November 29, 1994
Bill Smith
Division of Environmental` Quality
224 South Arthur
Pocatello, ID 83204
RE: Rexburg West Main Water and Sewer Extensions
Dear Bill:
Accompanying this letter 4is a copy of the Record Drawings for the
development which was completed on West Main in Rexburg,
93-224
orr \nov-94\b1tl-1 1.29
water and wastewater
This work included the extension of waterlines in#o the area on the west side of town and also
the construction o#amain wastewater interceptor to serve the areas west of the West Main Lift
Station.
We hope that this meet tete requirements for Record Drawings. If you have questions or need
further information, please feed free to contact me at your convenience.
Sincerely,
FQ
GR." N ASSOC
I-ATES, INC.
;John W. Willar. P.E.
Project Manager
JWM/ch
Enclosures
cc: Joe Laird/City of Rexburg
A COMPANY OF PROFESSIONAL ENGINEERS CEN TRA L OFFICE 350 NORTH 200 EX RG IDAHO 83440 / (208) 356-9201
H.
NILE L. BOLE
MA YOR
ROSE BAG E , CITY CLERK
RICHARD HORNER, TREASURER
FWANCIAL OFFICER
November
Mr . John
P.O. Box
Rexburg,
Dear John
r
Millar,
549
Idaho
*E.
83440
STATE OF IDAHO
P.a. sox ?ao
12 NORTH CENTER STREET
RExBURG, IDAHO 83440
PHONE �208) 359-3020-,
FAX (208) 359-3022
We have not received the required test, cert icatmoons f "AsBuilt"
drawings,, from your f irm on the f ollowing proj ects 0
A. South nth Street 4th West to 3rd West
1. Need copies of your test results for compaction of water line
trench materia.1, street subgrade, etc
Compaction and gradation test fi Crushed Gravel Base
. Compaction, gradation and oil content tests l i
4. Concrete tests fcr sidewalkcurb and gutter.
S. Waterline test results
6 "As Built" drawings of the 611
waterline,i-ts extension to the
south near mid -block, fire hydrants, valves, etc. The waterlinewas
not installed parallel with the right-of-way limes as the plans
depicted but instead angled off to the north as it was installed from
4th West towards 3rd West. At 4th West they found the existing
waterline was only around 3 feet deep. They connected to the existing
waterline incl then dropped each newly installed length of pipe a few
Tenches until they acquired the needed 5 feet of cover. As I
discussed with Vance Forsgren, shortly after the start of
construction on the waterline, the City feels that it very
important that the "As Built" drawings show both the horizontal and
vertical location of the waterline, curb line, sidewalk, driveways
(or whatever) accurately and clearly. Please have your draftsmen
show this information in red on a prLnt of the project area and
will have Mountain River EngiLneerang change t itr- i l . . . D .
drawings to reflect these changes
7. There are still several manholes and water valves that the
contractor did not raise to grade.These need to be brought to grade
and the roq-taired concrete Dopar inatalled around them. I hope this
can be accomplished as soca ag pogsible. We needed access to one of
these manholes yesterday
busied.
B. Ric - Palmer Add it ion
but were not able to get
into it
as Lt
We need copies � your test results; your certification that the
street, storm drainage, water and sanitary sewer facilities have
tu.t conformance with Casty, Standards Specifications;
the Record Drawings for the subdivision.
C. Comfort inn / Walker Crass Prapert
Annexation &_Tt
was
been
and
1. We need to knew where the southerly end cf the " QVC pressure
art r a a would like t 1t up and extend it
with our city forces.
2. Was the water valve easterly of the motel ever brought up t
graded We were not able to findIt earlier J -n the year.
3. Were the 1211 vc":Llve boxes between`est & 5thWest brought up
to gra-der?
4o We still haven't received utility easement from: the
landowner immediately west of 5th West; the landowners north of
Main Street & west of Airport Road; and ) Walker Cross.
need copies of your test results. Your certification that the
water , sanitary sewer and street facili.ties were constructed in
accordancewith the City's Standardsand Specifications* and Record
Drawings for the variousimprovement .
D. Airport Road Waterline
We reed copies of your test results; your certification that the
waterline was constructed 'in conformance with the City's Standards
and Spec if ications; and the Record Drawings for the waterlinew
Thank you for your attention to the above items.
Very Truly Yours ,
.x
V
A
City Engineer Bu i l d ing Of f i a l
JAL/ jw
ic aP fc`s � ;>iv�
F.O RS G R EN
_ ASSOCIATES, INC.
