP FP.OM ONE HOUR PHOTOLA13 SIJhN' - GELLING FINISH FL SANITARY �LnLr T DETAIL PM2 -5 (9 V� E�NTII�SER _� SCALE_ _1!2__1__[ EGT TO EXISTING OR AUTOVENT f,ONIkAGFt_)k 'nHALL BE RESP(-)N`;IBLE FU GUORDINAIF PHOTOI_AB L(x,ATION WITH MERCHANDISE DRAWING. c (j m W ^� 11� a Q W V two 0 N AM W NZ Q Z Y ¢¢ p w w G7 a °> r a Ll a } m a xm W°m°m 00 I an AL1. QUE5TIONS RELATED TO THE WORK INVOLVED SHALL BE TNP.E(.TED TO THE STORE PLANNING DEPARTMENT OF WAL-MAP.T. STEVE MITGHAEL OR ATTENTION! DAVE MENCL 501 273-4909 CONTRACTO , NOTf EACH SUBCONTRACTOR 15 RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECS IN THEIR RELATED AREA. THE FAILURE TO AQUAINT THEMSELVES WITH THI5 KNOWLEDGE DOES NOT RELIEVE THEM OF ANT RESPONSIBILITY FOR PERFORMING THEIR WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BEGAI15E OF CONDITIONS THAT OCCUR DUE TO FAIL LIPF TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. ONE HOUR PHOTOLAB—R lT 0�"