Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 8 - 21-00119 - Adams Elementary School - AdditionInspection Date: 08/17/2021 File Name: 21020DFR08172021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/19/2021 4F6D3873-D2F4-4D43-BACE-DED3000AE399 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 07:15 AM Client: Madison School District Contractor: Elite Steel Erectors End Time: 03:30 PM Inspection Type(s): Epoxy Embeds/ Anchors Structural Steel and Bolting Welding Location(s): South east gymnasium entrance steel awning, Northside gymnasium entrance Steel awning Observations/ Remarks: Arrived on site around 7:30 AM and met with Frank from Elite Steel to observe placement of epoxy embedded anchors for steel awning over south east gymnasium entrance. Holes were observed to be drilled to the specified depth and cleaned, removing dust and debris, according to specification before placement of epoxy and anchors. Epoxy was observed to not be expired and was placed according to specification. Anchors were observed to be placed according to specification. Steel columns for awning were observed to be placed and tack welded, to be fully welded tomorrow according to specification. Placement of steel awning on north side of gymnasium began around 1:00 PM. Holes were observed to be drilled to the specified depth and cleaned, removing dust and debris, according to specification before placement of epoxy and anchors. Epoxy was observed to not be expired and was placed according to specification. Anchors were observed to be placed according to specification. Left site around 4:00 PM. Time summary: Travel time to site: 30 min Observing placement of epoxy embedded anchors and tack welding steel columns: 4.75 hrs Lunch: 45 min Observing placement of epoxy embedded anchors: 3.25 hrs Note: DFR end time adjusted to account for lunch. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 08/17/2021 File Name: 21020DFR08172021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/19/2021 4F6D3873-D2F4-4D43-BACE-DED3000AE399 2 Inspection Images: Inspection Date: 08/17/2021 File Name: 21020DFR08172021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/19/2021 4F6D3873-D2F4-4D43-BACE-DED3000AE399 3 Inspection Date: 08/17/2021 File Name: 21020DFR08172021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/19/2021 4F6D3873-D2F4-4D43-BACE-DED3000AE399 4 Inspection Date: 08/17/2021 File Name: 21020DFR08172021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/19/2021 4F6D3873-D2F4-4D43-BACE-DED3000AE399 5