November 11, 1994
Joe Laird
City of Rexburg
12 N. Center
Rexburg ID 8344)
Dear Joe:
93-224
Accompanying this letter are two copies of the final as -build drawings dor the West Main water and
sewer project. Also accompanying the fetter is the marked up copy of as -milt drawings which
you submitted to our office in early August. We have made the changes as you had noted and
have also provided additional references and corrections as we finalized the record drawings.
Also included
are two
copies of the easements
from Ericksons and Anderson, These have been
executed and
should
be recorded with County
Recorders office.
The easement across the Comfort inn property is being done
dedication on a site plan record of survey. This is incl uded in
meets your requ�rements.
by a site survey with easement
draft firm and vtirill be final if it
We have also included a copy of the pressure tests and ex#ilkration tests which were done on the
water and sewer lines dor your lines-,
1 have also included the original ropy of the Application and Permit to use Right -of -Way for the
highway department. This probably should be maintained in the City's records.
We have rechecked all man -hales and have removed some accumulated material which was
found in some of the man -hales. There is approximately �/� to 3�� of and inch of water that stands
in two of the man -hies due to the extremely flab slope of the 18 11 line.
The lid of man -hole 7 is in the Erickson's property. Due to the tact that they wish to continue
farming the site we have recessed the man -hole deep enough so that they can farm across the
top of it. This was a condition they made in giving an easement to that property. At the time the
property is developed the man -hole can be raised to thefinished gra-de of the developed site.
The 4" sewer pressure line has been added to the as -built drawings.
f hope that with this information you will consider the project accepted, and can make payment
to Walker Cross so that final payment can be mads to the contractor.
COMPANY OF PROFESSIONAL ENGINEERS CENTRAL OFFICE 350 NORTH 200 EAST / REXBURGjr IDAHO 634 208 356-9201
E RUR /SF E A T WEST YELLOWSTONE L 7' LAKE C17'y rCHEF
-A
November 11, 1994
Joe Laird
page2
if any additional information is required please let me know as soon as possible. So that final
payment can be made,
Sincerely,
FORSGREN ASSOCIATES, INC.
John W. Millce:
Project Manager
JWM/Clt
Enclosures
r
r
r FORSGREN
w+,oaeru.
REPORT OF PIPE PRESSURE TEST
{Project No.
Report No.
Client 1 �°` Testod By
-
t._
f
Project cum
L::: -
Date Tested3-0,
Locat*ionZv Piping system
Length z 0 ` �- Ripe Material 41--'
Required Pressure � � r� �, , Required Time
REMARKS
Test 0
r4
3
Start Pmazure
lest Passed
---------------
-
End Time
d7-- 0 1P. : S
"-.), I 1 -1 SIC) 4171 17Z 6 /1 1 /0 . A,
Test Famed
bw
NOTE; Use reverse side for sketch ff necessary.
pecltor
roject Manag
OR
REPORT OF PIPE PRESSURE TEST
Project No., 7.3- - 2 Z I/
Project l,O os.- 7 -
/IV( �� 7L,Q DateTested 6-Z7-2
Location � !.(� . � ��c. �� Piping System � z
Length /ecn � Pipe Material �. Tr,
Required Pressure f e5D �'-5 L Required Time "J's
FiEZ-1ARKS ,
V
S�
s--_-fo f Z "
NOTE: Use reverse side for sketch U necessary.
L
Test Failed
91
dF
goer
10
REPORT OF PIPE PRESSURE TEST
Project No., 7.3- - 2 Z I/
Project l,O os.- 7 -
/IV( �� 7L,Q DateTested 6-Z7-2
Location � !.(� . � ��c. �� Piping System � z
Length /ecn � Pipe Material �. Tr,
Required Pressure f e5D �'-5 L Required Time "J's
FiEZ-1ARKS ,
V
S�
s--_-fo f Z "
NOTE: Use reverse side for sketch U necessary.
L
Test Failed
91
dF
goer
Project No.
Project W Iz. s, -r-
-' FORSGREN
ws+azaru i./c
REPORT OF PIPE PRESSURE TEST
//V IZ7-Z7te
�-
Rer%^rt No,.
Client l,� _��= .�� � f � c�� s
Tested By k� C
Dade Tested � �- t �' � �r.� , 1 1�1 9
Location6Tb
�` Piping System.
length Pipe Material 14.5 `` �`'V C
Requited Pressure Required Time
R EMARKS
Tess Passe
lest Failed
NOIM: Use reverse side fo.r, sketch ff necessary.
f
f
.. l 0l l
�.-
�� 1- 0 ir -,rl
/I- C) IC- 4L�
-
1-n (,4� -
0 C) (-) c)
Cl -
I
-0-- 1E was
REPORT OF PIPE PRESSURE TEST
�?3 -,7
•
Project N. - � --Z-1
Client <:�/Z Tested By
Report No. Z
- -
Pro)ect����� ,���'a.�r� ���. c a-� Date Tested
Location Piping system
Length �� ��S � -� Pipe. Material Required' Pressure Required Time 14
R�r,AaKs
0
J
a
NOTE: Use reverse side for sketch if necessary.
trilspector
�r
f
Test Failed
Project Ma aoer
f3�TCT►'Z� �� �►rl
ASSOCIATES / P.A.
August 12, 1994
Joe Laird
City of Rexburg
P.O. Box 280
Rexburg, ID 83440
RE: West Main Water and Sewer Projects
Dear doe.
Accompanying this letter are two (2) sets of " as -built"
made to the wader and sewer systems on West Main.
Project and the County Airport Road Project auto one
93-224
drawings for the extensions which were
We have included both the Comfort Inn
set of " as -built" drawings.
All lines were tested in accordance with our plans and specifications and the water and sewer
lines both passed the required testing, A 95% mandrel was pulled through the 18 -inch and the
8 -inch sewer lines to test for exeessive deflection, No excessive deflection was found and the
mandrel was eatsi[y drawn through each section of the sewer pipe.
We hereby certify that the project was com
and specifications with the modifications
drawings,
pleted in accordance with the approved project plans
noted in Change orders or on the final " as -built"
The final
cost
for the contract with R&S Construction is as shown on the
accompanying payment
request.
The
final cosi for the Edstrom contract is shown on their final
payment request also.
We feel that all work has been satisfactorily completed and that Bina! payment should be mads
to both contractors. If you have questions or need further clarification on any item, please contact
me at your convenience.
Sincerely,
FO�EN ASSOCIATES, INC.
Jdhn vv. iviiiiar, r.c.
Project Manager
JWM/csd
enclosures
cc: Mayor Nile Boyle/Rexburg
COMPANY OF PROFESSIONAL
ENGINEERS
E'EN TRA L
OFFICE P. 0.
13OX 54.9 1,350 NORTH 200 EA ST RE #3 R , IDAHO 8344 0 / ( "" ) 356-9201
R
E B U R l B O I E i` E VANS
T 1 1F f
E R I W E
T E L L 0
WS T O E L T LAKE 1 T I I E 1* T C E
MILE L. BOYLE
MAYOR
ROSE B GLE , CITE' CLERK
RICHARD HORNER, TREASURER
& FINANCIAL OFFICER
September 6. 1994
Mr. John Millar., P.E.
Forogren Associates
P.O,. Box 549
350 North 200 East
Rexburg, Idaho 83440
STATS OF IDAHO
P.o. pax 280
12 NORTH CENTER STREET
REIIBURG, lDA#I0 $3440
PH -ONE (20$) 359-302
FAX (20$) 353-3022
R IV Rexburg Water & Sewer Improvement Phase II - Water & Sewer
to Comfort Inn & Water to SolidWaste Transfer Building
F. Project #93224
Dear John,
Reference is made to your letter of August.
Drawing attached therewith and the request
the contractors 4
12, 1994, the Record
for final payment to
One set of the Record Drawings was returned to your offices
week or so ago, with notations thereon request ingthat they
ref lett the "records' or 'gas built" character f the -Droject in
greater accuracy and J..1.
. We are 111 waiting for the easement documents for most of
the roD.
.
Please
send us copies of
your water line tests so that we
have
a more
complete history
on the project.
4. Our sewer crew just completed a rather hurried check of
condition of the completed project and found the fol lowing
conditions that need to be addressed,:
. o #4 has water standing in it, indicating the line
his a low spot in it or a builddirt or debr]Lsin the
line .own stream from the manhole. D o your "as built"
recon.s indicate th.i ..& is low or does the line need to
be flushedout
B. The 1-i-1 of M.H. 47 is covered with-i-rcould not
Ln access to it*
C. M.H. #8 had water standing in i r indicat-ing indicatingthe line
has a low spot in it or a build up of dirt or debris in the
line downstream from the manhole. Do your "as. built"
records indicate this M.H. is low or does the line need to
be Maenad outs
Do M*Ho #9 has a lot of debris in the bottom of the
manhole. Perhaps the entire line needs to be flushed out,,,
E. Where does t " pre sure line connect to the system
and where is its southerly end* I assume this question will
be answered by the new Record Drawings
. Please send us copies of the air pressure tests on the sewer
line and the static water level f iltr ti tests on the
manholes have more complete history the pro] t
We have no contract with R & S Construction, but, will k
payment t Walker Cron in accordance with the rp t ton
Agreement as soon as the above listed items are resolved.
Very Tr - You
�R.
Joseph A. L a i n F P * 9-0 ly
City Engineer / Building OffiLcial
JAL/ jw
FILE L. BOLE
MAYOR
F
RX lur
STATE OF IDAHO
ROSE BAGLEY, CITY CLERK
RICHARD HORNER,TREASURER
FINANCIAL OFFICER
June 28t
Mr. John Millar, P.E.
Forsgren Engineers
P.O. Box 549
Rexburg, Idaho 83440
West Merin Water & Sewer Project
Dear Sohn.,
P.O. BOX 280
12 NORTH CENTER STREET
REXBURG, IDAHO 83440
PHONE (208)-3020
FAX ('208) 9.302
Reference is made to your letter of Funs 21, 11994r to Richard
Horner regarding payment to R & S Construction for the above
referenced project. We have not yet received a signed copy of
the Development Agreement between the Developer (Walker Cross)
and the City.Our contract is with the Developer, consequently
our payment has r at least include him. At such time
as
rete completed contract will -.
Walker r Construction for the amount set forth
Payment Request N. 1 that you sent
Additions to the Development Agreement (such as the 411 sewer
pressure line) will . to be formalized with an Addendum to
the Development Agreement,. I reviewed this item with the City
Council at their June 23, 1994 meeting and received their
approval. of same,. Whish contractor i * ins -tall thiLs 4"
pressure line?
As indicated, e
are waiting
for a signed
Development Agreement
from Walker, Cross
and we will
proceed with
the requested payment.
Very -Tr)aly Yours,
Joseph A.
JAL/ jw
Lair
01
e . -AA. 'L-' L' ."a' ems,a 7t1��+''�le-ri+l1Fl �5d•!1 .°' +311.1:1.. �: '.'�•��+ten ar saL-.. �- _. -Ts._ -•�.: .. ,.T .. .
dp
NILE L. BOYLE
MAYOR
ROSE BAGLEY, CITY CLERK
RFD SCORNER, TREASURER
& F"NANCI L OFFICE
'VQ�d�J V, 9?e X IMF �l
!r d
STATE OF IDAHO
May 11, 1994
Mr. John Millar, P@Ee
Forsgren Associate
P. 0# Box 549
Rexburg, Idaho
City f Rexburg
Water System Improvements
5th West to Motel to Transfer
Dear John,
Vie City engineering, water,
have reviewed the referenced plans
comments . 0
station
sewer, and
and have
1. We would like to see valves on
1200 deet to 1,500 feet intervals,.
having valves at approximatelythe
1 . + . + 60, 1
satisfactory,.
. At 2 locations, Stations 7 + 50
, use two � bends rather than
the corners, keeping the waterline
still Leaving room for the sanitary
around the corners a1 .
P.O. Bax xsa
12 NORTH CENTER STREET
RExsuRG, IDAHO 83440
PHONE (248) 359-3020
FAX (208) 359-3022
fire departments
11
the following
the main 1211 13-ne 13-nat
On this line it. looks
following Stations:
90 + 05. will be
to 5
a
inside
sewer
and
bend t
the
and
roughly
1 +
1 to 1
round off
curb line but
storm drain to get
Between Station .1 + 00 and 24+ 00 we will have a stn 3"-t r
sewer going along the edge of pavement along the Park Street
church frontage. Consequently, the waterliLne wi.11 need to be
around 12 feet south of the ewer line. After you get west of
-- - -� - , _ . - - ®* - - •eT .,��- ,e .a-. �+- -- �-.s tR-M":-.��.e�;_���r3;1PSTa_'�'.i�Y.j�'�'�'E'�."'�'.����`„ _ _++�. r�:r-.+a �,. -
. - s. P' _ ar• t.+.N-- ui�r _a..l. _.aca il.y,�jji.�'�'Zn �ssi..
ip
a
the
paved
7
port i f tie
Park Street
Church property.r the sewer
d
water
lines could be
shifted to
the north,, with the sewer
10
north
of the street
center line
and the water 10 south of
center Ii-ne. there will
also be storm
drainage facilities
the
north
side of the street.
Between Station 1+ 00 to 30 + 00 we expect the owner on the
south 11.1 dedicate a 30 foot l street right of way.
Between Station 1 + 00 t the church has dedicated a 30
food wide street but has constructed a wider paved width, with
the extra width to be 1 -1 -sed for parking. between +
, the owner on the north will dedicate a 30 f 1 street
right of way.
f You show the water line n the east edge of the 80 f oot
street right :,E. way from t + .00. There is a fence
line-, underground gas l i ne and overhead power line 1 west of
right of way lire in this area * You may have to go nearer to
the edge of oil to get through this area.
5. Station 43
diameter to the
+ 00 --_y
The
waterline to
the motel should.
be 8"
first
fire
hydrant,, than
611 diameter from
there
.
Station
47 + 6D
i-- Please install a 10 x 10 Tee with west
end
plugged
future
extension to west.)
wouldlike
to have
a 51
minimum cover over the water line
throughout
the length
the
proDect.
8. Sanitary Sewer Line
wouldWe like have the stub out
shown on the profile of the plans.(ie.
4843.55 etc.)
sizes and elevations
south stub out
We would
like to
match
the 0.8
diameter points i
establishing
the flow
line
grades
for the stub out t
wouldWe like to see line size (811-1211 etc . dlLrection
. { etc.) 1 evert mon shown for each line at each manhole
possible.
9. Backfill Specifications
Spec. 02713 - 2.01C gays backfill mater it ire the Pipe Zone
i 11 maximum particle i o 3/411*
Spec 02713 - 3.06C says no rocks larger than 1 1/2"0
Which is correct
+•--'-
We would still like to see a though street between Sth west
and the N -S county road at 1500 West, If it can't be where thILS
12?1 waterline goes, perhaps it can be on the south side of the
subdiviion # We need. to discuss this further.
Thanks
JAL/ jw
John.
vIV _ r1r, -1 .IF
City Engineer
TO : John Millar - Forsgren Associates
FROM: Jae Laird, City Engineer
Subject : dater & Sewer @ Comfort inn Motel
As per our previous
extending the sewer
the canal bank. In
the possibilities -of a
pre --pressure line.
has been eliminated
1� 1Y_ � ___-t_Y T
discussion, the City is interested in
at the Comfort Ian farther to the south to
sur previous discussions, we had looked at
L 8't or 12'1 gravity seweror a 611t appears that the 12" size possibility
lith the construction of the S" sewer Une
Lozne motei.. i am sorry your survey
crew couldn't met the
�.��flU .ii.li VL'Itici. L1U11 5uU11 U1_1uugr1 GU give us a
thoroughly evaluate these possibilities.
chane to more
Before you proceed any farther with the graveling, paving or
curb &guy#er in the parking fat area, lei's gel together and
resolve this sewer size and location issue,
Thanks for your continued help and cooperation,
Joe Laird
JAL/JW
r
N
4
q
NILE L. BOYLE
MAYOR
STATE OF ! DAHp
OSE BACLEY, CITY CLERK
RICHARD HORNER,TREASURER
& FINANCIAL OFFICER
September 6, 1994
Mr. John Millar, O
Foragren Associate
P.O. Box 549
350 North 200 East
Rexburg, Idaho 83440
H
P.O. BOX 280
12 NORTH CENTER STREET
EBU., IDA140 83440
PHONE (208) 359-3020
FAX (208) 359-3022
RE: Rexburg Water & Sewer Improvement Phase 11 - Water & Sewer
to Comfort Inn Water to Solid Waste Transfer Building
FA Project #93224
Dear John,
Reference is made to your letter of August
Drawing attached therewith and the request
the contractors
12, 1994, the Record
for final payment to
11
1. One
week o
reflect
greater
set f the Record Drawings was returned: to your off ice a
so ago, with notations thereon request2Lng that they
the "records' or "as built" character of the project in
accuracy d/or detail
2. We are still waiting for the easementdocuments for most of
the pro ,.
.
Please
send us copies of
your water, line tests so that we
have
a more
complete hl-'Lstory
j t
4. Our 'ewer crew just completed a rather hurried check of the
condition f the completed pro3ect and found the follow2.ng
conditions that need to be addressed.
o -e #4 has water standing in it, indicating the line
has a low spot in it or a build up of dirt or debris in the
line downstream from the manhole, Do your"as built"'
records indicate this MoHIS i low r does the acne need t
be flushed out?
The lid of MoH. #7 is covered with dirt so ws could not
gain acc-ess to i
x
O M.H. #8 had water standing in it, indicating the line
has a low spot ire it or a build up of dirt or debrisin the
line downstre&m from the manhole. Do your "as built"
records indicate this M.H. is low or does the line need to
he cleaned out
D. MaHe #9 has a lot of debrl'-s in the bottom of the
manhole.Perhaps the entire line needs to be flushed out..
E. Where does the 411 pressure line connect to the ss tem
and where is � s southerly end g I assume this question will
be answered by the new Record Ii.
PleaseS. ., the air pressure tests on the sewer
line and the static water level pltti tests on the
manholes have a more complete the project,
We have no contract with R & S Construction, but, will make
payment to Walker Cross in accordance with the Annexation
Agreement as soon as the above 11".9teitems are resolved.
Very Tri �r Yours ,
Joseph A. Laird, P.2-','-
city
.2city Engineer Building Official
.A
CC
d
ism
NILE Li. BOYLE
MA YOR
ROSE BA LEY, CITY CLERK
RICHARD HORNERITFIEASUREA
& FINANCIAL OFFICER
Mr. Conrad Mitchell
Comfort Inn
1565 West Main
Rexburg, Idaho 83440
Dear Mr,. Mitchell,
" u���ll 0� �� � +� �1Q D°
STATE OF IDAHO
November
29, 1994.
P.D. BOX 280
12 NORTH CENTER STREET
RE IDAHO 83440
PIS DNS (20) 359-3320
FAX X208)�j
3�zu-3022
,
We recently made a pre -final inspection of th�in Rexburg4 A "11 be nticipating that you W1 �ornfartiin is
Inspection before Vevery Tong, wanted to brin� the �o����,�,�ng iiem� to
nehstra ion Counter
The regis
tration. counter
Provide handicapped accessibility as highlighted
Section 7 . 2 (2) , Dage I of the attached sheets ,
Handicap -ped Slee in Rooms
F1oar to Closet rod 64
B Floor to towel racks sp
Both of these d7mPr,r";n„ il,,...,.� ,-
need s to
in yellow in
inches (exzsting}
inches (existing)
Ouju i3e no more than 481t to �{�tt
above the floor (dependIng UPon the directloyl of a
I roach of the
wheel chair and its P-rC)--K*111ftY to the rod or rankq) Q 'Cl 4h
S 9 and 1) a
1 11 3 P9S& 25 3, & 4 attached.,
v- C• Battorn Of mirror is at 4111 above
more than 4011 maximum,
le�T) 'P n Ir
the floor - sl0 be no
0 P U Ss a 3 1�
maximum. 0 Should be
mum .6 (See attached sheets
V 6 & 7 for
re j
q�red clearances under the sinks.
Double Tiil-� 'Pop 6
no more tliaii 34 sr
these and other
_ . . �u� � � ule- meets 8 & attached.
3, Unisex Handica-
�X� - -
ed Rest Room x����►
:�.�. -Bottom Of Mirror is at 4611 above
%J-LA1-" �han 4Uf' maximum.
k- B -P Top of sink i s at 34 1/ 2 " above
2411 -T.axA
L o wed. Chick other
hawn
Yn sheets 6 & 7 a C lz-- 4--
C Water cloqpt (f n-ybi + end
k A
Iobbv
the floor and
A
lnd o -r -S -L.,
should b r -,N no
is close
A
climensions as
of 1 7"1-9 inches from�1oQrj u0es not meet handi�napped req-LiiPerne c; to tai Of seat. -nr t L
e
E
IF
d. reeds grab bars at hack and side. See sheets 10,11., & 12
attached .
i� Snap dispenser not reachable- by handicapped. Both soap
dispenser and towel dispenser should be no more than 48'1 to 54'i
above the floor depending upon the direction of approach of the
wheel char and its proximity to the dispensers. Allso, the
locat-ion of the dispenser �s a factor, i.e. does tl-ie handicapped
person have to reach over the towel dispenser to reach the snap
dispenser.., See sheets 2,3 & 4 attached.
F. This restroom should liave handicapped signage as will as
the existing men/women sign. See sheets 15 & 16 attached for
signs. Handicapped parking spaces should also have signs,
Hallway - Telephone & Protruding,_gI2���ts
dee sheets 16 & 17 for handicapped space requirements for
telephones. Note also that an object such as a telephone,
drinking fount-ain, sc;ft drink machine, etc., can only protrude
into the hi,:illway a distance of 4 inches or less before it is
considered a "Protruding ObJect". If it protrudes more that 4
inclles, it mush be considered under Section 4.4 Protruding
Objects, which requires advance protective barriers with bottoms
at 27 inches or lower) to warn the blind or visually impaired of
the protruding objects. (See attached sheets 18, 19 & 20.)
Nate also that minimum hallway dirillensions need to be maintained
over and above the width of the protruding abjeet ( s, ).
Door Openi Force - - When we were at the motel, your crews
were still working on the doors. At that time they were much
boa hard to open. Also, a number of the doors were not
latching as they close. -.,d; that is, they appeared to be dosed but
the closing mechanism hadn't pulled the door tightly cased
enough so that the latch had engaged.
Opening an iz� Lerior door should. only require a 5 lb . Farce to
open it. (gee page 26)
pelS'. Stairway Handrsc-tils-attached attached sheets 21 thru 25 for
information on handrails. Items that need attention
A6-4.9.4 (1) The inside handrail on switchbacks or dog
legs sha1l always be- continuous. (See Figures 19 (a) and (b),
pg. 22.
B. If handrails are not continuous, such as at the tops or
bottoms of stairs or the outside handrail at landings, They
shall extend at leash 12 inches beyond the top riser and at
least 12 'Inches flus the width of one triad beyond the bottom
riser. At the -toy, the extension shall be parallel with the
floor or ground surface. At the bottom, the handrail shall
continue to slope for a distance equal to the width of one tread
from the bottom riser; then, the remainder of the extension
shall be horizontal (see Fig. 19(c) and (d)). Handrail
extensions shall comply with Sectiori 4.4 - Protruding Objects,
also .
It doesn'-t-
appear
that there
is enough room at the bottoms of
some of
the stairs
to provide
the required extension before
:T
Mr
coming to the corner of the hallway.
suggestions as to haw you feel this
can best be provided..
If
We are open
bottom handrail
to
extension
�:. '.Uxie inside, handrail from the landing to the end floor
uaesn'i provide the required 1 1/2 inch clearance between the
handrail and the fiat board adjacent to handrail.
D. Gripping surfaces shall be uninterrupted by newel posts,
oiler construction elements, or obstructions.
E. Ends of handrails shall be ezther rounded or returned
smoothly to floor, wall, or post.,
? . Plc,�ase nose attached information regarding handica-p-ped access to
swimming goals and hot tubs(see sheet 27 attached) .
Thank you for your attention to these 'Items. If you have any
questions, bet's het together and discuss them,
JAL / jw
Enclosures
Very Truly Yours,
4
i�
Joseph A. Laird, If. E.
City Engineer 1 Building Official
ff
NILE L. BOYLE
MAYOR
OR
ROSE BAG LEY, UTY CLERK
RICHARD HR, TREAuP.ER
TINA NC IA L CFFa E
Mr. Conrad Mitchell
Comfort Inn
1565 West Main
Rexburg, Idaho 83440
Dear Mr .
Mitchell,
r
STATE OF IDAHO
November
29, 1994
We recently made apre-final inspection of the Comfort Inn
in Rexburg. Anticipating that you will be asking for a Fl*nal
T YMP
_ 7 i H � • � ..
F.O. BOX 280
12 NORTH CENTER STREET
REX BURG, IDAHO 83440
PHONE (208) 359-3020
FAX (208)359-3022
pees
3LU�NU�: L Uz� Du�.ur•e very yang, i wantect to bring the follow'oing items
your attention .
1. Registration Counter
provide handicapped
Section 7-.2 ( page
The registration gaunter
accessibility as highlighted
1 of the attached sheets,
2. Handicapped in Roo -ms
A . Floor to closet rad --- 54
B . Floor to towel racks 60
'i -i f fl n T f' I'1 f5 ['+ t'7 A i 41 _
needs to
in yellow h -i
it {existing}
inches existing}
u�111ullSl011b Saluul�z ia� no more Vxan 48" to 54,:
above the floor (depending upon the direction of approach of the
wheel chain and its pro�im��y �o tie rock or racks � _ :��� �; mirclIc
5,6 and 38, pgs. 2,3, & 4 attached.
C. Bottom of mirror is at 4111 above
more than 4011 maximum.,
to
the floor - should be no
Do '.Uop ot sink is at 35 1/211 - should
maximum . (See attached sheets 6 & 7
required clearances under the sinks.)
E . Double Tub Bars (See sheets 8 &
be no more than 3411
for these and other
9 attached.)
3. Unisex Handicapped Remit Roam near lobb
As Bof mirror is at 46F' above the floor and shotild
more than 4011 maximUm .
B . Toga of pink is at 34 112t' above
34"' inaximum allowed., Check, other
spawn in sheets 6 R 7 attachedI"
,
floor which is dose to
under --sink dimensions
be no
the
as
�. rYdLUr Liosei t-[oiiet) does not meet handicapped requirements
of 17-19 inches from floor to top of swat.
D. Needs grafi bars at bask at -id side. Seg sheets 10,11, & 12
attached.
E. Soap dispenser not reachable by handicapped. Both soap
dispenser and towel dispenser should be no more than 4811 to 5411
above thefloor depending upon the direction of approach of the
wheel
chair,�r and Yds proximity to the dispensers. Also, the
location of the dispenser is a factor, i.e. does the handicapped
person have to reach over the towel dispenser to reach the soap
dispenser. See sheets 2,3 & 4 attached.
F. This restroom should have handicapped signage as well as
the existing men/women sign. See sheets 15 & 16 attached for
signs. Handicapped parking spaces should also have signs.
4. Eallway - Telephone & Protruding Objects
See sheets 15 & 17 for handicapped space requirements for
telephones. Note also that an abject such as a telephone,
drinking fountain, soft drink machine, etc,,, can only protrude
into the hallway a distance of 4 inches or less before it is
considered a "Protruding Object". If it protrudes more that 4
inches, it mush be considered under Section 4.4 Protruding
Objects,, which requires advance protective farriers with bottoins
at 27 inches or lower) to warn the blind or visually ampaired of
the protruding objects. (See attached sheets 18, 1 9 & 20. )
date also that minimum hallway dimensions need to be maintained
aver and above the width of the protruding object(s).4'
5. Door Opening Force- When vire were at the motel, your crews
were stip working on the doors. At that time they were much
too hard to open . Also, a number of the doors were not
latching as they closed; that is, they appeared to be closed but
the closing mechanism hadn't pulled the door tightly closed
enough so thatthe latch had engaged.
Opening an interior door should only require a 5 lb . farce to
open it. (see page 26)
G • Stairway andraiis- See attached sheets 21 thru 25 for
information an handrails. Items that need attention:
A . w4.9.4 (1) The inside handrail on sw�tchbacks or dr)n-
legs
shall always be continuous (See Figures 19 (a) and (b),
pg. 2Z.
13. If handrails are not continuous, such as at the fops or
bottoms of stairs or the outside handrail at landings, they
i
shall extend at least 12 �.�hes beyond the fop riser and at
least 12 'inches plus the width of rine triad beyond the bottom
riser. At the top, the extension shall be parallel with the
floor or ground surface. At the bottom, the handrail shall
continue to slope for a distance equal to the width of one tread
from, the bottom riser; then, the remainder of the extension
shall be horizontal {see Fig. 19(c) and (d)). Handrail
extensions shall comply with Section 4.4 - Protruding Objects,
also .
It doesn't appear that there is enough roam at the bottoms of
some of the stairs to provide the required extension before
10
coming to the corner of the hallway.
suggestions as to how frau feed this
can best be provided .
We are open
bottom. handrail
to
extension
. The inside handrail. from the landing to the end floor
doesn't provide the required 1 1/2 inch clearance between the
handrail and the flat board adjacent to handrail.
D.. gsurfaces shall be uninterrupted by newel posts,
other constructian elements, or obstructions,,
E. finds of handrails shad be either rounded or
smoothly to floor, wall,. or post,.
returned
7. Please note attached information regarding handicapped access to
swimming pools and hot tombs (see sheet 27 attached) ,
Thank you for your attention to these items..
questions, bet's get together and discuss them.,
JAL/jw
Enclosures
MFA
Truly
Yours.,
If you have any
Joseph A. Laird, I.E.
City Engineer (Building Official